Overhauling and Servicing of Pneumatic Cylinders, rotary actuator and providing of hard chrome planting and assembling and testing of cylinders, rotary actuator of Filter Bed Nos 5,6,7 at MWSS Phase-IV, WTP at Peddapur under Singur Section, SD-II, Peddapur,O&M Division No.VIII, Patancheru
Rectification of Bridge drives, Electric Panels, Gear boxes of PST, CFL and Flash mixer and providing new 2HP motors & new 25 HP pump-set for filling OH water tank for back wash water in WTP Phase-II, SD-I, under O&M Division No.VIII, Patancheru
Overhauling and Servicing of Pneumatic Cylinders, rotary actuator and providing of hard chrome planting and assembling and testing of cylinders, rotary actuator of Filter Bed Nos 10,11,12 at MWSS Phase-IV, WTP at Peddapur under Singur Section, SD-II, Peddapur,O&M Division No.VIII, Patancheru
Construction of RCC Retaining wall of 4mts Height as protection to heavy floods all along the canal duly arranging sand bags for diverting of stream and dewatering at 735MLD WTP premises at Mallaram, Mallaram section, SD-I, Control Room, Transmission Division IV, Control Room.
Change of filter media of Patterson bed numbers 8, 11and 12 with dual media using anthracite coal replacement of damaged top and bottom channel with new MS and SS channels at Asifnagar WTP under AF beds section, SD-II, O and M Division No.XVII, Himayathsagar.
Supply delivery Fixing of 60W 120W LED street lights 90W high LED bay lights 20W LED tube lights 6sq.mm WPTC cable 40mm GI bend pipes etc at Phase-IV WTP premises Peddapur under Singur Section Sub-division NoIIO and M Division No VIII Patancheru
Repairs and replacement to water filtration chamber and other accessories at B.V Gurumurthy Swimming pool, SP road, Begumpet-200, Ameerpet Circle -39, Khairatabad Zone (Item no-03 )
Hot Display Counter, Potable water purification system Reverse Osmosis or UV based, Restaurant Table, decorative mats-- mat door coir, food service glasses and cut glass dishes tumblers bowls mugs cups saucers vases, Induction Heater, pedestal fan - as per IS 1169, PLASTIC BODY EVAPORATIVE COOLERS- DESERT COOLER
Construction of RCC Cantilever Retaining wall and open drain using nominal mix cement concrete all along the length of air vessels to avoid submerging of pump house due to Rain water at Mallaram WTP premises under Mallaram Section, S.D-I, O & M Div-XXI. Control room, Secunderabad.
Overhauling and Servicing of Pneumatic Cylinders, rotary actuator and providing of hard chrome planting and assembling and testing of cylinders, rotary actuator of Filter Bed Nos 1,2,3,4,8 & 9 at MWSS Phase-IV, WTP at Peddapur under Singur Section, SD-II, Peddapur,O&M Division No.VIII, Patancheru
Attending repairs and overhauling to 450mm x450mm CI filter wash water drain gates of Rapid gravity sand filter beds in 205 MLD WTPs of KDWSP Phase-I(Stage-I & Stage-II) and 410 MLD WTP of Phase-II at Kodandapur under SD.No.I, O&M Div.No.XI, Sahebnagar
Change of filter media of Patterson bed number 3,4,5 and 7 with dual media using anthracite coal and replacement of damaged top and bottom channels with new MS and SS channels at Asifnagar WTP under AF Beds Section, Sub-Div-II, O&M Division No.XVII, Bhojagutta
Manufacturing, supply, delivery and fixing of 440 V current collector of spring loaded sliding contact type unit to feed the power supply to the clariflocculator No.4 in 410 MLD WTP KDWSP Phase-II at Kodandapur under SD-I of O&M Div No.XI, Saheb nagar
Procurement of Kenwood make limit switches for pneumatic valves at WTPNTPC Telangana
Supply, Delivery and Fixing of Slip ring unit and laying of 4.0 Sqmm 4 Core PVC/XLPE power supply cable with fabricating and fixing new C type channels and MS pipes to Clarifloculators (CFLs) at Phase-I WTP Rajampet under SD-I, Kalabgoor, Transmission Division No-II, Patancheru
Manufacture, Supply, delivery, Installation and Commissioning of 3 Nos of 20Kg/hr vacuum feed type Chlorination Plants in Place of wornout /outlived plants of M/s. Industrial Devices make at Kalabgoor WTP-Phase-II (Pre&Post) and Peddapur Ph-IV (Pre) under Central Chlorination Cell, QAT Wing, HMWSSB
Providing of CRS masonry wall and brick masonry wall at besides and in between pump house and clear water reservoir to avoid rain water and overflow water to enter into the pump house at Mallaram WTP premises under Mallaram section, SD-I of O&M Div.No.XXI, Control Room.
