Loading…
Loading…
1,087 results • Best match
Replacement of all old/ rusted pumping and delivery G.I. Pipelines with CPVC pipe including altering of sanitary and water supply fittings all toilets at the Directorate of Economics and Statistics building under SD-III, SVPND, APWD, Sri Vijaya Puram
Improvement of water supply in Sitanagar Ward No.6 and 7 with construction of water storage tank capacity 3.65 lakhs ltrs and overhead PS tank 1.05 lakhs ltrs, pump house and pumping lines under SD-V, CD, APWD, Diglipur
Extension of treated water supply from Lal Tikrey filter bed to Pahalgaon village under Sub- Division No. - II, NACD, APWD, Mayabunder.SW-Supplying, Installation, Testing and commissioning 03 No. water pump set one each at Takur Chand Ring Well, Nar
A/R M/O Water Supply under Sub Division No.III during the year 2025-26. SW-Replacement of rusted / damaged pipe line at Dharmapur and RC Nagar village under Betapur Section, Sub Division No.III, Swadesh Nagar, NACD, APWD, Mayabunder
R M of Water Pumps under SD-IV, CD, APWD, Diglipur during 2023-24. Sw- Providing service of Daily Rated Mazdoor for a period of 06 months for operation water supply pumps. Period from October, 2023 to April, 2024
PROVISION OF CHEMICAL EARTH PIT FOR IACCS EQUIPMENT, SPECIAL REPAIR OF EARTH PITS AND LA FOR AFNET BUILDINGS AND SPECIAL REPAIR OF UNDERGROUND WATER SUPPLY PIPE LINE AT FD WKSP COY EME AT BIRCHGUNJ MILITARY STATION UNDER GE BRICHGUNJ
A/R M/O Water Supply under Sub Division NO.II, NACD, APWD, Mayabunder. SW- Replacement of filter media for water treatment plant at Tugapur No.2, Tugapur No.6, Webi, Rest Camp under Sub Division No.II, NACD, APWD, Mayabunder.
Augmentation of Water Supply at Neil Kendra Neil Island Co Ring Well Pump House Over Head Steel Water Tank Laying of Pumping Line and Installation of 28 HP Diesel Pump under CD I APWD Port Blair SW Providing IEI
Providing parallel line from Lamiya bay check post to Aerial Bay WTP under SD-I, CD, APWD, Diglipur. Sw- Shifting of pipelines in massive earth slided at R.K Gram Ward No.5, Near Civil Supply under water supply section
A/R M/O of water supply under Sub - Division No.I, NACD, Mayabunder during 2026-27.SW-Construction of temporary stall i/c IEI at Mayabunder for organizing awareness Programme for water conservation among the villagers of NM Andaman.
AR MO Water Supply under sub-Division No.IV, NACD, APWD, Mayabunder. Sub Work - Major overhauling of 72 HP 4R 1040T Engine Coupled with DSM 100/36 Pump at Karmatang-IX Pump House under Sub Division-IV, NACD, APWD, Mayabunder.
AR MO Water Supply under sub-Division No.IV, NACD, APWD, Mayabunder. Sub Work - Major overhauling of 01 Nos. 38HP 3R1040 diesel coupled with Kirloskar make DSM 65/32A water pump installed at Jaipur Water Treatment Plant under Section-I
MOEI & Fans R/M of water supply pumpsets sub station, DG Sets, AC units lift street light etc in GPOA Complex at Sri Vijaya Puram, A & N Islands. SH: Providing Operating personnel to office of ACESD, Sri Vijaya Puram.
Annual Maintenance of the Internal Electrical Installations and Fans, Water Supply Pumpsets, Compound Lights for the Regional Station office of Zoological Survey of India at Sri Vijaya Puram, A & N Islands. SH: Replacement of Existing LED fitting with accessories.
A/R M/o Water Supply under Sub Division -I, NACD, APWD, Mayabunder during 2026-2027.SW-Boring of 01 No. Bore well including pipeline and installation of pump at APWD Guest House under SD-I, NACD, APWD, Mayabunder
Supply of Water Supply Materials and Sanitary Fittings.
MOEI & Fans, Compound Lights, R/M of Substation, DG Set, Lifts, Fire Fighting equipments, Split type AC units, Water Coolers and Water Supply Pumpsets in GPOA Complex at Port Blair, A & N Islands. Subwork/Packages: Servicing and Replacement of Defective Parts in the Down Comer Fire Fighting System.
