Loading…
Loading…
4,367 results • Latest
Emergent barricading of 2 Nos additional Ghats located at right bank of River Hooghly under Ward No. 12 for ensuing of Shrabani Mela 2026 under Baidyabati Municipality, P.S. Serampore in District- Hooghly
Assessment of present river cross sectional profile with bank topography survey of Cut Kunti Khal (IWD) in Singur Block ,Baidyabati Muncipality area of District Hooghly under Lower Damodar Irrigation Division-II
Reconstruction of Four Vented Kismatnarajole Sluice over Ex Zamindary Embankmet along Right Bank of river Shilabati at Mouza Kismat narajole, G.P Ninarajole, Block Daspur-I, P.S- Daspur and DIST.Paschim Medinipur in connection with Ghatal Master
Reconstruction of Moshalchak Seven Vented Sluice across Mohankhali Circuit Embankment over Solatopa Khal along Left embankment of river Durbachati at Mouza Moshalchak in block DaspurII, P.S-Daspur and Dist West Midnapore in connection with Ghatal
Construction of Harighata Six Vented Cross Regulator at Chainpat-Baruna over Ex Zamindari Embankment of Chandreswar Khal at Mouza Udaychak in BlockDaspur-II, P.S. Daspur and District Paschim Medinipur in connection with Ghatal Master Plan
Soil test with detailed report
Civil maintenance woek
Periodical maintenance, repair and upkeepment of Calcutta Canals Sub- Division office and Office premises, 37/3, Canal West Road, Kolkata- 700004 for a period from 365 days under Calcutta Canals Sub-Division of Canals Division
One time water hyacinth clearance in between Ch. 30 to 435 of Cut-2 drainage channel under EE-II , lower Damodar Irrigation Division in P.S and Block Pandua and Balagarh Dist. Hooghly during 2026-27.
Clearing and removing of water hyacinth at up stream an downstream of different structures and bridges on river North Saraswati in between Simlapul Bridge and Debanandapur bridge during within Block- Chinsurah Mogra and Polba Dadpur of Chinsur
One time water hyacinth clearance in river Kunti in between Rajhat to Chatimtala under Block Polba dadpur, Dist Hooghly.
OTM for River Julkia in between Payraura Bridge and Joymollah Bridge(for a length of 2000m) within Block-Singur and Haripal in Dist-Hooghly.
OTM of water hyacinth in between Mathurkur Bridge and Reopara Foot Bridge(for a length of 1700m) over River Ghea within Block-Haripal and Polba-Dadpur in Dist-Hooghly.
Repair and Maintenance of 2 nos. Flap shutter and 2 nos. draw shutter including their hoisting arrangement of Deshduttabar Sluice in Block Contai-I under P.S Junput in the district of Purba Medinipur.
Clearing and removing of water hyacinth for river Soa in between Balgore Bridge to Rajhat Gayatri Ashram in Block Polba dadpur PS Dadpur District Hooghly.
One time clearing and removing water hyacinth from River Ghea in between Bilatpur bridge and Borohana Ashram (for a length of 3000.00 M) within Block Polba Dadpur and Singur Dist Hooghly of Lower Damodar Irrigation Division.
AMC (year 2026-27) of Dankuni Khal from 6560.00 m (Delhi Road Bridge) to Ch.7800.00 m (U/s of Bridge near Dankuni PS) within Dankuni Municipality, Dist. Hooghly
AMC (year 2026-27) of Dankuni Khal from 4170.00 m (Gandhi Setu) to Ch.5610.00 m (Bonder Bill Sluice) within Dankuni Municipality, Dist. Hooghly
AMC (year 2026-27) of Baidyabati Khal from 5940.00 m (Baidyabati Sluice) to Ch.4890.00 m (Delhi Road Bridge) within Baidyabati Municipality, Dist. Hooghly
AMC (year 2026-27) of North Saraswati River from Ch.20250.0 m (D/S of Chandannagar Flyover) to Ch.19530.0 m (D/s of Anantapur Bridge) within Chandannagar Municipal Corporation, Dist. Hooghly
AMC (year 2026-27) of North Saraswati River from Ch.23040.0 m (D/S of Noapara Bridge) to Ch.22050.0 m (U/s of Jarura Bridge) within Chandannagar Municipal Corporation, Dist. Hooghly
M/R to Protection work at Dakhin chitnan for a length of 60 Mtr. in Mouza chitnan river Rupnarayan in G.P- G.B Chitnan, Block Amta-II, Dist. Howrah.
One Time Clearance of Upstream of Ganapath khal in between Jalchak to Bar Bhemua Wooden Bridgefor2.50Km,Tributary of Ganapath khal from Nilotbridge to Bhemua wooden bridge for l.50km in Mouza-Barbhumea,Khorai G.P-10 no Bhemua,Sabang PMedinipur.
One Time Clearance of Upstream of Banskona khal in between Ch- 0.00 Km and 6.0 Km for length of 4.300Km in Mouza-Kishorepur janhat ,Lechua G.P-10 no Bhemua Block-Sabang Distt-Paschim Medinipur during 2026-27, under K.K.B Project Division.
One Ttme Clearance of Mirzapur khal in between Ch-0.00 Km and 2.5Km for length of 2.30 Km in Mouza -Barda,Sibchak, Sitalda and Murarichak G.P-11 No Mohar,l3 No Bishnupur Block-Sabang, District-Paschim Medinipur during year 2026-27, under KKBP Divisin
One Time Clearance of Bagmari khal in between Ch-0.00 Km and 1.5 Km for a total length of 1.40 Km in MouzaBahabalpur G.P- 12 No Bural, Block- Sabang, DistrictPaschim Medinipur during the year 2026-27, under K.K.B Project Division.