Construction of RCC Cantilever Retaining wall and open drain using nominal mix cement concrete all along the length of substation and upto Pallacheruvu to avoid submerging of pump house due to Rain water at Mallaram WTP premises under Mallaram Section, S.D-I, O & M Div-XXI. Control room, Secunderabad.
Supply, delivery & fixing of 140mm dia PVC pipeline and fittings in place of existing damaged pre chlorination MS pipe line system from chlorination booster pump room to chlorination plant and at raw water stilling chamber in Phase-III 410 MLD WTP at Kodandapur under Sub division.I of O&M Div.No.XI
O&M of 33/11 KV Sub-Stations with connected Distribution Transformers and switch gear to carry out routine Maintenance with providing Round the clock services at Wyra Pumping Station, Wyra Intake Well, Brahmanapally and Thallada, Mukri Hills WTP under Wyra Segment of Khammam District from September-2023 to March-2024
Construction of Kerb stones for Internal roads (Estt. Cost Rs.8.00 Lakhs), Construction of Segment Flow diagram wall (Estt. Cost Rs.1.00 Lakhs) and Landscaping and area grading work (Estt. Cost Rs.30.50 Lakhs) at Rathamgutta WTP in Manuguru-Aswapuram Segment, Bhadradri District of Godavari Segment under Mission Bhagiratha Main Grid Work
Engaging of labour for cleaning up of 12 Nos of Filter Beds overflow channel Raw Water Stilling Chamber room Chlorination room,Alum dosing room Re curculation Pump room Desludge pump room and over head Wash Water Tank of PhaseIV WTP at Peddapur under Singur Section, SD-II,O&M Division No.VIII Patancheru
Construction of open channel drain at chemical house and at dirty B/W tank-B side, RCC retaining wall of 4 mts height all along the canal flow duly arranging sand bags for diverting of stream and dewatering at 732 MLD WTP premises at Mallaram under Mallaram section, SD-I, TD-IV, S.R.Nagar
1) O & M of specialised servie equipments LT and HT, OH lines of 11 KV/ 315 KVA substation- 2 Nos., street lights, compound lights, 250 KVA Dg sets- 2 Nos. including IEI, water supply pump sets and Comp mtce of AC units in Resdl and Non Resdl bldg ... and filtration Plant at ...
NCB for GDWSS Ph II and III Filling of OS and HS Reservoirs with Godavari Water for Rejuvenation of Musi River-Manufacture, Supply, Lowering, Laying, Jointing, Testing and commissioning of 2200mm MS PMain from Ghanpur to Osmansagar, 2400mm MS PMain ... from WTP to ... MLD WTP , ... MLD WTP , ...
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System, ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; 7 to 9; PACKAGE-5 ... System Reverse Osmosis Or ...
Laying of CC Road, UGD Pipe Line and HDPE Pipe line Main Road Ro Plant at K Anjineyulu (H) to Dead End in ward No.12 in Gummadidala Municipality under MGF 2026-27.
EXECUTION OF PIPELINE WORK AND DEVELOPING INFRASTRUCTURE TO PROVIDE RAW WATER TO TGIIC-NIMZ-ZAHEERABAD WTP
Supply,Delivery, erection and commissioning of Alum dosing pump set at alum dosing room and laying of polyethylene pipe and fixing of 100A 415V TPN Re-Wirable Fuse switch Unit along with cable at Pre-Chlorination room for Phase-III WTP at Peddapur under Peddapur Section, SD-II Peddapur, O&M Division No.VIII, Patancheru
Arresting of heavy water supply leakage and replacing the damaged 1800 mm dia Butterfly Valve Gear box existing on 2200 mm dia MS Gravity main to supply the 250 MLD of Raw water to the Phase-I Stage-II WTP in the premises of Kodandapur under sub division- I of Transmission division-III Sahebnagar.
Split AC 1.5, Mashing Maeing, Cat 6 Cable, Krone Tools, RJ 11 Clips, Crimping Tools, DP Box, Clamp Meter, DTH Signal Meter, Insulation Tap Box, Carpet, Repair of RO Plant, Stickering for Photo Frame
Laying of CC Road in ward no 16 from Nampally Anjaneyulu H to Divis RO Plant of Choutuppal Municipality under 15th FC MGF SFC Other grants Reserved Waddera ST or Waddera ST Co operative societies
installation of RO Plant Bore well and Room i)near Chetrimet School, Raju nagar,H.NO.18-8-278/2/18/A/1 and at Rajiv Gandi Nagar, Opp. Venkataramana School, H.No.18-13-9/23/10, and at GHMC Ward Office ,Jangammet,ii) Construction of Community Hall Ground floor Opposite: Mannat Heights apartments in Jamal colony, Rakshapuram and Drilling of Bore well at Opposite: Mannat Heights apartments in Jamal colony, Rakshapuram iv) Construction of Community Hall first floor opp. Mannat Heights Apartments in jamal colony, Rakshapuram in Chandrayangutta Assembly constituency Under SDF 2023-24
Supply,delivery and fixing of 5 HP 12 stage submersible pump set into 6.5 inchs bore well along with GI pipes, cables and starter panel board and laying of MS pipe and other necessary accessories near Phase-III Pump House for water supply in the ... Peddapur WTP campus ...
