Loading…
Loading…
5,361 results • Best match
Construction of R.C.C. O.H.T.- 200 KL/18 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -12120 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 150 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 - 14078 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of OHT TW BW PH SQ HC Laying and Jointing of Distribution System Rising Main and other appurtenant Works
Construction of RCC OHT Tubewell Pump House Staff Quarter Boundary wall Distribution system Rising Main and appurtenant works
Construction of RCC OHT Tubewell Pump House Staff Quarter Boundary wall Distribution system Rising Mainandappurtenant works
Construction of R.C.C. O.H.T.- 350 KL/18 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -19510 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of R.C.C. O.H.T.- 200 KL/16 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -12370 mtr. including supply of all materials, labour, T and P etc. complete under JJM
CONST. OF OHT 1500KL/22 M 2NOS OF TUBEWELL RISING MAIN 200 DIA DI K-9-1313 MLAYING OF 74.271 KM PIPELINE
Construction of RCC OHT Tubewell Pump House Staff Quarter Boundary wall Distribution system Rising Main repairing of existing pump house boundary wall RCC OHT staff quarter and appurtenant works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
Construction of R.C.C. O.H.T.- 75 KL/12 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -5970 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of TW, OHT, CWR, Pump House, Staff Quarter, Boundry wall, Laying of Distribution System, House Connection and allied works
Construction of R.C.C. O.H.T.- 350 KL/18 M, T.W.-1 Nos., P.H.-1 Nos., S.Q., B.W. S.L.T.C. of R.M.-40 mtr. and D.S. (200 mm to 63 mm) dia HDPE Pipe 6kg/cm2 -19510 mtr. including supply of all materials, labour, T and P etc. complete under JJM
Construction of Tube Well, Pumping Plant, Voltage Stabilizer and Power Connection with Transmission line, O H T, Pump House, Staff Quarter, Boundary Wall and its appurtenant Work. Supply of Pipe for rising main and Distribution System. Laying, Jointi
Construction of RCC OHT Tubewell Pump House Staff Quarter Boundary wall Distribution system Rising Main repairing of existing pump house boundary wall RCC OHT staff quarter and appurtenant works
Repar of Flap gate incuding Supply laying jointing of M.S. pipe with existing PSC pipe with required specials including all essential works at Hindon river outfall on By Pass pipeline of 245 MLD WTP under 100 cusec water supply scheme, Ghaziabad
Const. of 1 Nos TW by DC/DTH Rig Machine and SITC of Submersible Pumping Plant and Main Piping Valves, Chlorinating Plant, Stabilizer and other EM works under Pt.Deen Dayal Puram Awasiya Yojana (Naraini Road) Water Supply Scheme District Banda
Dewatering, excavation, taking out of excavated silt from 2No settling basin at Muradnagar Campus and disposal b/w 6.00 Km to 10.00 km. distance along pipe line land or at directed places under maintenance of 270 cusec Delhi Water Supply Scheme.
Dewatering, excavation, taking out of excavated silt from 2No settling basin at Muradnagar Campus and disposal b/w 6.00 Km to 10.00 km. distance along pipe line land or at directed places under maintenance of 200 cusec Delhi Water Supply Scheme
Survey Soil investigation, Design, Supply of all materials etc. Required for construction of Over Head Tanks, CWR, Tube well, Pump House, SCADA room, Rising Main, Distribution Network, House connection, Boundary wall, MS gate, SCADA automation etc.
Maintenance Work in Vill - Ratahari Sarawa Water Supply Scheme
MAINTENANCE WORK IN RAURA WATER SUPPLY SCHEME Package 36
Laying and Replacing of damaged water supply pipe line in residential colony at 220 KV Sub-Station Mainpuri Distt. Mainpuri
Construction/Repairing of Over Head Tank, Pump house, Boundary wall, staff quarter, gate, Site development and Laying, Jointing of rising main, distribution system and Construction of New/Rebore tube wells including PLC SCADA automation
Supply, Laying and Jointing of Pipe with specials, Rising main, Construction of Tubewell, Lowering of Pumping Plant, Construction of RCC OHT, Pump House, Staff Quarter, Boundary Wall, Making FHTC etc. complete in BADAHARA RANI G.P. WS Scheme
Construction of 1 No deep tube well RCC OHT 100KL and 12m staging Laying and Jointing of approx 6934 meteKM of Distribution System and 30 M Rising Mains and Bye-Pass comprising of DI and PVC pipes House connections Pump House cum chloronome Bounda
Survey design supply Installation testing and commissioning of rising main from tube well distribution system renovation of WTP construction of pump house construction of office cum revenue collection centre, House Connection shifting of old
Supply of all materials, labour and T P for construction of remaining works as complete in all respect including commissioning, testing, trial run, defect liability and handing over complete to local body in Tanda Reorganization Schem
power connection work at basantpur water supply scheme district Gorakhpur
Power connection work at Bharroh water supply scheme district gorakhpur
Power connection work at delapar water supply scheme district Gorakhpur
Kanjadaspur Water Supply Scheme Ward-19, Nagar Nigam District- Bareilly
Civil work for water supply and drainage work for residential colony at 220/132 kv sub-station boner distt Aligarh
Construction of OHT, CWR, Pump House, Staff Quarter, MCS Room, Ground Water Recharge, Laying of Distribution System, Rising Main, Providing House Connection etc.
as per tender doc
Construction of OHT, P.H., S.Q., Boundary wall, approach road, Supply, laying and jointing of rising main and distribution system, repairing of existing OHT, P.H., S.Q., boundary wall etc. and construction of tube well including PLC scada automation
Construction of 1 no OHT 1900kl/20m distribution system with electro fusion jointing 25025 m Rising main 220 m pump house Staff quarter house connection 3133 and related electrical mechanical works with scada etc works
Construction and Repair of OHT, Distribution System Pump house, Staff Quarter, Construction of Boundary wall, Staff Quarter and approach road House Connection and E and M Scada work etc
AS PER BOQ
LAYING AND JOINTING OF PIPE LINE EXTENSION / REPLACEMENT AND MAKING HOUSE CONNECTION
RCC OHT, PH, RM, Distribution System, Staff Quarter, Boundary wall gate. Site development, Supply, laying jointing of rising main, distribution system, House Connections, along with renovation, repair and painting etc. of existing facilities
Construction /repairing of OHT pump house boundary wall staff quarter gate laying jointing rising main distribution system construction of new/rebore tubewell including PLC SCADA
Construction of OHT TW PH laying jointing of water distribution Network and making house connections
construction of oht, pump house, distribution system, rising main etc
Construction of Over Head Tank, Pump house, Staff quarter, LCS room, Boundary wall, approach road, Site development, Supply, laying and jointing of rising main and distribution system, construction of tube well including PLC scada automation
Supply of all materials, labour, T and P etc. for Construction of Over Head Tank, CWR, Pump house, Staff Quarter, Boundary wall, gate, Site development, Supply laying, jointing of rising main, distribution system etc.
Construction, Repairing of Over Head Tank, Pump house, Boundary wall, staff quarter, gate, Site development. Laying and Jointing of rising main, distribution system. Construction of New, Rebore tube wells including PLC SCADA automation
Construction of Over Head Tanks pump House CWR Boundary walls Staff Quarters Repairing of existing pump houses Distribution System House Connection Rising Main Tube Well Works Scada etc complete for Mahmudabad Nagar Palika Parishad Reorganization
OHT Tubewell Distribution System Pump House House Connection
water supply