Loading…
Loading…
963 results • Best match
Manufacturing, Supply, Delivery and Erection of LT Main Panel Board Capacity 400 Amps at Chemical House and Supply, Delivery, Repair, Rewiring and Reconditioning of Control Panel for 30 HP Compressor at Chemical House Compressor Room in WTP Ph-II at ... Kalabgoor, WTP Ph-II ...
REPAIR TO RO PLANT, STP, OFI, MECHANICAL LAUNDRY, OXYGEN MANIFOLD SYSTEM, REPAIR / RENEWAL OF LT OH LINE, LT UG CABLE, LR PANEL, STREET LIGHTS AND ALLIED WORKS AT CDA/ DAD COMPLEX AGE EM II AND REPAIR MAINTENANCE AN OVERHAULING OF DG SETS, AMF PANEL
REPAIRS TO RO PLANT, STP, OFI, MECHANICAL LAUNDRY, OXYGEN MANIFOLD SYSTEM AND ALLIED WORKS AND REPAIRS / RENEWAL OF DAMAGED WATER SUPPLY DISTRIBUTION LINE AND ALLIED WORKS AT UNIT 289, UNIT 371 AND UNIT 729 ARE UNDER AGE E/M-II OF GE UNDER GE (UTILIT
Providing shed for RO plant at Ramaraopet village under Community Development Plan in Ravindrakhani-5 (RK-5) incline underground coal mines expansion project of Srirampur area, Mancherial (Dist), T.G. (Invited under earmarked work - SCCL registered contractors belonging to SC Community only are eligible to participate)
Construction of RO plant sheds at Rompedu & JK R&R colony villages (2Nos) and Rain harvesting pits at Rompedu and Karepalli villages (2Nos) under remediation plan of JK5OC expansion project at Yellandu area. ( Invited under earmarked work- waddera / sagara (Uppara) community are eligible to participate)
Construction of Compound Wall at from side of Head Works for 8 MLD WTP at Palair in Kusumanchi Mandal under Palair Segment in Khammam District
Maintenance of Jamulamma Water Treatment Plant for 3 Months (i.e., March to May 2026) under Municipal General Funds in Gadwal Municipality
Maintenance of Krishna Water Treatment Plant for 3 Months (i.e., March to May 2026) under Municipal General Funds in Gadwal Municipality
Manufacturer, Supply, deliver, Installation and Commissioning of 20Kg/hr vacuum feed type Chlorination Plants in Place of wornout /outlived plants of M/s. Industrial Devices make 2 Nos at Rajampet WTP Phase-I (Pre&Post) and 3 Nos. at Peddapur WTP-Phase-III (Pre&Post) and Singapur MBR under Central Chlorination Cell, QAT Wing, HMWSSB in (2) Slices
Laying of CPVC pipeline at Hno 1-1-81/B/1, at Hno 1-1-77/O/2 (Javeed Police) at Hno 1-1-76/A/7 (ohd Younus) at Hno 1-1-80/B/2 and at RO plant in ward no 36 in Mahabubnagar Municipality
Manufacture, supply and delivery of Ferric Alum Grade-IV 16% strength confirming to IS 299/2012 and Non-Ferric Alum confirming to IS 260/2001 and Poly Aluminum Chloride Powder confirming to IS 15573/2005 for 205 MLD Water Treatment Plant of KDWSP Phase-I (Stage-I and Stage-II) at Kodandapur for a period of One year under SD.No.I, O&M Div.No.XI, Sahebnagar
Removal of accumulated wet sludge and cleaning of De-sludge Tank at Phase-IV WTP under Singoor Section, SD-II, Peddapur, Transmission Division No-II, Patancheru
Refurbishment of Existing 20 MLD WTP Filterbed including Replacement of Pumpset, Valves, Panel Boards, Doors, Windows, Ventilators at Alisagar 20 MLD Filterbed of Nizamabad Municipal Corporation
Replacement of damaged doors, windows and wall cabinets (In Lab) with UPVC at Phase-IV WTP Peddapur Singoor section, SD-II, Peddapur, Transmission Division II, Patancheru
Replacement of filter media candy type filter bed nos.2,3,4 and 6 with dual anthracite coal at Asifnagar WTP under AF Beds section, SD.No.II, Trans.Div.I, Himayathsagar.
