Loading…
Loading…
159 results • Latest
Construction of both side CC Guard wall with bed lining in between RD 2000m to 2150m of Nileipali Minor for the year 2026-27
Construction of both side Guard wall with bed lining in between RD 710m to 820m of Babebira Distributary for the year 2026-27
Construction of right-side Guard wall with bed lining in between RD 2458m to 2687m, RD 2750m to 2760m and both side guard wall with bed lining in-between RD 2740m to RD 2750m of Bugbuga Distributary for the year 2026-27
Construction of both side Guard wall with bed lining in between RD 331m to 380m, RD 718m to 770m and bed lining from RD 770m to 930m of Bhalupali Distributary for the year 2026-27
Construction of both side Guard wall with bed lining in between RD 2196m to 2286m and bed lining in-between RD 2057m to 2196m of Babebira Distributary for the year 2026-27
Construction of both side C.C. guard wall along with bed lining in between RD 8600m to RD 8800m of Chiplima Distributary for the year 2026-27
Construction of both side C.C. guard wall along with bed lining in between RD 9600m to RD 9750m of Chiplima Distributary for the year 2026-27
Construction of both side C.C. guard wall along with bed lining in between RD 14500m to RD 14700m of Chiplima Distributary for the year 2026-27
Construction of both side Guard wall with bed lining in between RD 4592m to RD 4748m of Debhal Distributary for the year 2026-27
Construction of both side Guard wall with bed concreting in between RD 14797m to RD 14925m of Attabira Tail Distributary for the year 2026-27
Construction of both side CC Guard wall with bed lining and fall repair in between RD 503m to 683m of Tangarpali Distributary off taking at RD 24384m of Attabira Branch Canal for the year 2026-27
Construction of both side Guard wall with bed lining from RD 20198m to RD 20298m of Attabira Tail Distributary for the year 2026-27
Construction of CC both side Guard wall with bed lining in between RD 15m to 260m of Remunda Distributary off taking at RD 19050m of Attabira Branch Canal for the year 2026-27
Construction of both side CC Guard wall with bed lining in between RD 2150m to 2300m of Putputpali Minor for the year 2026-27
Construction of both side CC Guard wall with bed lining in between RD 00m to RD 200m of water course off taking at RD 25982m right of Godbhaga Distributary for the year 2026-27
Construction of VRB at RD 874m of Kabarapali Minor of Huma Tail Distributary for 2026-27.
Construction of both side CC Guard wall with bed lining in between RD 1583m to 1823m of Khirapali Distributary off-taking at RD 20040m of Attabira Branch Canal for the year 2026-27
Construction of trough wall between RD 2250 m to RD 2470 m in Sason Distributary for 2026-27.
Construction of right-side Guard wall with bed lining in between RD 806m to RD 943m of Tope Distributary for the year 2026-27
Construction of left side CC Guard wall in between RD 19170m to 19270m of Godbhaga Distributary for the year 2026-27
Renovation and re-construction to right side of guard wall in between RD. 7792 to 7892m of Parmanpur Distributary for 2026-27.
Construction to right side of guard wall in between RD. 9525m to 9625m of Parmanpur Distributary for 2026-27.
Construction of both side CC Guard wall with bed lining in between RD 1490m to 1650m of Chhandpali Minor for the year 2026-27
Construction of both side CC Guard wall along with bed lining in between RD 200m to RD 400m of branch water course off taking at RD 917m right of water course off taking at RD 33535m right of Godbhaga Distributary for the year 2026-27
Construction of trough wall between RD 520 m to RD 600 m in Khetrajpur Minor for 2026-27.
Construction of both side Guard wall with bed lining in between RD 1574m to 1622m of Rusuda Minor for the year 2026-27
Construction of both side CC Guard wall with bed lining in between RD 1051m to 1200m of watercourse off taking at RD 4279m right of Larasara minor for the year 2026-27
Construction of CC Guard wall with bed lining in between RD 2856m to 3026m of Remunda Distributary off taking at RD 19050m of Attabira Branch Canal for the year 2026-27
Construction of ISS at downstream of the existing weir named Ayodhyasagar across river Mahanadi at Sambalpur on EPC Turn Key Basis including power connective system and operation and maintenance for five years
Construction of trough wall between RD 930 m to RD 990 m in Khetrajpur Minor for 2026-27.
Construction of trough wall between RD 560 m to RD 660 m in Bishalkhinda Distributary for 2026-27.
Construction of both side protection wall and bed lining from RD 43658.00m to 43680.20m of Huma Tail Disty. for 2026-27.
Renovation and construction to trough wall of Gambarpank Minor canal system under Parmanpur Distributary for 2026-27.
Const. Of right side Protection wall from RD 58580.00m to 58650m and both side guard wall and bed lining in between RD 58655m to 58700m of Huma Tail Disty. under Critical lump 2026-27.
Construction of both side guard wall with bed lining in between RD 1623m to RD 1808m of Rusuda minor for the year 2026-27
Restoration of Right spillway stilling basin near Spur No.01 such as precasting and laying of concrete cube of size (0.50x0.50x0.50) of Hirakud Dam for the year 2026-27
Const. Of both side protection wall and bed lining from RD 14314.00 to 14330m of Huma Tail Disty. Under Critical lump 2026-27.
Renovation of Canal System of Hirakud Dam Project of Sambalpur Canal Section Sambalpur Irrigation Division Sambalpur
Restoration of Right spillway stilling basin near Spur No.02 such as precasting and laying of concrete cube of size (0.50x0.50x0.50) of Hirakud Dam for the year 2026-27
Improvement to U/S riprap such as removing and repacking of disturbed stone pitching within RD 1222.00 mtr. to RD 1300.00 mtr between RL 605.00 ft. to 630.00 ft. of Left Earth Dam for the year 2026-27
Const, of left side guard wall and Bed lining in between RD 34640.00m to 35700.00m of Huma Tail Disty, for 2026-27.
Const. Of both side protection wall and bed lining from RD 31310.00m to 31328.20m of Huma Tail Disty. Under Critical lump 2026-27.
Construction of both side protection wall and bed lining from RD 1760m to 1820m of Chhatabar Minor of Huma Tail Disty. for 2026-27.
Construction of both side protection wall and bed lining from RD 635m to 686m of Baduapali Minor of Huma Tail Disty. for 2026-27.
Restoration of disturbed stone pitching in the U/S rip rap within RD 7130.00 ft. to RD 7390.00 ft. between RL 605.00 ft. to 630.00 ft. of Right Earth Dam for the year 2026-27
Construction of trough wall between RD 1750 m to RD 1830 m in Larpank Minor for 2026-27.
Raising and strengthening of the left bank of Sason Main Canal between RD 14600 m to RD 14800 m and RD 16550 m to RD 16750 m for 2026-27.
Construction of trough wall between RD 1400 m to RD 1500 m in Larpank Minor for 2026-27.
Improvement to Bisipali Sub-Minor between RD 1400 m to RD 2000 m for 2026-27.
Const. Of both side protection wall and bed lining from RD 560m to 649m of Wcs at RD 23188Mm/R of Huma Tail Disty. for 2026-27.