Loading…
Loading…
1,374 results • Latest
Khoi Khul-Construction of lining wall on main canal of Tangmarg at Peth Treran Ferozpora B
Nehalpora Khul Darveshbagh minor Construction of Retaining wall, concrete channel and bed treatment at RD 500-RD 536m
Chukar Khul, Dundara branch- Construction of Steel Flume Extension (12m) and retaining abut walls and Bed Treatment for leakage prevention D/S Dindoora Flume RD 2133 m
Lolpora Khul Pick Up II (Bradnim Khul)- Toe Protection by way of crate work and pitching from RD 300 m-RD 373 m
FP work on Frashar Nallah at Kakawthal.
Ferozpora Nallah Kunzer Branch- Re-sectioning and crate protection works at Khore sherabad from RD 19155-19200m
Shoonsh Khul Construction of Lining wall Bed Treatment and crate work from RD 2500 2550,6500 6550,7500 7550,9000 9050 (L 200MTRS).
Ferozpora Nallah- Construction of Protection work by way of Gabion work including RCC bunds on LS DS Chanapora Bridge
Yal Khul-Construction of RCC lined channel from RD 0 to RD 600 m
Earth filling and fencing of graveyard near Abdullah Bridge ZeroBridge
Restoration of Irrigation Supply channel at Kharpeth ladi to GDC.
Construction of Retaining Wall Lining wall on both sides of Narupora ladi at spots.
Construction of Head works for Narupora Ladhi at Kokernag Anantnag.
Construction of breast wall on Sogam Khul near stone crusher at Bedibera.
Replacement of 02. No. winch machines and other allied works for control gate at head site of Dehgam Khul at Saiwan.
Construction of Crossing across Lastiyal Khul at RD 4400.
Construction of Toe protection crates and laying of DI pipe on Lastiyal Khul at Madmadow Kalaroose.
Seer Canal Construction of Lining Wall and Bed treatment from RD 4000 4200 and RD 9000 9200 MTRS (L 400MTRS)
Sisri Nallah-Flood protection works on Sisri nallah and its tributries from RD 200 s00MTRS at Village wahdina, Narpati near Masjid Shareef, and Kachwa muqam(Approx. Length 280 m)
C/O one Number Ghat at Pohru Nallah at Mazbugh.
Adipora Khul-Construction of Cement concrete lining wall canal (Adipora Minor) at Adipora
Connecting of Irrigation Channel B.W.O Laying of RCC Spun pipes at Village Goshbugh LIS Goshbugh (Orchard)
Botingoo Nallah Flood Protection work on Botingoo Nallah at RD 2100M (Approx length 180 m).
Pohru Nallah Flood protection work on left side of Pohru Nallah at RD 11000M Approx. Lenth 60m
Freshtar Nallah-Flood protection works on Fresthar Nallah at spots at nambalnar at RD 430m (Approx lenth-90mtrs)
C/O lining wall on gham Khul at Seelo
Improvements of Shoonsh Khul at Vulnerable Spots
Checking of Leakage B.W.O Cement Concrete Bed-treatment on Shirbugh canal
C/O Gate wall with Lining wall on check khul near H/O Farooq ahmad dar C/O Lining Wall near H/o Bashir ahmad Malla to Onwards at ganie Mohalla Darnambal
Construction of Toe Wall near the land of sh. Balvir singh and others in Naian Wali Khul
Construction of Flood Gate at Tangroli on Local Nallah
Construction of crate revetment/ earthen embankment for protection of army defence posts/ structure from manwar Tawi near manjeet post 2(Crate revetment with earthen bund on tipping section)
Construction of headworks and control gates for Brandogger Khul at Trehgam.
Refer to BOQ
Refer to BOQ
Refer to BOQ
Refer to BOQ
Renovation of Divisional Office Building of Flood Control Division Satwari Jammu
Repairs to 250 KVA electrical transformer with allied works at LIS Thandapani.
Repair to 200HP motor FASD starter (Fully automatic star delta starter) of pumping unit no. 02 at LIS Ambaran.
C/O Flood Protection Bund by way of crates at Tulkul Aard at Bon Checherpora
C/O Flood Channel NLO Gulla Khan,Hamid Khan,Mohidin Khan on Nallah Aripat Pnchayat Halqa Khanpora(Upper side Aripat Bridge) and C/O Protection work on Aripath Nallah NLO Gh Mohidin Khan and others at chan Patt Uttersoo.
Constrution of FP work on left side of Lamdi Nallah at Chowgam near Service reservoir
Construction of Anti- erosion cum flood protection work on left side of veshow Nallah at village Brazloo U S Bridge.
Construction of Anti- erosion cum flood protection work on left side of veshow Nallah at village chellan near bridge at spots
Construction of Flood Protection work on Right side of veshow Nallah by way of toe crates and spurs upstream Gund village
Construction of Anti Erosion cum Flood protection work on Sonman Nallah at village Hum near Eid Gah.