Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
382 results • Latest
Renovation of Canal Syphon of Chitagaon Sub Minor I including desilting of Chitagaon S/M II and Kotpad Distributary
Construction of Cattle crossing at RD 10.400Km of Sankarda Distributary
Construction of Cattle crossing at RD 5.750 Km and Improvement to bank of Kupia Minor
Construction of Cattle crossing at RD 15.204 Km of Bagdary Distributary
Construction of 2 nos of Cattle crossing at RD 6.200 Km and at RD 7.400Km of Semla Minor
Improvement to Service Road including construction of 2 nos of( Pipe) Culvert at RD 0.85 Km and 1.500Km of Gadigaon Sub Minor III
Construction of drain from D.S of CD No 29 at RD 16560Mtr of T.M.C leading to the Existing drain to the River
Procurement of Laboratory apparatus for quality control Division at Bariniput Dist Koraput
Construction of Concrete Drain and protection wall in command area at D/S of CD 18.54 Km and CD at RD.19.14 Km (Near village Podapadar) of TMC
Deployment of security personnel at Spillway and Dam and its surroundings under Telengiri Head Works Division, Ambaguda
Renovation to fall at RD 11.475Km and 11.52Km of Anta Distributary.
Improvement and strengthening of service road from RD.0.00 Km to 1.58Km of Gunjiguda Minor
Improvement and strengthening of service road from RD.3.90 Km to 5.10Km including protection work of Dhanpur Disty.
Improvement and strengthening of service road from RD.0.00 Km to 1.78Km of Umuri Minor
Renovation to the VRB at RD 6.384Km of Girigaon Distributary.
Renovation of 1.5m fall at RD 4.064,4.169 and 4.289m(3 Nos fall) and protection work of Girigaon Distributary
Protect ion work with in RD.6400mtr to 6500mtr of Anta Distributary
Providing and laying Anti-Skid tiles on floor, steps and landing of Adit and Drainage Gallery of Spillway of T.M.I.P.
Writing nomenclature of dam in Odia and English on left and right flank of Telengiri Dam
Renovation of Karlahandi Disty from RD 00 Km to 1.00 Km with wall lining.
Renovation of Majhia Minor and repair of CD at RD 2.450 Km
Improvement to Pakhnaguda Disty from RD 27.050 Km to 28.050 Km ( Heavy Cutting Portion)
Raising and strengthening non service bank from RD 8.700 KM to 9.00 KM and canal lining near CD No 9 of Pakhnaguda Disty
Renovation of Mokaput Minor with repair of CD No 3 and CD No 4
Protection to U/S of CD No 55 at RD 45.320 Km and construction of inlet in non service bank of JMC
Improvement to Bagdery Disty in between RD 23.800 Km to 25.700 Km and 26.700 Km to 27.065Km
Renovation of CD No 2 of Kanga Sub Minor -1
Restoration of left bank at RD 23.980 Km of JMC
Raising and strengthening right bank from RD 24.300 km to 24.700Km and 26.350KM to 26.600 Km of JMC
Providing canal lining near CD No 34,CD No 35,CD No 36 and protection to scoured bank of JMC
Resectioning of right bank from RD 20.150 Km to RD 20.500 Km ,RD 21.300 Km to RD 21.500 Km of JMC.
Improvement to Administrative Building at Bariniput
Construction of Boundary wall for J.I Colony, Jeypore
Supplying and Installation of LED Flood light including servicing of high mast light posts at U.K.Dam
Special repair to E and F type Quarters of Project employees at U.K.P. Colony Kolabnagar
Dismantling of temporary Barrack and repair of E type,F type quarter of irrigation colony Sasahandi
Construction of road from SH 48 to right flank dam toe of TMIP.
Construction of view tower at Telengiri Dam Site, Boriput
Providing piped water supply system with construction of O.G.R, pump house, bore well of size 200 mm x 150 mm in the cluster No. I of R. and R. colony No. I of T.M.I.P. at Boriput (Balance work)
Construction of Community Centre in R. and R. Colony No. VIII of T.M.I.P. at Biriphulgumma.
Construction of mandap in R. and R. Colony No. I of T.M.I.P. at Boriput
Construction of mandap in Cluster No. V of R. and R. Colony No. I of T.M.I.P. at Boriput
Construction of office building cum guest house with compound wall at Telengiri Dam site, Boriput.
Construction of mandap in R. and R. Colony No. VIII of T.M.I.P. at Biriphulgumma
Providing piped water supply system with construction of O.G.R. in R. and R. Colony No. VII (Cluster-II) of T.M.I.P. at Dubuli
Construction of Pucca Road over Right Approach Road from Right Dyke to Toe Road, Packing of Approach Road and Construction of sloping drains in Right Dyke
Earth filling on country side slope including compaction with micro pneumatic compactor, Raligning the rock toe and construction of slope protection works of Satiguda Earth Dam
Renovation to water supply pipe lines of terraced garden of U.K.Dam
Providing lighting arrangement on Dam top road of Satiguda Dam
Providing Internal electrification of U.K.H.W. Division office , Model Room and Flood cell building of U.K.Dam