Loading…
Loading…
2,890 results • Best match
Facility Management Service- Manpower based (Version 2) - Industrial; O&M OF SEWAGE INSTALLATION; Semi-skilled, Facility Management Service- Manpower based (Version 2) - Industrial; O&M OF SEWAGE INSTALLATION; Unskilled, Facility Management Service- ... OF WATER SUPPLY INSTALLATION; ... OF WATER SUPPLY INSTALLATION; ...
Internal painting, replacement of water supply pipe, providing mosquito proof windows and allied repairs to staff quarter no. 3 at M/W station compound Chikballapur (2nd call)
Painting to compound wall and MPLS NOC Room at FF replacement of water supply line connected to BWSSB line at BG East Telephone Exchange Lazor Road Bengaluru
Internal painting and replacement of unserviceable fittings in Staff quarter No5D at 5th floor and replacement of unserviceable water supply pipeline KAVERI at CACT KR Puram BGL
Water supply through GPS based tanker to ward no 10 11 12 13 14 15 16 and 17 of 12000 ltrs in Mulki tp limits for tanks
Construction of 60 men barracks basement plus Ground plus Three storeyed RCC structure b SOs mess Ground plus firs floor RCC structure c Development work cement concrete internal roads and oaths with CC interlocking paver tiles and UG sump including ... internal water supply sanitary ...
Polyethylene Pipes for Water Supply (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6702553 Dated : 19-09-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 91224 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 30 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/8 Beneficiary : Sr. Divisional Finance Manager Second Floor, DRM office Complex, Irwin Road, S W Railway, MYSURU 570 001 (Sr.dfm/mys) Splitting
Repairs and maintenance of One No Ty C Quarters and providing external and internal water supply connections to Staff Quarter block in TE Compound at MADHUGIRI Tumkur District
Kagawad Taluk Ainapur village Primary Health Sub Center Part-1 Installation of new windows and doors of the building of the along with new electrification wiring work installation of MCB switches and switch boards, plumbing work C-with of the entire ... for water supply and ...
Construction of infrastructure Non residential and residential building for CISF 10th Reserve Battalion, at Lakkur village Bangalore in ECP mode Design and build basis. SH: Construction of Administrative building quarter guard, Ty III 16 Nos. Ty IV 6 ... installations, water supply and ...
Construction of an indoor stadium (with cellar parking ) using PEB (Pre-Engineered Building ) structure including structural steel frame work Deck slab PUF panels ACP cladding internal water supply sanitary installations, internal electrical installations, VRV, VRF Fire alarm Fire fighting lifts Networking system and CCTV at RIE Mysore SH Providing Services of Computer operator Office Assistant cum Peon at Office of the Assistant Engineer (E) MCESD CPWD Mysore and Service center Assistant for GPRA Quarters CPWD Mysore
Construction of a) 60 men barracks Basement plus three storeyed RCC Structure. b) SOs mess ground plus first floor RCC Structure . C) development work cement concrete Internal roads and paths with CC interlocking paver tilesd and UG sump oincluding ... internal water supply sanitary ...
Water supply pipe line and Rapir work at ward no.1 infront Mahesh house, ward no.34 Dwaraka Badavane, ward no.5 infront of church, Court Road, Member venkatesh house, ward no.3 infront of umamaheshwari temple, Vijaya Lakshmi medicals, sunnada gummi near mastamma temple, ward no.35 surya putra circle, ward no.34 thippanagattamma temple, Jogimatti Road road infront of maheshanna house, ward no.3 Near church and ward no.35 RR Hotel back side in Chitradurga City.
Athani Taluk Primary Health Center Kokatanur Sub Center Building Nandgaon Taluka Athani 1) Complete roof repair work of the sub center building Khoba finishing and application of dampproof chemical 2) Installation of new windows and doors (all rooms ... adequate water supply
Design and Construction of 14 Nos. Type V Quarters G plus 3 floors for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary installations, Drainage, Overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT Panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis.
Construction of A Type School Building and 9 Numbers staff quarters (4 Numbers Type II, 4 Number Type III and 1 Number Type-V quarters) including internal water supply, l sanitary installations IEI works Fire fighting system solar water heating system street light and sports lighting emergency light and signages and development of sites and builk services (roads compound wall, drains paver blocks etc) for kendriya vidyalaya at Yeshwanthapur, Bangalore, Karnataka In EPC mode ( Design and Build )Basis
hdpe pipes for water supply Experience with Gov. Required 3 Year (s) Hdpe Pipes For Water Supply ( 1500 ) Technical Specifications Specification Specification Name Values Allowed Values Specification Conformity to Indian Standard IS 4984 Latest Yes - ISI Marked true true CM/L No 2597677 - Raw Material Material Virgin - Material Grade PE 63 pe63 Dimensions Pressure Rating at 30 degree Centigrate PN 6 pn6 Nominal Diameter (mm) 32 32 Length of Pipe (Metre) 500 500 Supply Type and Colour Supply Type Coils coils Colour of Pipe black - Test Report Availability of Test Reports of from Central Govt./State Govt/NABL/IL AC accredited Lab to prove conformity to the YES - 1/2 Specification Test Report No 100-150207-09 - Test Report Date 16022015 - Name of the Lab CRI PUMP PVT. LTD. LAB - Address of the Lab 480-481, SATHY MAIN ROAD KURUMBAPALAYAM, COIMBATORE - Test Report to be furnished on request by Buyer Yes - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Murulidhara 560064, OFFICE OF THE PCMM RAIL WHEEL FACTORY, YELAHANKA, BENGALURU 1500 15 EMD Required No ePBG Required No
Construction of 327 Nos (300 Nos. Type-II, 3 Nos Type-III, 17 Nos Type-IV and 7 Nos Type-V) Residential quarters & 2 Nos 180 Nos Barracks at Group Centre (CG) CRPF, Yalhanka, Bangalore. Subwork/Packages: Providing Lighting Arrestor with strip, STP ... treated water supply pumpsets ... Qtrs, Water supply pumpsets ...
