Loading…
Loading…
8,186 results • Latest
Hiring of Air conditioned vehicles for the use of HRIDC officials at Gurugram office for a period of 02 (Two) years
70.26.27 Maintenance of all Horticulture Works along central verge and road
Maintenance of all Horticulture works in Parks Near Group Housing in Sector-45 Gurugram
78.26.27 Turfing of Lawn with Fine Grassing in Ashiana Scheme Society
32.26.27 Maintenance of Tree Plants and Shrub Plants at Park site in Po
Engagement of Network Bandwidth Service Provider for providing MPLS VPN at DC Hisar and DRC Panchkula SDO locations and other offices under jurisdiction of DHBVNL.
Providing Grid Connected Roof Top Solar Power Plant without Battery Bank in Sewage Treatment Plant at Bhiwani.
Providing Grid Connected Roof Top Solar Power Plant without Battery Bank in Sewage Treatment Plant and Water Work at Jind.
Operation of 2 Nos. tubewells No. 3 and 7 Sector-24 Panipat
Operation of 2 Nos. tubewells No. 5 and 8 Sector-25-II, Panipat
In estimate 100mm mixed soil removing and providing and laying of gravel, making of toe wall in 220/132/33 kv switch yard.
Daily cleaning, sweeping with the New Grain/Fruit and Vegetable Market Sohna. All the toilets cleaning sewerage line and others cleaned daily dump the garbage/mud and dust daily outside the city/prescribed area by MCS by his own tractor trolley and p
Temporary protection of TL No. 13-14 of 220kV D/C Naggal-Pinjore line and TL No. 69-70 Gantries of 66kV D/C Raiwali -HSIIDC-Taprian line near the bank of Tangri River (Village Khatauli) under TS Division Madanpur Panchkula
hew 82 Construction of footpath and Toe wall adjoining with Group Housing societies in HSVP Sec-2 Palwal and all other works contingent thereto including 3 years defect liability period free of cost.
Annual Running Contract for Operation and Mtc. of complete Zero Discharge System at 2x600 MW, RGTPP, Khedar, Hisar
Clearing jungle/uprooting of rank vegetation inside and outer boundary of green belt/park for plantation of Miya Vak by M/s Aisin Authomotive near HL city, Sector 30B, HSIIDC, Phase-II, IMT Rohtak
Composite Contract in connection with railway Line of HORC project between stations Prithla and Dhulawat for Design and Construction of Earthwork, Bridges, Stations Retaining Walls and Electrical Services from km -2.296 to km 12 and km 18 to km 20.8
Mundhal Khurd
Construction of Boundary Wall and allied Civil Works at 33 KV Sub Station DHBVN Danoda (Jind).
Manufacturing and Supply of Cement Tree Guard complete in all respects
Manufacturing and Supply of Iron Tree Guard complete in all respects
Civil works to prevent the 33 kV S/Stn. Shekhupur Sottar (Fatehabad) from flood water due to located in low lying and flood prone area. It also included the cost of Earth filling and other allied civil works.
Civil works to prevent the 33 kV S/Stn. Shakarpura (Fatehabad) from flood water
Construction of XEN OP Office Building Dabwali (Sirsa).
Construction of 10626 MT capacity godowns, CC roads, including E.I. work etc. at sugarfed land Palwal.
Raising and Re-construction of godowns,roads,sump, boundary wall,weighbridge and cabin including E.I work along with dismantling of old reduntant structure exists in campus at SWH Rewari-I (District Rewari)
Reconstruction of the campus of SWH Jind (Old campus).
DNIT FOR RENOVATION OF THE SIRSA CENTRAL COOP. BANK LTD, BRANCH OFFICE AT RANIA,TEHSIL RANIA IN District SIRSA
A/mtc of L/s work in Sector-28, Panchkula for the year 2026-27.(Supply and filling of earth and clearing jungle etc. and all other work contingent thereto.)
A/Mtc of L/s work in Sector-8 and 9 Karnal for the year 2026-2027(Pruning and triming of plants, Hiring of Hydra etc and all other work contingent thereto)
A/mtc of L/s work in Sector-6, MDC, Panchkula for the year 2026-27.(Repair of children playing equipments and GYM equipment etc. and all other work contingent thereto.)
A/mtc of L/s work in U.E. Panchkula for the year 2026-27.(Repair of children playing equipments and GYM equipments etc. and all other work contingent thereto.)
AMtc of EPHS in Sector 13 UE Kurukshetra Providing and fixing of Non Return Valve and repair of 25HP Submersible motor pump submersible cable and gravel complete in all respect and all other works Contingent
A/mtc of L/s work in Sector-5-B, MDC, Panchkula for the year 2026-27.( Supply and planting of rare specimen plants and providing and fixing of barbed wire fencing on RCC poles etc.and all other work contingent thereto with three year mtc and defect l
AMtc of EPHS in Sector 3 and 30 UE Kurukshetra Repair of 2HP Sewerage Motor pump MS Pipe MCCB at various tubewell complete all respect and all other works contingent thereto
AMtc of EPHS in Sector 5 Urban Estate Kurukshetra Repair of water supply line CID joints sluice valve champ rubber sheet and special in water supply system etc complete in all respect
A Mtc of EPHS in Sector 13 Urban Estate Kurukshetra Repair and rising of sewer manhole and cleaning of sewer line and sewer manhole complete in all respect
A Mtc of EPHS in Sector 30 UE Kurukshetra Repair of water supply line CID joints sluice valve champ rubber sheet and special in water supply system etc complete in all respect
A Mtc of EPHS in Sector 5 UE Kurukshetra Cleaning desilting of sewer pipe line various size complete in all respect and all other works contingent thereto
A Mtc of EPHS in Sec 13 Kurukshetra Providing and Laying of DI Pipe 100mm dia DI specials and CID Joints hiring of JCB for repair of water supply and Leakage complete in all respect and all other works contingent thereto
Annual repair of M.C.Properties and FSG of M.C.Jundla for the year 2026-27
A Mtc of EPHS in Sector 2 UE Kurukshetra Hiring of Septic Tank capacity 5000 Ltr Including fuel diesel and driver and tractor trolley for shifting of malba complete in all respect and all other works contingent thereto
AMtc of EPHS in Sector 13 UE Kurukshetra Engaging of sewage suction tanker 5000 Ltr capacity with tractor and driver with fuel and cleaning of sewer line complete in all respect and all other works contingent thereto
AMte of EPHS in Sector 7 Urban Estate Kurukshetra Repair of Water supply line and leakage Providing and fixing of DI pipe specials CID Joints various sizes complete in all respect and all other works contingent thereto
Reconstruction and raising of Godowns and campus at SWH Uchana.
Estimate for construction of 4466 MT capacity godown on open plinth at SWH Mahendergarh
Reconstruction and raising of Godowns and campus at SWH Safidon.
Welding Electrodes
Repair and configuration of BCU of 220/132kV, 100 MVA T/F T-1, configuration of BCU of 33kV bus coupler, REF relays of 220/132kV, 100 MVA T/F T-1 and 220/33kV, 100 MVA T/F T-2 at 220KV Substation Chormar- Work for SAS integration.
Estimate for Construction 17556 MT capacity godowns on open plinths at ICD Rewari.