Hiring of Consultancy Services - Percentage based - Hiring of consultancy services for preparation of catchment area treatment plan required for forest diversion of Magadh OCP (West); Forest and Environment; Yes; Hybrid(As specified in scope of work)
Hiring of Consultancy Services - Percentage based - Hiring of consultancy services for preparation of De-siltation plan required for forest diversion of Magadh OCP (West); Forest and Environment; Yes; Hybrid(As specified in scope of work)
Hiring of Consultancy Services - Percentage based - Hiring of consultancy services for preparation of site-specific wildlife management plan required for forest diversion of Magadh OCP (West); Forest and Environment; Yes; Hybrid(As specified in scope..
Drinking water arrangement with tractor mounted tanker (5 to 6 KL) at different PAP Villages under Amrapali OCP of A-C Area, CCL.
Procurement of 33KV 800Amps onload Isolator Horizontal (Out door type) for Kathara Area, Procurement of 11KV 630Amps onload Isolator vertical (Out door type) for Kathara Area
Markin Cloth (V2) (Q3), Cotton Yarn Waste (V2) as per IS 5485 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6712153 Dated : 23-09-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Cotton Yarn Waste (V2) as per IS 5485 Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 29896 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Calibration Services - Mechanical, Thermal, Calibration of Testing equipments of Area Coal Laboratory Piparwar Area; Mass and Volume, Density and Viscosity, Temperature, Density; NABL Labs, Any other Government Approved Labs Service Provider, State..
Replacement of unserviceable silica gel with breather for protect from moisture of different transformer installed at different locations of GVP Phase-II OCP
Operator Fatigue monitor system, Rear view system Camera, Back up Alarm Audio Visual Alarm, Blind Spot Mirror, Seat belt reminder
Office Chair, Metal Drawer File Cabinet, Revolving Chair, Executive Table, Steel Almirah without Lockers, 1.5 Ton 5 Star Inverter Wall Mount Split Type AC
Repairing of 04 Nos. Starters in Saunda-D Project
Following repairing is to be done in EKG5A Shovel HMB-597 and LT E-179.
Bus Hiring Service - Regular Basis - Local 24*7; seating capacity of bus is 52 plus 1; As per specification of School bus; 37 KM run per day, Bus Hiring Service - Regular Basis - Local 24*7; seating capacity of bus is 52 plus 1; As per specification of School bus; 35 KM run per day, Bus Hiring Service - Regular Basis - Local 24*7; seating capacity of bus is 52 plus 1; As per specification of School bus; 47 KM run per day, Bus Hiring Service - Regular Basis - Local 24*7; seating capacity of bus is 52 plus 1; As per specification of School bus; 80 KM run per day
of 250 KVA, 11 KV / 440 V oil cooled lighting Transformer
Repairing and reconditioning of star delta Starter of 55KW, 550Volt Ventilation fan motor, PV-160 of KUGP under Hzb Area.
Maintenance and laying of of 120mtr 100mm dia MS/G.I pipeline for watering of earthpits around main substation of KUGP under Hzb Area.
Strengthening and reconditioning of 11KV incoming feeder no.2
Repairing of foundation of transformers at water supply and 15 No. installation of transformer
Making of cable drains and grouting at main substation
125HP, 550volt, Marathon make, Sl. No. missing and B.30HP,550volt, Crompton greaves make, Sl. No. missing
Complete repairing and reconditioning 1 No. 3.3KV 400 Amp. OCB Switch for Primary Control of 630 KVA Transformer and 1 No. 11 KV 400 Amp. OCB Switch for incoming Feeder installed at KUGP under Hazaribagh Area.
Repairing of secondary control panel of 25KVA,3.3KV/220V transformer for lighting at mines and control panel for lighting at new workshop (powered by 250KVA,3.3KV/440V transformer)of karma project under kuju Area.
Fabrication of 6 nos. of sheds for HT starters /motors set during monsoon at AKKOCP
JK Paper 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain, JK Paper 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Feeding of ROM coal, crushing through mobile crusher, loading, and transporting for quantity 12.0 LTe from Karma coal stock to Kuju New Siding for ..
