Loading…
Loading…
1,362 results • Recent activity
TTPS Operation Circle MPM II ACP Stage I II III Cleaning of filters cooling coils condensers cooling towers and greasing of bearings in AC Plants and periodical overhauling of pumps equipments from 01.04.2026 to 31.03.2027
TTPS Mech II BM Providing of safe drinking water in cans to the staff of TTPS at various locations as per the annexure enclosed from DM Plant I for the period from 01 04 2026 and upto 31 03 2027
TTPS MechII AHP Unit III Breakdown maintenance of ECO APH hoppers ash disposal system for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM II ACP Attending Emergency works in condenser, chiller pumps, CW Pumps, CW pipe lines, cleaning of AC plant equipments, assisting shift operators in changeover of running equipments etc., in AC Plant Air washer system an
TTPS MechII AHP Attending breakdown maintenance works in Unit I II III Heat exchanger discharge pipe line Tunnel pipe line from transformer yard to stage I II ash water sump and High pressure pipe line fittings for the period from 01 04 2026
TTPS Mech II TM II KWU Turbine Unit IV V Breakdown maintenance works in condenser HPBP valve LPT diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2026 to 31 03 2027