Loading…
Loading…
5,813 results • Best match
ADDL DINDORI INDUSTRIAL AREA M and R to WSS Addl Dindori Talegaon Akrale Industrial Area Rejuvenation of WTP filter with ACPRS and miscellaneous works
Providing services of Security Guards At.Gondia Office taki, Goal Taki, WTP Kudwa, Katangi, Suryatola ESR, Bhimnagar, Civil Line ESR, H/W Dangurli etc complete
Providing and supplying Liquid Chlorine Gas in cylinder of 900 kg each confirming to IS 646/1986 and as per the conditions and specifications including all necessary transportation, loading, unloading all required labour charges etc. and as per direc
As Per Tender Documents
Connecting Main, Balancting Tank, Raw and Pure Water Gravity Main/ Rising Main/ RW Pumping Mahcinery,RCC ESR, WTP, Distrtibution System Pumping Machinery, Solar Plant etc.
MALEGAON WATER SUPPLY SCHEME TQ. ARDHAPUR DIST. NANDED DESIGNING PROVIDING ERECTING TESTING AND COMMISSIONING OF DISTRIBUTION TRANSFORMER CENTERS 11 KV LINE FOR HEADWORKS AND WTP.
For giving power supply 1nos of 3 Phase PWW connection, load 22.4kW 28kVA, Appl.ID.48858249, at. Survey No. 1, Pinjar WTP Januna Village, Tq.Barshitakali Dist.Akola
Supply of RCC Splice chamber (As per tender specification)at different locations under DE TP, Pune and Panaji(Goa) units of WTP SMA, Pune Area.
DG RATNAGIRI INDUSTRIAL AREA...M and R to Water Supply Scheme at Ratnagiri.... Annual Comprehensive Maintenance with Upgradation of online laboratory equipments at WTP, Chalkewadi.
Plantation Service - Business Centre Maintenance of Garden at Administrative Building and Rest House premises at Gumgaon Mine by deploying 2 unskilled Manpower above ground, Plantation Service - Welfare Centre Maintenance of Gardens at Mine Manager ... Premises Filtration Plant Peripheral ...
Kurkumbh Indl. Area...M and R to Water supply scheme at Kurkumbh...Supply of poly aluminium chloride (PAC-AC) in liquid form at WTP 2025-26
Supply installation testing commissioning of VT Pump at mandir Lake Strengthing and Repairs of MBR and misc. electromechanical work at WTP 1 in khopoli municipal council
Repairing and Maintainance of Goutam Compound Navivasti, Shanti Nagar, Pogaon, Noori Nagar, Aazad Nagar Chlorination plant and Varala WTP by Providing Labour Services Year 2024-25
Supply and Erection of Vertical Turbine Pumpset Discharge of 396 cum.hr and total head of 49.2 mtr n Allied works at WTP for Shrirampur Municipal Council
Work
Udgir Water Supply Scheme (Under AMRUT Abhiyan) Tq Udgir Dist Latur (Pumping Machinery Works)
WRITING TABLE ( DOCTOR ), COMPUTER TABLE, ALMIRAH ( 6 CAGE ), ALMIRAH ( 4 CAGE ), EXAMINATION TABLE WITH STORAGE, REVOLVING CHAIR ( DOCTOR ), REVOLVING CHAIR (COMPUTER WORK), OFFICE CHAIR, REVOLVING STOOL, RACK, CELLING FAN, WAITING BENCH ( 4 FEET ), ... ), RO PLANT , ...
DESKTOP PC I3 Acer, 12th Gen, 8GB Ram, 512 SSD/HDD ( 1 set ), Dual Desk As Per Instructions, Inverter KVA With Battery 160 Amp Tubular ( 2 set ), Laptop Intel R Core I5 ACER., RO PLANT 250 L ( 1 set ), Printer Canon OR Brother, Water Cooler 80 Liter Capacity
SOLAR STREET LIGHT (Q3), GHIGHWADI ANGANWADI SOLAR PLANT (Q3), KHUTWADWASTI SHALA W ANGAN WADI RO PLANT (Q3), KHUTWADWASTI SHALA W ANGAN WADI SOLAR PLANT (Q3), GRAPNCHYATMAGIL VIHIRIWAR SOLAR PANNEL PLANT FOR DAY USES (Q3), GANDHI HOSPITAL MAGE SOLAR PANNEL FOR DAY USES (Q3), SATHVAN VIHIR SOLAR PANNEL (Q3)
IMPELLER FOR ETP UF FEED PUMP P-04-A/B/C OF ETP UP- GRADATION PROJECT UF-RO PLANT, PUMP MAKE: M/S. SPX FLOW TECHNOLOGY, PUMP MODEL: CN125-315 G6M2L3-A6, PUMP SR.NO. 21-064257, 21-064258, 22-070885, PART NO. 0120 OF DRAWING NO. 3408114-10
Conversion of Incoming HT line from 22KV to 33 KV consisting of Providing erecting 33 KV or 433 volt Transformer kiosk and allied Equipments At Visawa Wtp
M and R to Wss at Sinnar Indl area Repairing and strengthening of RCC structure providing and applying insulation coating at MIDC pump house at WTP sinnar
Providing and installing pump house floating pump arrengement at peshwe Talav and holkar talav and laying rising mains from both the talav to WTP jejuri municipal council.