Computer Paper (V3) Conforming to IS 12766 (In Packet) (Q4)
Day to day shifting of Pumps with delivery and suction pipe as requirement and dismantling, laying and joining of 6 dia and 8 dia pipeline with accessories like flange welding, rubber insertion, bend, Sluice valve and NRV etc for dewatering of qua
Repairing, maintenance of gang switch 11KV grade and 3.3KV grade gang switch of GVP Phase-II OCP
maintenance of two nos 1000 GPM Pump motor set by replacing coupling set, jetting hose and Assembly of Standby Motor-Pump Set at Tapin Open Cast Project, Hazaribagh Area.
Onsite electrical repair and maintenance of three (03) nos. Starters 3.3KV grade, 200 Amps engaged for starting of various pumps i) 3.3KV 200Amps Andrew Yule make currently engaged at coal Pump station, ii) 3.3KV 200Amps starter engaged at DD mines
Complete mechanical repairing of 165 KW, 3.3 kV, 3phase, 4pole, GEC make and 175 KW ,3.3 KV,3 phase ,4 pole kirloskar make Induction motor used in pumping operation at different location of mines w.r.t Bokaro Colliery, BNK Area
Repairing and Refilling of 58 nos. different types and capacity of Fire Extinguisher of Religara Colliery
Fabrication of 800 Amp control panel with separate outgoing for secondary control and protection of 500KVA transformer at AKKOCP, BnK Area.
Day-to-day maintenance of 33KV/11KV/3.3KV switchgears, transformer and other allied establishment of the2x10 MVA Main sub-station for 365 days with respect to AKK OCP, BnK Area.
Peripheral lighting on approach road of sub-station and at sub-station yard at 33KV/11KV main sub station Konar OCP, BnK Area
VOLTREK Cardboard / Duplex Board File Cover for 21.5 cm x 34.5, VOLTREK Cardboard / Duplex Board File Cover for 21.5 cm x 34.5 cm (FS) size document
Hiring of 01 (one) no. Petrol Driven Light Motor Commercial Vehicle (Omni Ambulance) engaged at Karo-I OCP Dispensary , BnK Area
Shifting of Kali Mandir near old Visthapit office to new managers Office under Birsa Project BarkaSayal Area
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Loading, crushing and transportation of coal from Govindpur Phase-II OCP to Jarangdih Railway Siding PF-II of Jarangdih Colliery at Kathara Area fo..
Arrangement of three phase and neutral power supply to explosive magazine to provide power to operate CCTV Camera to illuminate magazine premises and to provide power in guards shelter situated near Prem Nagar Colony at Tapin North OCP under Haza
Diversion of HT overhead line and poles along with all associated accessories and installation of 02 nos 11KV grade GOAB to create space for OB dump at Tapin North OCP under Hazaribagh Area
Diversion of 140 mtrs. 3 range pipe lines (two ranges are of 6 inch dia. and one range is of 8 inch dia.) at Tapin North OCP under Hazaribagh Area
Restoring alternate arrangement Feeder I 3.3 KV power supply to 554 electric shovel and pumping station at mine to reduce the load of feeder II at Tapin North OCP under Hazaribagh Area.
Complete and Fresh Electrical wiring of newly constructed PO office with provision of service wire and earthing at Tapin South OCP under Hazaribagh area
Providing and fixing of industrial wall fan 600mm size and exhaust fan size 600mm in club house of Tapin South OCP under Hazaribagh area
Strengthening of HT poles by muffing/collar making, painting of HT poles with marking feeder details in Parej sub station and connecting feeders to Parej substation under Hazaribagh area
Fresh wiring of officers club and Re-wiring of rest house located in prem nagar colony with provision of lighting arrangement in the newly renovated false ceiling at officers club of PEOCP under Hazaribagh area
Repair and Maintenance of 11KV OH line from Dhori Sub-station to SDOCM substation including damage pole replacement tree trimming and other accessories under SDOCM project of Dhori Area
Repairing n Maintenance of 18 Nos. of water cooler (G.M. unit-02nos., A.A.O-01 No., IWSP-01 No, Transit camp-02Nos. MRSS-01no., RHK-03Nos., Ajay Atithishala-01No., Gandhi chock-1No., Area Quality lab-01No.,Officers club-1No, Football ground-02 Nos. a