Loading…
Loading…
1,361 results • Recent activity
TTPS MechII AHP Unit IV Attending break down maintenance of APH ECO hopper equipments sea water pipe line and valves in unit IV for the period from 01 04 2026 to 31 03 2027
TTPS MechII AHP Unit I II III Attending Breakdown works in Sea Water Booster Pumps in Unit I II III for the period from 01 04 2026 to 31 03 2027
TTPS Mech II BM Unit I II III Boiler Inspection checking and opening closing of valves in Deaerator PRDS, Boiler from 18mtr to 52mtr inspecting the rise in slag level through 8 mtr peep hole door and take necessary action for poking opening closing
TTPS MechII AHP Unit III BAH Attending breakdown maintenance works in BAHIII for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle OE II Inspection, checking of pipelines of emulsifier and hydrant system and assisting to shift operator in all activities at clarified water pump house by recording the parameters of pumps, motors, diesel engine, valves and
TTPS Operation Circle OE II Inspection, checking of pipelines of emulsifier and hydrant system and assisting to shift operator in all activities at raw water pump house by recording the parameters of pumps, motors, diesel engine, valves and check