Loading…
Loading…
1,423 results • Recent activity
Remedial measures by Strengthening and Protective Coating in the RCC PSC Structures of Coal Jetty 1 Conveyor System 14 from JT 1E towards West Long Span 6 10 of TTPS in Red Gate area North Break Water of VOC Port at ECHS areas
Supply of 200NB Spool Piece and 90 Degree Bend suitable for Seal Water Suction line of Stage I and II
Repairs and Rectification Works to East side Drain from 50 A Takeup Pulley to JT 28 Building in ICHS area at TTPS
Improvement Works to the West side Drain in 595 E Road from JT 4 to JT 13 in ICHS area at TTP
Repair and Maintenance Works to the Outside of North and South Wall of Switchyard 1 of Unit 3
Supply of Ash Slurry Pump Suction Connecting Spool Piece Suitable for Ash Slurry Pump House of Stage I and II OD 274mm length1100mm