Routine valve operation of water supply for staff quarter Community centre T E Building in BSNL staff quarters compound K B Sandra Bangalore for the period of Two years
MAINTANANCE OF BUILDINGS, INTERNAL SERVICES, INTERNAL WATER SUPPLY, SANITARY FITTINGS, CLEANING OF WATER TANKS AND REPAIRS TO SUNKEN FLOORS AT VV CAMP AND IAM UNDER GE(AF) MARATHAHALLI, BANGALORE
REPAIRS TO INTERNAL ELECTRIFICATION INCLUDING METERS, CEILING FANS, GEYSERS AND EXTERNAL ELECTRIFICATIONW AND WATER SUPPLY INCLUDING FPs DBs AND APFC AT IAM AND VAYU VIHAR UNDER GE (AF) MARATHAHALLI
Project Management Consultancy (PMC) Services for Rural Drinking Water Supply Projects of Division and Sub Division offices in Kodagu District (Junior Consultant(AE) 8Nos, Junior Consultant( JE)-6 Nos )
Appointment of Consultants to Providing Project Management Consultants (PMC) for preparation of DPR for Development works like improvements of layouts & construction of arterial roads and major Roads. Storm water Drain, Building, Parks , Water Supply, UGD, Electrical work including survey and design services ,Construction Drawings for all Services, structural designs including structural Drawings for all works and bridges, Assistance in tender process. Execution and Supervision of works, assistance in billing process and Also 3rd Party for the urban infrastructure works taken up by Haveri urban development authority in Haveri District.
Providing ARCHITECTURAL, STRUCTURAL DESIGNS AND DRAWINGS for all floors INCLUDING PROOF CHECKING by reputed Government/Semi Government / IISC decided by the Department and the same has to be furnished to the Department for approval related to this ... Drawings, Water supply & ...
MAINTENNCE
Providing a 2000 Ltr capacity backup hot-water system for Harapanahalli Town Government Hospital Block B building 2000 Ltr capacity 3000 Ltr capacity hot-water system for the Community Health Centre CHC of villages under Harapanahalli Taluk 3000 Ltr ... hot water supply system.Work ...
REPAIR/ REPLACEMENT AND CLEANING OF SERVICES TANKS, UNDERGROUND SUMPS, OVERHEAD TANKS, SWTS, OPEN WELLS, FOUNTAINS AND CERTAIN MISCELLANEOUS REPAIR WORKS FOR UPGRADATION OF INSTALLATION OF WATER SUPPLY AT AFS YELAHANKA
Drilling of 1no borewell and construction of underground sump for CICEF at Jalahalli, Bangalore. Subwork/Packages: Providing Water Supply including Electrical Panel and Miscellaneous items in CICEF at Jalahalli, Bangalore.
Estimate for Arranging, Testing and Commissioning of LT Power Supply 15 HP for Drinking Water Supply at Konadasapura Village Main Road under Doddabanahalli Grama Panchayath, Bidarahalli Hobli, Bangalore East Taluk
AS PER BOQ AND TENDER DOCUMENT
Segregation Of Agriculture Load On Existing 11kv Mixed/njy/industrial/rural/town Feeder From 1.f07 Water Supply Njy Feeder To F06 Bujunaroppa Agri Feeder 2.f14 Md Kote Njy Feeder To F13nonabi Agri Feeder 3.f8 Habib Industrial Feeder To F3 Beerenahalli Agri Feeder 4.f13 Njy Nandhihally Feeder To F4 Adivala Agri Feeder 5.f19 Kc Roppa Njy Is Transfered To F13 Nonabi Agri Feeder Under Total Turnkey On Percentage Quoting Basis In Hiriyur Sub Division In Hiriyur Division
Providing hot water facility to the Dr. B. R. Ambedkar Government Post Matric Girls HostelHarapanahalli Town Harapanahalli Taluk by installing 3000 Ltr capacity hot water storage tank in Block No. 02 3000 Ltr capacity hot water storage tank in Block ... hot water supply system.Integrated ...
