Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
1,066 live363 closing this weekmost from East Central Railway and Indian Railways
1,066 results • Latest
E-70 VIGILANCE UNIT (NEW VERSION) to FTRTIPL PART NO.- FT0051618-100
Supply, Installation and commissioning of Computerized & Automated single car Test Rig for LHB & ICF coaches as per attached specification.
Supply, Installation & Commissioning of hydraulic press C Frame vertical type capacity 200 ton with accessories. As per attached Annexure and Specification.
Balance work & other miscellaneous works of Amrit Bharat Stations Scheme at Lakhminia, Sahebpur Kamal, Khagaria, Mansi, Maheshkhunt, Naugachhia, Karhagola Road, Begusarai and other stations under Sonpur Division.
Balance work & other miscellaneous works of Amrit Bharat Stations Scheme at Dighwara, Sonpur (1st & 2nd entry), Hajipur (1st & 2nd entry), Shahpur Patoree, Bhagwanpur, Ramdayalu Nagar, Dalsingh sarai, and other stations under Sonpur Division.
ELASTIC RAIL CLIP(ERC) MK-V WITH FLAT TOE FOR 60KG UIC/52KG RAIL SECTIONS DRG: (RDSO) RDSO_T_5919_ Alt_2 SPEC: (RDSO) IRS/T-31-2025 Sixth Revision
4G VOLTE Fixed wireless phone. Make-Beetel, F3-4G or similar.
Overhauling Kit for Valve of Aux. Panel of CCB Brake System of M/s KBI. One set consisting of 15 Sub Kits as per Annexure attached.
Engineering procurement and Construction (EPC) of "Construction of New BG line work including earthwork, blanketing, minor bridges, major bridges, LHS/RUBs, ROBs, track works, platform work, station building, FOBs, other buildings, and associated miscellaneous works for 25T Indian Railway Standard Loading from Ch. 1.350 KM (excluding Jhajha) to 22.000 KM (including BATIA station) (Total- 20.650 route km, 27.888 track km) in connection with the Jhajha Batia New line Project"
Improvement of Indian Institute Stadium and Sports Ground and Development of Sports facility at Backley Club at DDU under ADEN/HQ/DDU.
Kit of spares for HP and LP disc valve assly dia 60mm and100 mm comprising of 8 items 16 nos., ELGI No 072490039 as per annexure
Dry Cell as per IRS S-96-5-96 with Amdt or Latest (RR cell).
Supply, testing, and commissioning of an industrial-grade Unmanned Aerial Vehicle ."As per attached Specification".
Manufacture & Supply of 60 Kg Special Fish Plate for Glued Insulated Rail Joint
Appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Services at various Project Sites/Sections in the work jurisdiction of Chief Signal & Telecomm Engineer/Works, East Central Railway, Hajipur.
Supply, installation and commissioning of Shock Absorber Testing Machine For LHB & Yaw Dampers as per attached technical specification.
Provision of CCTV Cameras at Non-Interlocked Manned LC Gates at different locations over DDU division.
TRACTION MOTOR TYPE IM 3302 WITH PINION AND TEMPERATURE SENSOR ONLY.
Vehicle Control Unit (VCU) Based on TCN Open standard as per CLW Spec. No: CLW/C-D and D/ES/3/TCN-VCU/0547, Alt-A, May-2016 and latest..
Jointless silver bearing grooved copper contact wire 107 sq mm
Provision of new station building connected with FOB for 2nd Entry of stations with road, Parking, boundary wall, Pathway, Porch, Drain, Horticulture, shifting of related utilities and other associated works at Gomoh, Parasnath, Hazaribagh Road, Koderma, Paharpur, Latehar, Daltonganj, Garhwa Road, Garhwa Town, Renukoot and Chopan Stations in Phase-II works alongwith work of 1st entry of Barkakana, Chopan & Daltonganj stations Under Gati Shaki Unit, Dhanbad division, East Central Railway.
POH KIT FOR DV-C3W- DV FTRTIPL Part No.-790501532 as per Annexure attached.
Blower Motor for roof mounted packaged AC unit of electric locomotives, Type: AOM, 0.12KW, supply 415V AC +/- 10%, 3-phase, 0.4 Amps, RPM 1350, Star connection, Reference IS: 325, Freq. 50Hz, as per RDSO Spec. No. RDSO/2007/EL/SPEC/0055, Rev.- 2 with latest if any. Make: LHP or Star Electric. Specification :- - RDSO Spec. No. RDSO/2007/EL/SPEC/ 0055, Rev.-2
Spares for O/H kit of Schunk pantograph consisting of 06 items. Make/Brand- Schunk Metal and Carbon (1) Shunt-Schunk part no 909010013700, drg No- 4- 12800.5848-04 Nos. (2) Shunt-Schunk part no 909010013600, Drg No- 4- S00.4999-08 Nos (3) Bellow (Best Nr. 1407 AW), Schunk part no 909010009200- 02 Nos. (4) Leaf spring complete, schunk part no 909010012200, drg no-3- W0812502-06 Nos (5) Horn 1800, Schunk part no 909010004400, drg No- SB029093, Alt-0,-04 Nos. (6) Shunt, Schunk part no 909010005600, Drg No- 4- S00-3579, -04 Nos
Hall effect active Speed Sensor for Traction motor of WAG9 & WAP7 (3 phase) loco with IGBT based Traction Converter. Consisting of hall effect active speed sensor and cable. Specification :- CLW/ES/3/0528 Alt. A
Conical Rubber Thrust pad for Axle Box assly of WAG7 Loco Specification :- RDSO drg.no.- SKDL-2308 Alt.01 with latest Alt. Specification No.- IRS R-63-76 with latest Alt.
