Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,066 live363 closing this weekmost from East Central Railway and Indian Railways
1,066 results • Latest
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom Design, Manufacturing, Supply, Installation, Testing and Commissioning of Electronic Interlocking System (Indoor & Outdoor) including Telecom Work at 23 Stations in connection of Doubling work of Narkatiaganj-Raxaul-Sitamarhi- Darbhanga & Sitamarhi-Muzaffarpur Section in Samastipur Division of East Central Railway" (Total- 247 Km approx.) of East Central Railway."
20 pair, 0.63mm diameter underground polythene insulated polythene sheathed jelly filled
Hydraulic press bending machine of tonnage 125 ton, Table length- 1550mm,bending capacity ( corten steel IRSM-41) 3mmx1550mm, table width- 190mm, Throat depth- 200mm, Power -10 HP, Ram stroke- 125mm, Open height - 350mm, Clear path-
CASNUB-22-NLB cast steel bogies with friction damping arrangement
DC-DC Converter of rating 60-66 V, 5A as per specification no:- RDSO/SPN/165/2012 Ver.3.0 . Suitable for Amara raja Make IPS system
VNPRF141 37 Degree Angle Probe A37-44(37 deg. F & B) make EECI
VNR7A125-PROBE HOLDER CLAMP FOR GAUGE FACE MAKE EECI
VNR8A047-BRASS NIPPLES MAKE EECI
Engineering procurement and Construction (EPC) of Construction of Viaducts, ROR/RFO, Major Bridges, Minor Bridges, Animal Underpass, RUB/LHS, Tunnel/Cut- Cover, Earthwork, Blanketing, trolley refuge, turfing, Buildings, retaining wall, toe wall etc. and other associated worksfor construction of new Double Line track for DFCC loading from Ch.158.00 to Ch.184 in Koderma Detour section in Sonnagar- Andal 3rd and 4th line project on EPC Mode in Dhanbad Division of East Central Railway.
Engineering Procurement and Construction (EPC) for "Construction of doubling work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, track works, platform work, station building, FOBs, other buildings, associated S&T and Electrical Utility Shifting works and associated miscellaneous works for 25T Indian Railway Standard Loading from KARNAUTI station(including-Ch. 2.844 KM) to BIHAR SHARIF station(excluding-Ch 29.350 KM), from Ch. 1.900 KM to 28.192 KM (Total- 26.292 km) in connection with the Doubling of the Bakhtiyarpur-Rajgir - Tilaiya section"
Earth Return Carbon Brush. CLW Specification NO :-CLW/ES/3/0017 Alt-E, item no- 14.
Engineering, Procurement and Construction (EPC) Agreement for Construction of New BG Rail line including earth work, blanketing, minor bridges, major bridges, Track works, Station building, buildings and other miscellaneous works for 25T Indian Railway Standard Loading from Sitamarhi (excluding) to Rewasi (including) (i.e.Ch. 0.700 to 12.400) (Total length = 11.70km) in connection with Sitamarhi-Sheohar New BG Rail line project in East Central Railway in the state of Bihar
Engineering, Procurement and Construction (EPC) Tender for Construction of doubling work including earth work, blanketing, minor bridges, major bridges, utility shifting, station & other buildings, platform work, circulating area, LC work and other miscellaneous works for 25T Indian Railway Standard Loading from Raxaul (excl.) to Narkatiaganj (excl.) (i.e. Ch.189.400 to 225.600) (total- 36.20 Km) in connection with doubling of Raxaul - Narkatiaganj section in Samastipur Division of East Central Railway
Engineering, Procurement and Construction (EPC) for "Signalling & Telecom works in connection with the 3rd and 4th line between Chirailapothu to Paharpur and Koderma to Pradhankhunta (exclusive) (Total- 242 km approx) of East Central Railway
Design, Supply, Erection, Testing & Commissioning of Traction Sub Stations (Scott/V connected) with associated Switching Posts (SP/SSP) for 2 x 25 KV feeding system along with provision of associated SCADA system in upgradation of Electric Traction System from 1x25KV to 2x25KV Traction System for Kumandih- Garhwa Section of ECR to meet 3000 MT loading target.