Renovation of Chemical store house duly removing the damaged Doors,windows and ventilators and fixing new pre-cast RCC Grills in place of windows and ventilator, Powder Coated Mild Steel doors in place of damaged doors and Plastering to the slab of ... Phase-II WTP Kalabgoor ...
Annual Maintenance to Academic Block A B and C Painting of Corridors lift lobby staircase areas and railing etc at IIT Hyderabad Kandi
Laying of CC Road in ward no 16 from SK Divis RO Plant H to Avula Isthari H of Choutuppal Municipality under 15th FC MGF SFC Other grants Reserved Waddera ST or Waddera ST Co operative societies
Supply, Delivery and Laying of Filter sand media, Grit and Pebbles including removing of old media, grit AC pipes, Plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, Relaying of new sand media, grit and pebbles ... Phase-II WTP Kalabgoor ...
Supply, Delivery and Laying of Filter Sand media, Grit and Pebbles including removing of old media, grit AC pipes, Plastering to internal walls, epoxy painting to the internal surfaces of the filter beds, Relaying of new sand media, grit and Pebbles ... Phase-II WTP Kalabgoor ...
Supply, delivery of filter media of all grades and removing the old media including repairs and overhauling of ateral pipes of HDPE and AC perforated pipes, epoxy painting to the internal surfaces the filter beds and laying of new media of different ... MLD WTP of ...
NAP WTP Repair works at 4MLD at Borancha (v) of Manoor (M) in Nayarayankhed Constituency of Sangareddy District-supply delivery fabrication and removing of existing MS Plates and fixing of intake well base plate of 6mtr dia with MS 100X50 mm channel and 65X6 mm angles, 5mm Chequered plate with manhole cover and painting with enamel block paint two coats etc complete all labour charges at site work.
Manufacturing,supply, delivery and fixing of mobile 37.5KW/50HP submersible sludge pump with a discharge capacity of 200cum/hr with a head of 40 meters including standard control panel, power cable and heavy duty braided hose pipe and all necessary ... MLD WTP at ...
Annual Maintenance Contract of i) 2200 mm dia / 2375 mm dia MS pumping main 76 Kms and Gravity main of 38 Kms from Kodandapur to Sahebnagar, 9 ML & 9 ML Clear water reservoirs of Phase-I, 18 ML Clear water reservoirs of Phase-II and Phase-III in the ... iv) Water Treatment Plants of ...
Ceiling Fan 1200mm sweep Make Usha or Bajaj or Havells, PVC copper wire 1.5 sqmm single core Make Polycab or Havells or V Gaurd, PVC socket 5 Amp Make Anchor or Havells or Polycab, Switch socket combination 15 Amp Make Anchor or Havells or Polycab, ... KL RO plant Make ... KL RO Plant , ... KL RO plant Make ... KL RO plant Make ... KL RO plant Make ... KL RO plant Make ... KL RO plant , ... KL RO plant , ...
Supply, delivery of filter media of all grades and removing the old media including repairs and overhauling of lateral pipes of HDPE and AC perforated pipes, epoxy painting to the internal surfaces of the filter beds and laying of new media of ... MLD WTP of ...
Transportation of chemicals like Alum, Lime, P.E, Sodium Chloride, Sodium Carbonate, Resin, Potassium Chloride, Potassium Fluoride, Hydrochloric Acid, Graphite Crucibles Sleeves , Argon cylinders from Stores TPL Godown to WTP
Supply delivery and laying of filter sand media and grit including removing of the old media epoxy painting to the internal surfaces of the filter beds and re laying of new and old sand media and grit in Twin rapid gravity filter beds of filter bed ... MLD WTP of ...
PT Switch 5 Amp Make Anchor or Roma or Havells or equivalent, PVC socket 5 Amp Make Anchor or Roma or Havells or equivalent, PVC wire 2.5 sqmm single core Make Polycab or Anchor or Havells or equivalent, PVC copper wire 1.5 sqmm S or C Make Polycab ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant , ... KL RO Plant Bid
Supply, delivery and laying of filter media of all grades including removing of the old media, repairs and overhauling of lateral AC/PVC perforated pipes, epoxy painting to the internal surfaces of the filter beds and re laying of new and old filter ... MLD WTP of ...
Supply, delivery and laying of filter media of all grades including removing of the old media, repairs and overhauling of lateral AC/PVC perforated pipes, epoxy painting to the internal surfaces of the filter beds and re laying of new and old filter ... MLD WTP of ...