Loading…
Loading…
2,998 results • Latest
Replacement of the belt conveyor of different units 415, 227, 307, and 304, strengthening work of unit no. 304 and replacement of liner plates in the discharge chute of unit no. 415, 227, 307 and 304 of Kedla Washery
Dismantling followed by erection of electrical supply line poles at rajhara Colliery Rajhara Area
Arrangement of Series decorative lighting at Project Offices Mine Pit Offices Other establishments at Mines for Three Days on the occasion of Foundation day of CIL under Ashok OCP, PPR Area.
Providing and fixing of Jetting double armored rubber hose 8 dia with both end flange length 6m for pump installed at Pontoon under Ashok O C PPPR Area
Repairing reconditioning of 02 Nos. 2000 GPM 150 Head Mather Platt makepump (Sl No- 81231389/60/4 81231396//460/1- both MP Make) to ensure availability of thesame during monsoon period for dewatering of mine water from Patch A area of Ashok OCP
Erection of 33KV OHTL both feeder CHP and Mines from existing OHTL to upcoming site of PPR underground sub-station under Ashok OCP. (Route Length 800M/Each Feeder)
Loosening dismantling of conv. Belt 330mtr. 1000mm width for 02 nos. damaged joint made by cold vulcanized, drive pulley lagging, gear box, oil seal changing ... unit 303 belt conveyor of main plant of KW
Repairing of 4 Nos of 3.3 kV grade 200 amps starter for control and protection of 2000gpm pump at main sump installed at AKKOCP
To establish 8.4 Gbps bifurcated 1 IS TO 1 uncompressed and unshared, Symmetric Internet bandwidth via Leased Line Last mile connectivity through redundant Optical Fiber Cable at 270 Nodes of CCL command areas As per Annexure I for a Period of 05 YR
Supply and installation of SPD with isolation transformer for road weighbridges installed of AKK OCP, under BnK Area
Preparation display of mine model on them Smart traffic management in mine to be displayed at Annual Safety week to be held at Barkasayal Area.
For maintenance, repairing and reconditioning of 2 Nos HT Starter 3.3KV grade A) 3.3 KV 180 KW Prabhu make HT Starter and B) 3.3 KV 190 KW Mineline make HT Starter at Kedla Open Cast Project under Hazaribag Area
Towards repairing, rewinding and maintenance of 01 No 180 KW, 3.3 KV, Induction motor and 01 no. 90KW 550V LT motor Installed at Kedla OCP under Hazaribagh Area
Lighting arrangement and Beautification of main gate at CRS Barkakana.
Shifting, lowering and installation of 2000/1200/1000 GPM pump set with all electricals during monsoon as and when required basis in respect of Bokaro Colliery
Repairing of light vehicle road from WB No. 1 and 2 to Masilong village under Magadh OCP of Magadh-Sanghmitra Area
Goods Transportation service - Monthly Based Service - Within city; Machinery & Equipment; Pick up Van, engine 2523 cc and above and diesel version (like Mahindra Bolero Camper or equivalent)
Providing shade in front of Community Centre at Pichhari under GM Unit BnK Area
Replacement of damaged rubber buffer with damaged base frame of electromagnetic vibrofeeder of 120D, 120E and 120H of R and P gate along with feeding discharge chute of raw coal bunker main plant of KW
Off-loading reparing and maintenance works in different screens of main plant at Kedla Washery.
Supply and laying of gravel , Re-handling of cable with heightening and foundation arrangement for circuit breaker an NGR and Demand Restriction for 33kv incoming kargali feeder with allied Substation jobs at 33kv /11kv main sub-station MRSS Dhori An
Complete repairing and re-installation of 13 no. traverse pipe in Unit no 221 A and B Screen of main plant of Kedla Washery.
Towards A) Complete repairing and rewinding of 3 phase, 550 V, 120 HP (90KW) Induction motor for ventilation fan Mine no.-01 and B) for repairing and reconditioning 01 No. Star Delta Starter of motor at VIII seam in mine no. 01 of KUGP under Ha
Towards construction of transformer platform along with shed and barbed wire fencing including gravelling at KUGP under Hazaribagh Area.
Fabrication of Shed for Pump, Starter and motor at Kedla OCP under Hazaribagh Area.
