Providing and fixing of 40 nos. Hume pipe (1000 mm dia) NP-4 at different locations in mines and Cleaning n repairing of existing garland drains of length 1000.00 m and cutting of new garland drains of length 2000.00 m, at different locations in mine
Web Casting Service (Version 2) - Public Event; Live and On- Demand; 100-500; Auditorium; By Buyer; YouTube; 4K (Ultra HD) - 3840 x 2160; Up to 30 fps; H.264; MPEG- 4 MP4; MP3; Yes; Windows, Mac, Android (For Mobile devices), iOS (For Mobile devices)..
Complete onsite overhauling and repairing of 2000 GPM Pump, Name plate missing, 3CHR, Make MnP and onsite commissioning of the Pump on the base plate and alignment with the Three Phase Induction Motor in Mine w.r.t. Karo OCP, BnK Area
Making of Sheds and power arrangement in the same for the one no. of Digital Flowmeter and the one no. of DWLR Telemetry Ground Water Level Recorder Piezometer, under Karo OCP, BnK Area
Repairing of the 10 inch dia Suction Pipeline of the 2000 G.P.M. Pump Sets, in operation in Mine, at Karo OCP, under BnK Area
Repair of Internal Electric Wiring, and providing proper air ventilation arrangements at the Siding Office Coal Bill Room, DMO Receiving Section, Store, The Managers Room, The Attendance Room at Kargali PF 2 Railway Siding, in respect of Karo OCP
Providing and fixing of synthetic insulated electrical mat 06 mm thickness of ISI mark, at the locations of Electrical Equipments at the Kargali Siding PF 2, w.r.t. Karo OCP, under BnK Area.
Providing and fixing of 24 nos. Hume pipe 1000 mm dia (NP-4) different locations in mines and cleaning n repairing of existing garland drains of length 2150 m and cutting of new garland drains of length 680m. at different locations in mine for monsoo
Providing and fixing of 16 nos. 1000 mm dia NP-4 Hume pipe at different locations in mines and Cleaning of settling tank of volume 270.00 cum and Cleaning n repairing of existing garland drain of length 1645.00 m and cutting of new garland drain of l
Supply and erection of three piece nonlinear resistor type lightning arrestors along with other accessories, on the 3.3 kV OH Line, Cable jointing of the Cable and replacement of the existing G.O.A.B. Switches controlling power to the 630 kVA, 3.3 kV
Providing guard wall at entry/exit point of check posts under various projects of Hazaribagh Area
Strengthening, painting and applying Radium Sticker on Poles of the L.T. OH Line at Kargali Siding PF II, w.r.t. Karo OCP under BnK Area.
Supply, providing, testing and commissioning of Residual Current Circuit Breakers, along with other accessories in different L.T. circuits at Kargali Siding PF 2, w.r.t. Karo OCP, under BnK Area.
Repair of the Shed of the 3.3 kV by 415 V, 630 kVA Transformer and its Primary Control Breaker Switch, located at Kargali Siding PF II and Internal Electric Wiring of the same for providing lighting arrangements in the Shed, w.r.t. Karo OCP, under Bn
Supply and erection of Automatic water sprinkler system along the approach road to the weighbridges in mine at Karo OCP BnK Area.
Fabrication of Portable Shelters, with internal electric wiring to be used for providing shelter for the manpower working at Kargali Siding PF 2, under Karo OCP, BnK Area
(1) Rewinding/repairing of 360 KW 3.3 KV 1480 rpm Make- Marathon Induction Motor SL No-3F331236/9 and (2) Partial repairing of 400KW, 3.3 KV 1480 rpm Serial No- 3F330433/2 Marathon Make Induction Motor under Ashok OCP Piparwar Area.
Complete repairing/rewinding of 500 KVA 3.3 KV/440V transformer Sl No-45016 installed at Barwatola RR Site and (2) Part repairing of 750 KVA transformer 3.3kv/440 V installed at PLR Camp Site under Ashok OCP Piparwar Area.
Shifting, dismantling and laying of pipe line 8 and 10 dia of various pumps installed at Patch A as per requirement for meeting day to day requirement for duration of 6 months(during monsoon) under Ashok OCP PPR Area.
Job.1 Repairing and reconditioning of 150 LPS, 100mtr head pump Make Sykes Sl No P-2 P-5 for dewatering / providing water at filling points of Piparwar Area under Ashok OCP PPR.
Annual maintenance contract (AMC) for the period of one (01) year for 01 (one) Nos. Portable Weighbridges No. 2 (Road WB 60Te capacity Pragati make) under Jarangdih Colliery.