Balance work of construction of Intake structure,WTP and Pipelines for four HMWS segments(Jangaon,Gajwel,Medchal and Alair-Bhongir),Sri Komuravelly Mallannasagar Reservoir as a source
Construction of Laboratory as per NABL standards at 32 MLD WTP in Gandhinagar in Jayashankar (Bhupalpally) District under O&M of Manthini Bhupalpally segment of Mission Bhagiratha
Repairing and re-construction of Brick Masonry collapsed damaged compound Wall around the Ph.I WTP rajampet Cmpus under Sub-division No.I, kalabgoor, O&M Division No.VIII, Patancheru.
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M) in Jayashankar (Bhupalpally) district under O&M of Manthini Bhupalpally segment of Mission Bhagiratha
Refurbishment and Reconditioning of existing air diffusers (Fine Bubble) at Mir-Alm WTP, at Mir-Alam Filter Beds under Sub-Division No.I, O&M Division No.XVII, Himayathsagar
O and M of 7MLD WTP Pendlipakala from 01-06-2024 to 31-03-2025 with an estimate cost of Rs:30.00 Lakhs (Reserved for ST Category)
Removing the accumulated wet silt/sludge from PSTs of Phase-III WTP of MWSS at Peddapur, under Peddapur Section, SD-II, Peddapur, O&M Division No.VIII, Patancheru
Removing the accumulated wet silt/sludge well of Phase-III WTP of MWSS at Peddapur under Peddapur Section SD-II Peddapur O and M Division No.VIII Patancheru
Removing the accumulated wet silt/sludge from clariflocculators of Phase-III WTP of MWSS at Peddapur under Peddapur Section, SD-II, Peddapur, O&M Division No.VIII, Patancheru
Laying of Pumping main from 12 MLD WTP Pandavula Gutta to Indhira Gandhi statue for Ranganayakula gutta GLBR at Bhadrachalamandal in Kothagudem District. Est. ost:Rs.150.00 lakhs
EXTERNAL AND INTERNAL AREA REPAIR AND PROTECTION OF RCC STRUCTURES OF 2NOS. COOLING TOWERS (CT-7A AND 7B) AND CWPH, WTP STRUCTURES OFSTAGE-III AT NTPC RAMAGUNDAM
Providing RO Plant at Market Yard Jainath under AMC Jainath of Adilabad District.
Laying of CC Road from H.No.3-55/1 to Yadavs Function Hall, H.No.205 to H.No.3-54, H.No.3-54 to H.No.3-39/2 ( Graveyard), H.No.2-218 to H.No.2-225 (Dowlthabad Road and H.No.3-67/5 to H.No.2-7/1 (R.O. Plant old) at Gokul Nagar Ward No. 113 Patancheru Circle-22, SLP Zone GHMC (Item No.12) (2nd call)
Providing Tandur Blue flooring for Ground floor with Civil Works, Providing Cantilivar Projection for Cellar Slab at Main Entrance Road Face, Providing Partition to the Ground Floor and Providing of Water Supply Arrangements with RO Plant at Modern Rythu Bazar under AMC., Mahabubnagar of Mahabubnagar District. ( Package Work )
Repairs to existing Toilets for SBTET Auditorium/Repairing of Drainage line/Shifting of RO plant/Laying walkway at Entrance of Auditorium of Auditorum hall and / Exterior painting to Auditorium hall/ Water proofing the roof at the entrance of Auditorium Hall etc., at Govt. Institute of Printing Technology, Maredpally, Secunderabad
1) Renovation of existing MPDO Building for Tribal Museum at Narnoor (V) Narnoor (M) in Adilabad District,2) Renovation of existing MPDO Building for Community Study Hall at Narnoor (V) Narnoor (M) in Adilabdad District, 3) Providing RO Plant at CHC at Narnoor (V) Narnoor (M) in Adilabad District.