Emergent barricading of 6 Nos Ghats located at right bank of River Hooghly under Ward No. 5 and 6 for ensuing of Shrabani Mela 2026 under Baidyabati Municipality, P.S. Serampore in District- Hooghly
Emergent barricading of 7 Nos Ghats located at right bank of River Hooghly under Ward No. 12 and 16 for ensuing of Shrabani Mela 2026 under Baidyabati Municipality, P.S. Serampore in District- Hooghly
Construction of wooden Bridge of 2.15 m carriage way at Kundra kapasda over Kalchity khal At mouza- Kundra Kapasda, Block ps -Sabang, Dist -Paschim Medinipur.
Urgent Re-construction of wooden bridge at Kundra-Bural (Bhattapara) over Kalchity Khal at mouza-Kundra Bural GP- 7 No. Narayanbarh 12 No. Bural Block P.S.- Sabang Dist-Paschim Medinipur.
Survey work of Jagaddal river from Ch. 13.30 KM to 14.60 KM at mouza- Dakshin Surendraganj for computation of river depth characteristic by taking cross secrion at required interval and velocity measurement by using Acoustic Doppler Current Profile
MR to right embankment of river Darakeswar at Udayrajpurpur Near RLI Centre and at bali near Kalitala within GP -Bali, Block -Goghat -I and P.S-Goghat, Dist-Hooghly under Arambagh (I) Sub Division of Lower Damodar (I) Division.
Restoration of damage sluice gates at Kamarsal, Daskhina hana and Fultala at G.P Thakuranichak, Block- Khanakul-I, P.S - Khanakul , Dist Hooghly
Supply (on hire charge basis), installation, operation, look after during monsoon period of 02 nos, 20 HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/ drainage water at Kolkat
Repair of embankment inbetween Ch. 75.00 near Road Bridge and Ch. 108.00 near Cross Regulator over Left bank of DBMC of Borobataspur (I) Section of Mouza- Kabindnagar, GP- Digalgram, Block and PS-Md. Bazar and Dist.-Birbhum under M.N.C. Division dur
Supply (on hire charge basis), installation, operation , look after during monsoon period of 01 no, 26HP diesel operated surface dewatering pump including the supply of POL with the incidental charges for pumping the storm/ drainage water at outfall
Strengthening of Left embankment of river Brahmani from 25750 m to 26500 m at GP Shitalgram in Block Nalhati-II, Dist- Birbhum of Nalhati (I) Sub Division under Mayurakshi North Canals Division during 2026-27.(2nd Call)
Maintenance and Repair Rampurhat Irrigation Campus Premises including Service Road within Rampurhat Irrigation Colony Premises during 2026-27 in Block-Rampurhat-I, P.S.Rampurhat, Dist-Birbhum under M.N.C. Division .
M/R to canal and canal banks in between chainage from Ch. 952.00 to Ch. 963.00 of D.B.M.C under Chilla(I) Section of Rampurhat (I) Sub-Division within M.N.C.D during the year 2026-27
Prevention of leakage of 4 nos Aqueduct at Ch.728.00, Ch. 779.00, Ch. 955.00, Ch. 1007.00 of DBMC under Rampurhat (I) Sub-Division, Block- Rampurhat-I, P.S.-Rampurhat, Dist.- Birbhum of Mayurakshi North Canals Division.
Clearing and removing floating water hyacinth and vegetative growth including floating debris of Hotor Khal in between Ch. 0.00 to 161.00 in Block - Mograhat-II, Baruipur, PS - Mograhat, Baruipur, Dist - South 24 Parganas for the year 2026-27.
Supply (on hire charge basis), installation, operation, look after during monsoon period of 01 no., 26HP diesel pump including the supply of POL , 01 no. 25 HP Motor operated surface dewatering pump with the incidental charges for pumping the storm/
M/R of damaged fall structure at Ch. 97.00 of Dy-6/DBMC at Mouza- Kusumba, GP-Kusumba, Block-Rampurhat-I during the year 2026-27
Clearing and removing floating water hyacinth and vegetative growth including floating debris of Mandirbazar Khal in between Ch. 0.00 to Ch. 250.00 in Block - Mograhat-II, P.S - Mograhat, Dist - South 24 Parganas.
Providing manpower for repairing and running maintenance of all sorts of electrical components at Kharda oufall, B.T. Road , Fatesha outfall, Dist-North 24 PGS during the year 2026-27
Providing manpower for repairing and running maintenance of all sorts of Electrical components at Bongaon Sluice -2, Bongaon Sluice -3, Bongaon Sluice - 4, Dist-North 24 PGS during the year 2026-27.
Clearing and removing floating water hyacinth and vegetative growth including floating debris of Kata Khal from Ch. 0.00 to Ch. 290.00 for a length of 8.70 km in Block - Mograhat-II, P.S - Mograhat, Dist - South 24 Parganas.
Clearing and removing water hyacinth and vegetative growth including floating debris of Barasat Kata Khal in between Ch. 0 to Ch. 190 in Block - Joynagar-I, P.S - Joynagar, Dist - South 24 Parganas.
M/R to both banks of Ghaga W.C from Ch. 0.00 to Ch.98.00 G.P- Gonpur, Md.Bazar Block under Head Quarter (I) Section of Mollarpur (I) Sub-Division under M.N.C. Division during -2026-2027.
Collection of River Gauge data and its transmission thereof to the control room from 1st July 2026 to 31st October 2026 under North Dinajpur Irrigation Division