Upgradation of existing ESIC Hospital from 50beds to 100 beds at Hubli, Karnataka SH : Demolition of old hospital building at rear side other miscellaneous structures including disposal of debris to HDMC dumping ground / C&D waste processing plant ... internal water supply , ...
SW-I: Kodaganur( KAG): Raising of existing PF No.1 from Medium level to High level 420 mtrs & allied works 2) Extension of PF 2 -150 m length, and raising of existing PF-No.2 from Medium level to High level 420 mtrs length ( total 570 m length ) and ... damaged Water supply pipe ...
Repairs to damaged ceramic tile flooring, repairs to water proofing treatment in sunken portion replacement of sanitary installations, water supply pipes in Gents and ladies toilet blocks at CGM office Bangalore.
Work of laying a Cauvery water supply pipeline from the GLSR Tank at Yaranadahalli village up to Harish Reddys land, within the jurisdiction of Hennagara Gram Panchayat, Jigani Hobli,Anekal Taluk
Supply Of Various Categories of Manpower to the Office Of Executive Engineer, Rural Drinking Water Supply and Sanitation Division, Chitradurga and Its Sub Division Offices For The Year OF 2025-26
Conducting Topographical GIS survey, Preparation of Detailed Project report with designs & drawings and Conducting door to door survey of Households in Tiptur city for Providing Water Supply System to Tiptur City.
AS PER BOQ AND TENDER DOCUMENT
Digging of borewell and installation of motor
PROVIDING AND SUPPLYING OF DOUBLE BURNOR GAS STOVE WATER SUPPLY GLASS STEEL JUG STEEL BOWLS, BOWL, SLEEPING JAMAKHANA SPOON, COCCKER STEEL 5 LITRES AND TANKER TO 43 ANGANWADI KENDRA IN KOPPAL CONSITUENCY
Construction of Additional infrastructure at IISc campus, Bengaluru. SH: Construction of Interdisciplinary Centre for Energy Research (ICER) Building (Ground plus 3 floors) including Internal and External services of Civil, Electrical & Mechanical, ... Borewells, Water supply distribution ...
Construction of Residential accommodation consisting of 17 Nos. Type-II quarters (G plus 4), 36 Nos. Type-III quarters (G plus 4), 10 Nos. Type-IV quarters (G plus 4), 2 Nos. Type-V quarters (Ground floor), 2 Nos. Type-VI (G plus 1), MP hall ... internal water supply , ...
Design and Construction of UG and PG Hostel G plus 3 floors for Boys of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including internal water supply, Sanitary installations, Drainage, overhead terrace tanks, rain water harvesting, Internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis.
Providing services of Third party Quality Assurance (TPQA) for Construction of Buildings under 4th Phase at National Institute of Unani Medicine (NIUM) campus, Bengaluru. SH: Construction of UG/PG Academic block with library, 200 Bedded Hostal, ... internal water supply and ...
Work of providing, laying & linking 100x100MM dia DI water supply pipelines with fixing of 100mm dia valves at 1) Pillaganahalli, near Yellamma Temple 2) Raghavendra layout dead end roads 3) BK Residency, near Brahmakumari Ashrama 4) Gottigere village, opp to Bhavya Biriyani 5) Basavanapura village 6) Krishnappa layout Church road 7) Vinayaka layout 2nd cross 8) church road, Vinayaka layout 9) Infront of Jademuneshwara Temple 10) Galaxy layout, Gottigere 11) BTS layout 3rd cross coming under Gottigere S/stn of AEE (S)-1-3 sub division
Design and Construction of Physics, Maths and Computer Science Department Building (G plus 3) floors for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, Drainage, Overhead terrace tanks, Internal Electrical Installations, lightning conductor, firefighting system, lifts, LT panels, UPS, VRV/VRF, Solar photo voltaic power generation, CCTV, LAN, EPBAX, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines, underground sumps, Rain water harvesting etc. all complete on Engineering, Procurment and Construction (EPC) basis.
Design and Construction of UG and PG Hostel G plus 3 floors for Girls of 500 capacity and Dining hall Ground floor for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks, rain water harvesting, internal electrical installations, lightning conductor, firefighting system, lifts, solar water heating system, LT panel, street lighting and Development of site, bulk services including internal roads, paths, storm water drains and sewerage lines etc. all complete on Engineering, Procurement and Construction EPC basis.
Construction of office building and 4nos Staff quarters(1No. Type IV, 2Nos Type III and 1No. Type II) and compound wall, internal water supply, sanitary installations, drainage, internal electrical installations, DG set, Substation, Firefighting, fire alarm, Networking, LAN, EPABX, Solar PV system for SIB at Udupi. SH : Providing Computer Operators, Watch & Ward/Dak runner and Messenger Services for the Office of the Executive Engineer(C), Mangalore Central Division & Assistant Engineer(C), Mangalore Subdivision-II, CPWD at Yogakshema Building, NITK Campus, Surathkal, Mangalore 2026-27
Replacement of unserviceable drainage water supply pipelines of Type IV staff quarters repairs to sanitary channel 4th to 6th floor arresting leakage in DGM QA office at CACT Bldg K R Puram Bengaluru