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7025190 Dated : 22-12-2025 Bid Document 1/10 Number of Auto Extension count 3 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Repairs of existing Electrical -Damage of Poles and Servicing of the transformer of 160KVA, Repair to Earthing at WTP Pedda Cheruvu in Kamareddy Municipality Under Disaster Management Fund
Providing waterproofing treatment by supply and fixing synthetic membrane felt on Alum store room at Ph-III, WTP under SD-II, Peddapur O and M Division VIII, Patancheru.
Providing arcrylic emulsion of exterior grade paint to the external walls of main building at Peddapur WTP premises under Singur Section, SD-II, O&M Division No.VIII, Patancheru
Augmentation of Intake well at 4MLD WTP Gudur Nagalgidda Mandal of Sangareddy District supply and Installation of 10HP submersible motors three phase panel boards and other accessories etc complete all labor charges at site work
50 LPH RO with installation at Anganwadi Bogaram (Q3), 250 LPH RO Plant (Q3)
Supply, Installation, Testing and Commissioning (SITC) of CC Cameras in all the service buildings like MRS, WTP, Electrical Substations, AC Plants, STP and Water Pump Rooms in Kandi campus, IIT Hyderabad
MANNING AND OPERATION BY OUT SOURCING OF EM SERVICES FOR RO PLANT, DG SETS AT PAO OR AOC, PAO OR EME, DAD QTRS, CDA OFFICE AND WATER SUPPLY DISTRIBUTION SYSTEM AT MH SECUNDERABAD, CE FY AND CERTAIN UNITS AT ZONE IIC UNDER AGE EM NO-II OF GE U SEC
Replacement of filter media of Patterson type filter beds number 1 and 2 with dual media using anthracite coal at Asifngar WTP under AF Beds section, SD-II, Trans.Div.I, Himayathsagar.
Detailed Estimate of 10 KL clear water sump cum panel room including pumpsets at Shantinagar in Chityal mandal and supplying of lab equipments for 9 MLD WTP at Gollabuddaram
Repairs to alum Storage Room Shutter, Doors and Windows and Repairs of existing Chamber and replacement of valves at WTP Pedda Cheruvu in Kamareddy Municipality Under Disaster Management Fund
Proving acrylic emulsion paint of exterior grade paint to the external walls of sand filter beds at Peddapur WTP premises under Singur Section,Sub-divisionNo.II,O&MDivision No.VIII,Patancheru
Supply, delivery, erection and commissioning of Alum dosing Motor Pump sets 2 Nos for Phase-IV WTP Peddapur under Singoor Section, SD-II, O and M Division VIII, Patancheru
Rectification of Electro Mechanical works at PD Pally 9 MLD WTP in Nalgonda district with an estimate cost of Rs:47.50 lakhs under O and M grant 2023-24
Custom Bid for Services - Supply, Installation of 1000 LPH REVERSE OSMOSIS SYSTEM at BPCL MALKAPUR INSTALLATION Similar Category ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2)
Removal of accumulated wet sludge and cleaning of beds back wash re-circulation tank-2 at Phase-IV WTP under Singoor Section, SD-II, Peddapur, Transmission Division No-II, Patancheru
Removal of accumulated wet sludge and cleaning of beds back wash re-circulation tank-1 at Phase-IV WTP under Singoor Section, SD-II, Peddapur, Transmission Division No-II, Patancheru
Refurbishement of Existing 25.05 MLD WTP Filter Bed Near Quilla and 4 MLD Manchippa Including Replacement of Pumpset, Valves, Panel Boards at Quilla and Manchippa WTPs of Nizamabad Municipal Corporation
Removing the accumulated wet silt/sludge from PSTs and CFLs of Phase-IV WTP of MWSS at Peddapur under Singur Section, SD-II Peddap[ur, O&M Division No.VIII, Patancheru