MOEI & Fans , R/M of water supply pumpsets, street light and compound lights in the office & residential campus of MSME at Port Blair, A & N Islands. ( For the Year 2022-23) Subwork/Packages: SITC of Split Type of Air Conditioning Units in the Office of MSME at Port Blair, A & N Islands
A/R M/O Water Supply under Sub Division No.I, NACD, APWD, Mayabunder. SW-Replacement of Filter bed units, painting and other minor repair works of Pump House, CWR Tanks etc including New Entrance Gate installation at Water Treatment Plant Lucknow
R and M of Water Supply pumps under Sub Division-IV, CD, APWD, Diglipur during 2025-26. Sw- Providing services of DRM for a period of 12 months for operation of water pumps 14-04-2025 to 31-03-2026
PERIODICAL SERVICES TO BLDGS AND REPAIRS TO ROOF SHEET, PAINTING ROOF ETC AT INS BAAZ, ARMY LAND UNDER GE(I) CAMPBELL BAY AND REPAIRS TO JOINERIES, INTERNAL WATER SUPPLY, SANITARY FITTINGS, FLOORING WORK AT ARMY LAND UNDER GE(I) CAMPBELL BAY
Repair/ Maintenance of main pumping lines, pump sets, starter panels, valves chambers, sluice valves, cleaning of ug sump and over head tanks and certain repairs of external water supply installations ( E/M ) at HQ ANC, NSRY, INS Jarawa area under GE
REPAIR / MAINTENANCE OF PUMPING LINES, PUMP SETS, STARTER PANELS, VALVE CHAMBERS, SLUICE VALVES, CLEANING OF UG SUMP AND OVER HEAD TANKS AND CERTAIN REPAIRS TO EXTERNAL WATER SUPPLY INSTALLATIONS (E/M) AT HQ ANC, NSRY, JARAWA NAVAL AREA UNDER GE HADD
R and M of water supply pumps under Sub Division-IV, CD, APWD, Diglipur during 2026-27. Sw- Providing services of DRM for a period of 12 months for operation of water pumps. 14-04-2026 to 13-04-2027
REPAIR MAINTENANCE OF WATER SUPPLY PUMPING AND DISTRIBUTION PIPE LINES AND CERTAIN REPAIRS TO COOLING APPLIANCES AND MISC WORKS AT WB RJ AND REPAIR/ MAINTENANCE OF FIRE FIGHTING PUMP SETS, PIPELINES AT EOJ IN NSRY UNDER GE HADDO, SRI VIJAYA PURAM
AR and MO Water Supply under SD No IV during 2021 22 SW Providing the service of Pickup van of minimum capacity of 02 cum with fuel and driver on as and when required basis under sub division no IV
Providing 1000 Ltr. PVC tank with staging to individual house hold of GPA at Type-I Qtrs. (26 Nos.) at Chakkargaon, SD-IV under CD-II due to alternate day water supply including providing float valves (Block No. 07,08,09,10 and 11).
A/R M/O Water Supply under sub-Division No.IV, NACD, APWD, Mayabunder. SW- Supplying, installation, testing and commissioning of Kirloskar 72 HP Diesel driven engine coupled with Kirloskar DSM 100/36 water pump at Karmatang Pump House under Sub Div
A/R M/O Water Supply under Sub Division No.-III, Swadesh Nagar. NACD, APWD, Mayabunder during the year 2025-26. SW-Changing of Filter Media at Swadesh Nagar Water Treatment Plant under Sub Division No. III, NACD, APWD, Mayabunder.
AR and MO water supply under SD-I, CD, APWD, Diglipur during 2024-25. Sw- Providing and laying G.I branch line from new Ananda Marga School to the House of Shri. Laxman Mistry at Ward No.09 under Ramakrishna Gram
A/R and M/O Water Supply under Ferragunj Sub division during 2026-27. S.W- Supply of raw water (drinking purpose) i/c mechanical transport from private source to Namunaghar/Mithakhari WTP under Ferrargunj Sub Division, RCD, APWD, Wimberly Gunj.
AR and MO Non Residential building under SDI, CD, APWD, Campbell Bay during 2021 22. Sub work Repair and Renovation of old Junior Engineer Office for conversion to water laboratory test inside Water Supply Complex at Low Point, Campbell Bay.