Head works, RW Rising Main, Pure Water Rising Main, Pumping Machinery, RCC ESR/GSR, Distribution system and Additional repairing works at WTP and Mahuli Head works etc.
Indapur Indl. Area...Indapur Water Supply Scheme...Replacement of 300mm RWRM by providing, laying, jointing 450mm DI K 9 Pipe at Chandgaon Jackwell to WTP at Indapur.
M and R to Water Supply Scheme for Wai Indl Area Operation and Maintenance of Water supply Scheme for one year 2024 2025 WTP and Industrial Area
Ahilyanagar Industrical Area M and R to Centralized water supply scheme at Ahilyanagar Annual maintenance contract of pumps and motors at jack well and WTP 2nd Call
Providing Electric Connection Through Underground 11KV Cabling Work at Proposed Headworks with 200 KVA Compact Substation and 100 KVA Compact Substation at Package Type WTP including RMU
Repair, Maintenance and Installation of Plant Systems/Equipments - Industry Unit; Lining of one time contract for SandCarbon replacement and other misc work in WTP I II; Buyer
Bi-Annual Operation and maintenance of Electrical and Mechanical installations.
Mandrup Water Supply Scheme Tal S Solapur Dist Solapur Designing Providing Erecting commissioning and testing of Pure Water Pumping Machinary with allied electrical and mechanical works at WTP
Providing installing testing and commissioning powersupplyforNewL.T.connectionwith HT Line andother allied electrical work for making power supply for RW pumping at Nimkawla and PW pumping at Barafgaon WTP site.
DG - LOTE-PARSHURAM...M and R to Lote-Parshuram Industrial area... Enhancement of water quality by Improvement in filterability and media replenishing in Filter bed at WTP Lote.
DG - LOTE-PARSHURAM...M and R to Lote - Parshuram Industrial Area. Providing Pre-Chlorination arrangement for Lote WTP and Comprehensive AMC of existing Chlorinators including allied works etc.
REPAIRS OF LEKAGES IN DISTRIBUTION SYSTEM (FOR WITH and WITHOUT CONCRETE ROAD),DISCONNECTION OF EXISTING WATER CONSUMER CONNECTION,OPERATION AND MAINTENACE OF 3.00 MLD WTP FOR ONE YEAR.
AMC WORK
DG - ROHA INDUSTRIAL AREA...M and R to WSS at Roha Construction of new RCC tank for Alum storage with over head bridge for flash mixer at WTP Roha.
Providing installing testing and commissioning power supply for new L.T. connection with HT Line and other allied electrical work for making power supply for PW Pumping at WTP Site
M and R to water supply scheme for Pen Alibag Region.... Replacement of 22 KV HT metering cubical with allied accessories for Pure water sub station at WTP Poynad.
Providing, Erecting and Commissioning of Compact Indoor Type Substation with 100 KVA , 11KV/433 V Transformer and 11 KV HT Cable 50 sq. mm with allied work for WTP
Designing, Providing and Constructing Intake well, Connecting Main Jack Well, Cofferdam, RCC Approach Bridge, WTP, MBR CUM ESR and Providing, Installing and Commissioning Raw and Pure Water Pumping Machinery.
NAGOTHANE HOUSING INDUSTRIAL AREA... M and R to WSS for Nagothane Industrial Area...... Annual maintenance of developed lawn, garden, shrubbery and plantation in WTP and Colony premises at Nagothane.
2.Designing,providing,Installing,Commissioning of 215 Hp VT Pumping machinery and Electrical and mechanical work at Raw water Bahe and Pure water Janata Vidyalaya and Hatti talav WTP
DG BUTIBORI M and R TO PWSS EDS and Residential Building Butibori Indl Area Maintenance of garden in WTP Wateghat Pump House Premises ESR Premises EDS Pumping Station Area.
PROVIDING AND INSTALLATION 80 LTR SS WATER COOLER AT MAGASVARGIYA MULANCHE SHASHKIYA VASTIGRUH CHANDRAPUR AS PER GIVEN SPECIFICATION, PROVIDING AND INSTALLATION 80 LTR SS WATER COOLER AT 125 JAYANTI MULINCHE SHASHKIYA VASTIGRUH AT BRAMHAPURI DIST ... LPH RO PLANT WITH ... LPH RO PLANT WITH ... LPH RO PLANT WITH ...
Providing Erecting Testing and Commissioning of Pure Water Pumping Machinery Control Panel with allied electrical and mechanical equipment at Pure Water Sump WTP 29 MLD Capacity at Datala Village Chandrapur
For giving power supply 1no of 3 Phase PWW connection load 30 HP 33 KVA in Kurum Head Works and WTP Jamthi Bk Village Murtizapur Sub Division Tq. Murtizapur Dist.Akola
Intake well, connecting Pipe, Coffer dam, Jackwell and Pump House, RW and PW Pumping Machinery, Raw and Pure Water R.M., WTP, ESR, MBR, PW Gravity Main, Dist. System, Trial run
M and R to WSS at Nashik Satpur Industrial Area Providing encasing to 700mm dia. Raw Water Rising Main pipeline at various locations from Gangapur dam to WTP at Satpur.
Providing and fixing spares for HT, LT, APFC, starters, other panels and repairing of various equipments and electrical installation for Barabangala WTP, Booster pumping stations and swimming pools of NMC