Loading…
Loading…
4,841 results • Latest
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 kV substation greater Noida; Substation, 20 MVA Transformer oil leakage; Service Provider
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
FEED ROLL SHAFT of RC Feeder, RCF Chain, Clutch assembly for R C Feeder, SS Grooved angle of 5 mm L 720mm, Complete Set of Sprocket Wheel, Sprocket Wheel small, Cover for Sprocket bearing, Gun Metal Seal Spindle Assy RCF, Brash Bush for R.C. Feeder, Brass Guide Bar for Hot Air gate
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Electricity 220 KV Sub- Station; Switchyard, Power House Equipment, 33 KV VCBs and Other Associated Works; Service Provider
Facility Management Services - LumpSum Based - As Per Enquiry; As Per Enquiry; Consumables to be provided by service provider (inclusive in contract cost)
Monthly Basis Cab & Taxi Hiring Services - SUV; 3500 Km x 364 hours; Local
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local 24*7
Air filter regulator range 0-2 kg/cm2 with pressure gauge 0- 2.5 kg/cm2 Make SHAVO (As per Sample provided by user Division), Air filter regulator range 0-7 kg/cm2 with pressure gauge 0-10 kg/cm2 Make SHAVO (As per Sample provided by user Division), COPPER LUG PIN TYPE 1.5 MM2, insulated (As per Sample provided by user Division), FLEXIBLE (RUBBER) HOSE PIPE. ID=14 MM. OD= 20 MM (As per Sample provided by user Division), Seal kit for ID fan actuator (As per Sample provided by user Division)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing of 10/16 KVA to 400 KVA Damaged Distribution Transformer at Workshop Etah Under EWD, Agra; Damaged Distribution Transformer; As Per ATC Document and BOQ
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair, Maintenance and Installation of Plant/Systems/Equipments (Version 2) - Various work at 132 kv S/S Mirzapur and 132 kv Jigna S/S under ETD-Mirzapur; Repair, Maint..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY
No SIPART PS2 HART Positioner With Power And Feedback Card, MAKE: SIEMENS, PART No. : 6DR5123-ONN01-0AA4 ( 6 Unit ), SIPART PS2 HART Positioner With Power And Feedback Card, MAKE: SIEMENS, PART No. : 6DR5123-ONG00-0AA0 ( 2 Unit ), POSITIONER-SIPART PS2 HART POSITIONER With Power And Feedback Card TYPE: 6DR5123-0NN00-0AA0 SW. REV. : ( 4 Unit ), POSITIONER- SIPART PS2 HART POSITIONER TYPE: 6DR5123-0NN00-0AA0 SW. REV. : 5.01. 00 SL. NO. : N1K5287489 ( 4 Unit )
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY
Customized AMC/CMC for Pre-owned Products - For AMC of Machinery at various workshop under EWD, Agra; As Per Available Workshop Site; Annual Maintenance Contract (AMC); As Per Workshop Site Complaint; Yes
Customized AMC/CMC for Pre-owned Products - For AMC of Machinery at various Workshop under EWD, Kanpur; As Per Available Workshop Site; Annual Maintenance Contract (AMC); As Per Complaint of Workshop; Yes
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI-TURNKEY
Siemens make Electrical items
Supply of Veedol make Lubricants
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
EMERSON MAKE TRANSMITTERS
Horticulture Service - Maintenance Based Model - Service inclusive of Consumables; General Maintenance of Garden/Lawn/Field/Nursery/Park
Facility Management Services - LumpSum Based - substation and line; O&M of Electrical Work; Consumables to be provided by service provider (inclusive in contract cost)
Household Refrigerating Appliancesasper IS17550 (Q2)
FILTER ELEMENT, Suction filter for LOP of FD, Filter Element 2.56G60P, Duplex Filter Assembly, Duplex Filter Assembly for Lube Oil of ID Fan
Custom Bid for Services - Overhauling of 0.4 KV LT Motors of Unit#02 of 3x210 MW ATPS, Anpara. Similar Category MULTI-PROTOCOL LABEL SWITCHING SERVICE(MPLS SERVICE)
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Maruti Suzuki Vitara Brezza, Maruti Suzuki Ertiga, Hyundai Creta, Mahindra Scorpio, Mahindra XUV300; 2023 2024 2025; 75, 000-1, 00, 000 kms; A/C; 24x7, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra TUV300, Mahindra Bolero; 2023 2024 2025; 75, 000- 1
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Unified tender for Preventive and Break Down Maintenance job of different 400 220 132 KV Transmission lines under Electricity Transmission Circle-II Prayagraj; Transmiss..
Tree plantation Campaign Year 2026-27 at various Sub- Stations under Sultanpur District
Custom Bid for Services - ---- Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - ---- Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
RTD TYPE: Embedded bulb type SENSOR ELEMENT: PT-100 TEMPERATURE CO-EFFICIENT: 0.00385 ohm/ohm/° C SEN
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Overhauling of Electrical Circuit of EOT Crane and electrical fault rectification during overhauling of unit 10; Power House Equipment; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SERVICE
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal Power Plant; Round the Clock Routine & Preventive Maintenance of Turbine and Breakdown Maintenance of Turbine side auxiliaries and equipments such as BFPs, CEPs, ..
Operation And Maintenance Of Switchyard - As per enquiry
Repair Kit for FO Pump, S. N. -25011489, Model-T3ST 80/40
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 KV S/S GOKUL; Fabrication of 03 nos half cut drum suitable for plantation; Service Provider
Revolving Chair (V5) (Q2), Steel Almirah/Cabinets (V4) (Q2) ( ( 3 3 ))
Custom Bid for Services - 11 KV Line erection, strengthening works and augmentation of distribution transformers under business plan 2026-27 in the area of EDD-Laxminagar under EDC-II, Mathura on Semi-turnkey basis Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - Augmentation of distribution transformers under Business Plan 2026-27 in the area of EDD-Laxminagar under EDC-II, Mathura on Semi-turnkey basis Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Custom Bid for Services - Augmentation, installation of distribution transformers & different 11 KV Line (new/strengthening) works under business plan 2026-27 in the area of EDD-Mant under EDC-II, Mathura on Semi- turnkey basis Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
BFP MAIN PUMP SUCTION GASKET 14 INCH CL600, BOOSTER PUMP SUCTION GASKET 16 INCH CL 300, Spiral Wound Gasket DN 400mm Class, SPL W GKT 257.3X196.9X3.3 IR, GASKET SWG 70x56x3mm, GASKET SWG 80x62x3mm, HP OPERATNG VENT GASKET ID26 OD73 CL 600, TDBFP INLET STEAM FLANGE GASKET 12 INCH CL30
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; semi turnkey
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3)
Hopper Heater Plate of ESP fly ash hopper
Operation and Maintenance Power House/Power Plant - Complete System