Breaking excitation transformer ATFEX 60 KVA Specification :- CLW Specn.- CLW/ES/T-20/H
Arrangement of High Tensile Transition CB Coupler with uncoupling gear ,Specification:- RDSO Drg. No. SKDL -3430 Alt.8 (Except item no.-42)
Set of Circuit Breakers. One set consisting of 02 items, 03 nos. each Specn/ Drg. No.- a) AC Circuit Breaker 16A 690V 3 Pole as per CLW Specn No. CLW/ES/3/0096 Alt-L -03nos. Cat No. QX-3 16A AH8569, b) DC Circuit Breaker 16A 250V DC 1 Pole as per CLW Specn No. CLW/ES/3/0037 Alt-I -03nos Cat No. QX1 16A DH 8538
Emergency Exhaust valve for E-70 Brake System for WAP-7 & WAG-9(3 Phase locos) conforming to CLW Specn. No.-CLW/MS/3/001 Alt. 17 & Part No. 002007900 of M/s FTRTIPL or Modified 1-1/4" Emergency Exhaust valve for WAP- 7 & WAG-9 locos confirming to CLW Specn. No.-CLW/MS/3/001 Alt. 17 to KBI Part No. II 103933.
Rod cutter cordless 18-Volt 6 Ah, 2 Nos battery and one charger with 05 Nos rod cutter .:Attached as per Technical Specification".
Survey/Route Plan/Design/Drawings of 132 KV EHT lines from Grid Sub Station to Traction Substations, Survey/Design/ Drawing of EHT line crossings infringing proposed Railway Track & associated OHE works, Wiring diagram, General Power Supply diagram, Sectioning Diagram and Pegging Plans related to OHE work, TSS/SP/SSP location plans surveys and OHE/PSI Design & Drawing of section for New Line/ Doubling projects ( NKE-RXL-SMI & MFP-SMI, Mansi- Khagaria,Goldenganj-Katihar etc.) over SPJ Division under jurisdiction of Dy.CEE/CON/N/SPJ
Supply, Installation and commissioning of Mobile Surface Printer with UV Technology.
Rate contract for carrying out Final Location Survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of DPR (including Electrical, Signal, operating/ traffic works and preparation of EPC Bid package) in connection with survey for New line, Bye-pass line, Doubling/multitracking, flyover etc. in E.C.Railway including Providing facilitation to Competent Authority for Land Acquisition (CALA) for land acquisition work to the Railway Projects in jurisdiction of CAO/Con/North/MHX covering SEE & SPJ divisions of ECR
Providing Project General Management Services (PGMS) for Different Projects in Construction Organization under CAO/Construction/North unit of East Central Railway.
AOH Kit for Rotex Magnet valve model no. 3486 for single bottle Schneider make VCB. Schneider code no. MFR14532.
Supply of Contactor for main compressor and BUR 1, 2 for HB panel WAG-9 locos.CLW drg. no. CLW/ES/3/0095/C , ABB Indent No. HBTB585683 R2927, Type-LP1-D801FW-80/125A-750V-3P-110VDC.
Isolating cocks and drain cocks as per Annexure-A used in 3 Phase locomotives. 01 set consists 3 items.
Engineering procurement and Construction (EPC) for "Construction of New line work between including earth work, blanketing, minor bridges, major bridges, ROBs, LHS/RUBs, track works, platform work, station building, FOBs, other buildings and associated miscellaneous Civil engineering works for 25T Indian Railway Standard Loading from Bikramshila (incl) to Katareah (incl) from ch. 0.50 KM to 24.274 KM with Shivnarayanpur to Shivnarayanpur Y-Link from ch. KM 1.10 to 2.933 KM and Katareah Y-Link to Naugachia from ch. KM 21.533 to KM 29.22 (Total :33.294 KM, civil engineering & P. way work including P. way work on important bridge from ch. KM 8.804 to KM 12.894. Total=4.09 KM) in connection with Bikramshila-Katareah New line Rail link Project.
Spare parts of Siemens required for HHP diesel locomotives