Repairing/rewinding of 03 Nos. Induction Motor RPM 1480, Volt 550, Nameplate Nil (A) 90KW, 550V, Sl. No. JRD/120HP/550V/01, make Kirloskar installed at Damodar Pump house (B) 55KW, 550V, Sl. No. JRD/55KW/WS/02, make Kirloskar installed at Damodar Pum
Dismantling and re-erection of Fixed Type High Mast Lighting Tower installed at Sirka OCP
Repairing and reconditioning of 02 Nos. (A) L.T. Control Panel Volts-440V, 400Amps, Make-Andrew Yule, Sl. No. JRD/Substation/OC/01 as Secondary Controlling of 150KVA Distribution Transformer Volts-3.3KV/440V. (B) L.T. Control Panel Volts-220V, 100Amp
DISSOLVED ACETYLENE GAS, LIQUID OXYGEN GAS
Repairing of 03 Nos. (A) 10KVA Haul Road lighting transformer, Volt-3.3KV/220V, Make PCN, Sl. No. PCN/841-21. (B) DOL Starter 3.3KV, Make-Andrew Yule, Sl. No. WNP/JRD/DOL/02. (C) 10KVA Haul Road lighting transformer Volts-3.3KV/220V
Repairing of (A) Repairing of Pump Upper and lower Pump body Casing and modification of new base plate Peerless Pump 800GPM, Sl. No. JWSP-08, Konar intake (B) Repairing and overhauling of Peerless Pump, 300GPM,100M Head, Sl. No. JWSP-06, New Filter P
Fabrication of steel structure (Transformer Stand) 06 Nos. for installation of Transformer at Mine place at Jarangdih Colliery.
Complete repairing of 1 MVA, 11KV/3.3KV, Name plate Nil, Unit Sl. No. 1MVA/11KV/3.3KV/JRD/01 installed at Filter Plant Jarangdih Colliery.
Installation and connection of chemical earth pit at different location of transformer under Jarangdih Colliery.
Repairing and rewinding of 325KW Induction Motor, 3.3KV, 1490 RPM, Make - GEC, Sl.No. 183002/1 of Jarangdih Colliery OCP Mines.
Repairing and replacement of LT and HT Studs with bushing and Gasket in different place of Transformer as 315KVA, 11KV/440Volt at Feeder Breaker and 1 MVA 11KV/3.3KV and 315KVA 11KV/440Volt at old bijali ghar and 500KVA 3.3KV/440Volt at babu quarter
Provision of backfilling and restoration of illegal open pits at several locations of Argada Area for a period of 01 year on as and when required basis under GM Unit, Argada Area.
Cooler Motor for 300CK Shovel (Part Nos. - Q20143736 V20143764)
Tooth Point Set (Part No. H30541155), Tooth Adapter (Part No. J20204082)
ElectrodeGouging 4 MM F Cutting 200 300A, Electrode 3 point 15 MM, Electrode 4 MM, Electrode 5 MM, Electrode Cast Alloy CI 4 MM Mchnbl, Electrode Alloy Stl Dissimilar Matrl 4 MM
Sub station accessories
Desk and Bench Set for Classroom/Training Area (Q2)
Repairing/rewinding of 250KVA 3.3KV/440V, L SI no. Syl/08 transformer installation at Sayal-D Project
Comprehensive annual maintenance contract of 02 (two) no. Of 50 MT capacity electronic road weighbridge including replacement of loadcell, repairing of digitizer, providing and fitting of junction board, cleaning, testing and adjustment of 1666 no.
Mechanical Plate Bending Machine
Horticulture work for a period of 06 months at different parks of Dhori Area under GM unit Dhori area.
Solar Street Lighting System (NTPC) (Q3)
Cleaning of New diverted Montico Nallah under Sawang GVP PH-II , Kathara Area
Cutting of Garland drain along the boundary lines of mines, dispatch road, check post and quarry under Sawang GVP Ph II OCP, Kathara Area
A) making of new coupling pinion both male and female of 65 KW 6 level haulage B) repairing and Reconditioning of 37 KW Tugger Make Rana of mine no.1 KUGP Hazaribagh Area.
A) Complete Casting machining of G.M. Bearing Bush O Level Haulage B) Reconditioning of 0L Make MAMC Haulage by making and complete fitting of New Double Helical 1st Motion Pinion Shaft of KUGP under Hazaribagh Area.
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; 3 to 5; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servicing, ..
Complete Repairing and reconditioning of 500 GPM, 150Mtr. Head 5 stage pump, Model PV II make MnP 150/200 Sl. No. Missing of KUGP, Hazaribagh Area
Complete Repairing/reconditioning of 5 stage 500 GPM, 150 Meter Head, Make MandP, Model - 100-150 IPBT 80 of KUGP under Hazaribag Area.