Erection of a 6.6kV Overhead Line from the Transportable Sub-Station Site to the Main Sump Pump House Site for the establishing power supply for electric pumps for dewatering at Tetariakhar OCP under Rajhara Area
Dismantling of existing pipe ranges from 9no. Sump to banaglatta stand and erection through a new route at AADOCM , Dhori Area
Repair and maintenance of 02 nos motor installed in 3P sump and 02 nos motor installed for face pumping under SDOCM Project of Dhori Area
Complete overhauling of 20KVA Diesel Generator Set Sl No. G14A-21 Make -Mahindra installed at GM Unit Guest House Chandwa Rajhara Area
Fabrication of tension plate 04 nos. along with tension bolt to top tumbler of 208 unit no. middling BE and replacement of damaged/worn-out discharge chute liner plate along with mother base plate and base angle of 222,223,207 and 208 B/E of K/W
Different type of off-loading works of 122 belt conveyor of main plant of Kedla Washery
Replacement of damaged and worn-out liner discharge chute of unit 121A and B, 123 and 247 B/conv. Of main plant of Kedla Washery.
Dismantling of electromagnetic vibrofeeders and rotary piston blower and motor of C. C. Jig for rectification and modification, re-installation and realignment of the same at main plant of Kedla Washery.
Renovation of Ram nagar community centre under Kargali OCP of BnK Area
Repairing and fixing of new cradle guard in various overhead line crossing and with supply and fixing of Danger Notice Plate of tubular pole and painting of tubular pole to protect from rust which is installed from Avantika Project office to check po
Repairing of 04 nos. Joint preparation, 02 nos. GC-10 gear coupling changing, 04 nos. Bend drum lagging and 190 nos. Idler frame repairing of unit no. 116A and 133A of Pre-Washery.
Maintenance of two number of 11 KV/440V transformer installed at Avantika Project Office, Kundi and near Road Weighbridge- 16, Chamatu as well as replacement of transformer outgoing metering unit cable by high capacity at Magadh OCP, M-S Area
Stationary Lead Acid Batteries (with Tubular Positive Plates) in Monobloc Container (V2) Conforming To IS 13369 (Q3)
Belt changing of BC-133B, BC-116B, BC-118 and snub drum lagging work of BC 133B and fixing of derailed re-installation of conveyor 118A repairing of Pre Washery.
Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7007599 Dated : 20-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Primary product category Lighting Pole or Post and Hardware - Tubular Street Light Poles (V2) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 19348700 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 5 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/9 GM(MM-Pur)/HOD Central Coalfields Limited Ranchi Jharkhand, (Shri Raj Kishore)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Towards existing 440 V overhead line and re-erection with supply and fixing of stay/channel, proper earthing and Associated works.
Supply and installation of retro-reflective sign boards at important location Designing and writing of safety slogans single line diagram at 5 MVA Sub-Station (33/3.3KV) 10 MVA Sub-Station (33/11KV) Ashok Pit Office under Ashok OCP Piparwar Area.
Providing and fixing of 40 Nos. 300W LED flood light fittings for 05 Nos. high Mast light of Rajdhar Railways siding under Piparwar unit of Ashok OCP Project.
Repairing of RHS final drive planetary gear box, track roller 07 nos. (RHS) and Carrier Roller 02 nos. (RHS) of CK300D shovel sl.no B0756 of Gidi-C Colliery.
Repairing of Centralized Recommissioning/repairing of defunct CLS/Auto Lube System of 01 No. Komatsu 60T Dumper Sl. No. N10300, 01 Nos. BH60M Dumper 60T Sl. No. D60782 and 01 No. Tyre handler Sl. No. B18119 of Gidi-A Colliery.
Repair and Maintenance of Area Sales Office under GM unit BnK Area
Maintenance and repairing of 2 nos HT Starter 3.3KV grade and 1 nos Field switch (Controlling switch for pump) 3.3 KV grade for monsoon preparation at Parej OCP under Hazaribag Area.
Comprehensive annual maintenance of quarters of Kuju Colony under Kuju Colliery of Kuju Area (for a period of 02 years) as per instruction of Coal India HQ Kolkata.
Repairing of 03 Nos. of transmission pump of BEML BD355 Dozer and 01 No of steering pump of CAT 988H Pay-loader of Religara Project.