Loading…
Loading…
1,361 results • Recent activity
TTPS Operation Circle OE II Maintenance of Fire Alarm System such as Smoke detectors Heat detectors Manual Call Points and Linear Heat Detection Cables for Conveyors for the period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler for the period from 01 04 2026 and upto 31 03 2027 or till the date of completion of entire quantity which ever comes earlier
TTPS Operation Circle OE II Environmental Monitoring for Conducting stack monitoring survey in all the 5 units both at ESP inlet and outlet ducts and Ambient Air Quality Survey in and around TTPS for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle MPM II ACP Repairs replacement of failed compressor in window AC split AC renewal of worn out bed assembly tinkering of outer cover and other related breakdown works for a period from 01.04.2026 to 31.03.2027
TTPS MechII AHP Unit I II III BAH slurry trenches Removal of hard rocky clinkers boulders scrap cut pit pipes wooden pieces cotton waste empty gunny bags and other debris from Unit I II III BAH ESP APH ECO hoppers outlet slurry trenches to ash
TTPS Operation Circle MPM II ACP Stage I II III Cleaning of filters cooling coils condensers cooling towers and greasing of bearings in AC Plants and periodical overhauling of pumps equipments from 01.04.2026 to 31.03.2027