Construction of Pump House and Development of Proposed Pond at Laxmanpur II Behind RO Plant 50000 Ltr capacity Constructed by Zilla Parishad and up gradation of existing pipeline, tapping of pipe line to existing water supply with new additional pi
Augmentation of Water Supply at Ram Nagar Pump House Neil Island Co Ring Well Pump House Over Head Steel Water Tank Laying of Pumping Line and Installation of 40 HP Diesel Pump under CD I APWD Port Blair SW Providing IEI
A/R and M/o Water Supply under SD-III, CD, APWD, Diglipur during 2023-24. SW Repair of Existing foundation for installation for 52HP diesel pump including suction and delivery G.I pipeline at Ramnagar Pump house at Ward No.08
Construction of Rain Water Harvesting Reservoir (Azadi Ka Amrit Sarovar) of size 60.00 mtr x 30.00 mtr in Revenue land for augmentation of water supply at Webi including providing and laying of pipeline under Sub Division No.II, NACD, APWD, Mayabunde
AR and MO Water Supply under SD No IV during 2021 22 SW Providing the service of Pickup van of minimum capacity of 02 cum with fuel and driver on as and when required basis under sub division no IV
Replacement of damaged and corroded water supply and sanitary pipes and fixtures, Replacing of corroded Steel ladder to terrace Replacing of damaged RCC drain cover slabs and allied civil works at Type-III/1,3,5 Quarters at DAG colony, Port Blair
REPAIR / MAINT AND ATTENDING WATER SUPPLY COMPLAINTS FOR LEAKAGES / BLOCKAGES OF PIPE LINE AND MAINT OF COMMAND SWIMMING POOL INCLUDING WATER PURIFICATION AND CONNECTED WORKS AT MINNIE BAY AREA OF AGE E/M-II UNDER GE MINNIE BAY, PORT BLAIR
A/R M/O water supply underSub Division III Swadesh Nagar, NACD, APWD, Mayabunder during 2025-26. SW-Improvement of pipeline from Panchugopal Das House to Gokul Biswas House at Harinagar village under Swadesh Nagar Section, Sub Division No.III, NACD,
Construction of Check Weir at Karmatang-X Nallah for Augmentation of Water Supply for Sub Division No. I, NACD, APWD, Mayabunder.SW-Restoration of existing check weir at Karmatang-X (Ch.1650 to 1670).SH1-Supply of G.I. pipes and Sheets
Running and Maintenance and Upkeep of water supply system at Swaraj Dweep including wheel valve operation, maintenance works, watch and valve water testing etc under CD-I,A.P.W.D., Port Blair in lieu of Realigning of gravity raw water line from beac
A/R M/o Water Supply under Sub Division No. III, Swadeshnagar, NACD, APWD, Mayabunder during 2025-26.SW-Improvement of G.I. Pipeline from Mukul Bepari house to Manoj Surein House at Prafullya Nagar village under Badamnallah Section, Sub Division No.
A/R M/O Water Supply under sub-Division No.IV, NACD, APWD, Mayabunder. SW-Supplying, installation, testing and commissioning of Kirloskar 52 HP Diesel driven engine coupled with Kirloskar DSM 80/36 water pump at Lucknow Pump House under Sub Division
A/R M/O Water Supply under Sub Division No.I, NACD, APWD, Mayabunder during 2022-23. SW- Providing and laying mainland river sand (Granular Type) for filter media of slow sand filter bed at Karmatang Water Treatment Plant at Mayabunder.
A/R M/O water supply under Sub Division No-II Tugapur, NACD APWD, Mayabunder during 2023-24.SW-Repairing of existing PVC coated chain link fencing and entrance gate at Webi water treatment plant under SD-II, NACD, APWD, Mayabunder
A/R an M/O Water Supply under Assistant Engineer, Ferrargunj Sub Division, RCD, APWD, Wimberlygunj during 2024-2025.Sub Work Improvement of Tirur nallah source by earthcutting, desilting etc and strengthening of the check weir for increasing the sto
A/R M/O Water Supply under Sub Division No.I, Mayabunder under NACD, APWD, Mayabunder during 2022-23. SW- Supplying and stacking of mainland river sand (Granular Type) for filter media of slow sand filter bed at Lucknow Water Treatment Plant.
Construction of Rain Water Harvesting Reservoir (Azadi Ka Amrit Sarovar) of size 15.00 mtr x 30.00 mtr in Revenue land for augmentation of water supply at Bajota near Anganwadi including providing and laying of pipeline at Chainpur Panchayat under Su
R and M of Water Supply under SD-IV E and M, CD, APWD, Diglipur during 2024-25. Sw- Providing services of DRM for a period of 06 months for operation of water pumps from April 2024 to October 2024