Loading…
Loading…
2,489 results • Latest
Improvement of Goppili on PWD (SH-4) to Kinchilingi road from 0/000 km to 7/421 km in the district of Gajapati under State Plan
Provision for Comprehensive annual maintenace of Fire fighting and alarm system for SDH Building Patnagarh in the District of Balangir
Utility Shifting of HT/LT line and Sub-Station for the work Widening and Strengthening of Patnagarh - Khaprakhol - Harishankar Road from 0/000 Km. to 28/900 Km.under CRIF Scheme (Jogimunda and Khaprakhol Town portion)
Supply, Installation, Testing and Commissioning of Fire Fighting System for CHC Khaprakhol in the District of Balangir
Supply, Installation, Testing and Commissioning of Fire Fighting System for CHC Kholan in the District of Balangir
Supply, Installation, Testing and Commissioning of Fire Fighting System for CHC Tureikela in the District of Balangir
Supply, Installation, Testing and Commissioning of Fire Fighting System for CHC Ghasian in the District of Balangir
Provision of fire down comer system Booster pump, fire detection and PA system, fire extinguisher and Signages at CHC Building at Gambharimunda Buildings.
Provision for Comprehensive annual maintenace of Fire fighting and alarm system for MCH Building Kantabanji in the District of Balangir
Provision of 250 KVA, 11/0.4 KV Substation for the External Electrification work for Upgradation of CHC Sindhekela Building in the District of Balangir
Utility Shifting work for Improvement such as widening and strengthing of Saintala - Titilagarh Road 0/000 km to 30/915 km (except from 3/400 km to 5/700 km) from Womens College to Madan Jal Chowk, Titilagarh
Construction of Patient Attendant Rest Shed at PHC Bangomunda under Bangomunda Block under State Plan for the year 2024-25
Construction of Boundary Wall and Approach Road with Gate at new CHC Building at Muribahal under State Plan for the year 2024-25
Repair of E type Quarter (PH plus EI) 2 Nos. at CHC Turekela under Turekela Block under State Plan for the year 2024-25
Improvement such as widening and strengthening of road from Solpata Chhanua G.P. to Bahabalpur fishing Jetty in Bahabalpur G.P. from 0/000 km to 10/400 km in the district of Balasore under State Plan
P/R with SDBC to Balibhaunri Sikharghat road from Ch.2/000 km to 3/500 km in the Jagatsinghpur District For the year 2025-26.
Repair of D type Quarter (PH plus EI) 2 Nos. at CHC Turekela under Turekela Block under State Plan for the year 2024-25
Construction of Boundary Wall and Approach Road at PHC Bangomunda under Bangomunda Block under State Plan for the year 2024-25
Annual repair of Govt.Polytechnic Berhampur staff quarter 1 to 8 such as providing plastic felt treatment ,plastering,inside and outside painting etc
Repair of F type Quarter (PH plus EI) 2 Nos. at CHC Turekela under Turekela Block under State Plan for the year 2024-25
Repair and Renovation of EI and PH work at CHC Turekela under Turekela Block under State Plan for the year 2024-25
Construction of Section Office at Bangomunda in the district of Balangir
Construction of RCC Drain at Khandapada Town road from 1/790km to 2/065km for the year 2026 27
Improvement such as widening and strengthening of Ambasar Chhak (Haripur College Chhaka) to Dhenkanal Border road from 0/000 km to 6/709 km in the district of Jajpur under State Plan
Improvement of Rampur-Girischandrapur road from 1/408 km to 26/538 km ( except from 17/020 km to 17/620 km) in the district of Sambalpur under State Plan
Supply and Installation of Electrical life safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings
Supply and Installation of Electrical life safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings O
Supply and Installation of Electrical life safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings M
Supply and Installation of Electrical safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings PMR,
Comprehensive Annual Maintenance for the installed Air Condition at District Judge Bungalow and the Residential Quarters at Berhampur and Digapahandi in the District of Ganjam for the year 2026 27
Supply and Installation of aerosol based fire extinguisher at Newly Constructed 300 bedded DHH, Boudh.
Supply and Installation of Electrical life safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings
Supply and Installation of Electrical life safety equipment such as SITC of Electrical protection system, SPD and earthing protection system to all Panel board and RCCB and RCBO to all DB Box and upgradation of cable laying of different buildings R
Comprehensive Electrical Maintenance for the installed Air Condition Under CJM Court, CJJD Court, Record Room, Server Room Digitization center, CSI Office, DLSA Office, and Chamber, Store Room, Process Establishment section, PP chamber, Vedio Confe
Improvement such as widening and strengthening of road from NH-53 to Deojharan via Surungipal from 0/000 km to 4/804 km in the district of Deogarh under State Plan
Improvement such as widening and strengthening of Budhapal to Jarhachat road from 0/000 km to 9/240 km in the district of Deogarh under State Plan