Loading…
Loading…
4,367 results • Latest
Replacement of 6 nos Flap shutter, improvement of Draw Shutter, guide path, bottom seal, hoisting arrangement and painting, Cross bandth at Dewantala Log Gate
Replacement of 6 nos Flap shutter , improvement of Draw Shutter, guide path, bottom seal, hoisting arrangement and painting, Cross bandth at Kharuberia Log Gate
Replacement of 8 nos Draw Flap Shutter including renovation of guide path, bottom seal, painting, hoisting arrangement and Cross bandth at Jalalabad Log Gate
Construction of wooden bridge over Midnapore Main Canal at Ch 2910 m at Mouza Chakharo under Block and PS Debra District Paschim Medinipur
Emergent Protection to the Damaged area of Chonabhati Tea Garden Bich Line G.P. Chamurchi along both bank of River Hatinala for a length of 105 m under Block and PS-Banarhat , Dist. Jalpaiguri
Clearing and Removing Water hyacinth from 0.00 Km to 5.50 Km of Sarala Khal for the period of 365 days under Kulti Section of Calcutta Canals Sub-Division under Canals Division during the year 2024-2025
Protection work along the Left Bank of river Sil Torsha and Right bank of Kulti Jhora for a length of 1130 M. at Rava Basti area of vill - Kodalbasti, G.P. - Mendabari within Block- Kalchini, Dist- Alipurduar.
I.P.M. to canal bank in between Ch. 0.00 and Ch. 120.00 of DY 3 of R.B.M.C. Under of K.C Division No.-II
Maintenance and Repairing of Canal Slope Lining including strengthening of embankment In between Ch. 12.00 and Ch. 16.00 of Dy-1 of IMC under Silabati Section under SDS maintenance of K.C.Sub-division No-V under K.C Division No- II Khatra.
Maintenance and Repairing of Canal Slope Lining In between Ch. 17.00 to Ch. 20.00 including strengthening of embankment In between Ch. 13.00 to Ch.16.00 and Ch. 18.00 to Ch. 20.00 of Dy-2 of IMC under Silabati Section under SDS maintenance
IPM to canal bank by country side clearing at different filling zone of R.B.M.C. and L.B.F.C. for Rabi Irrigation 2026 under K.C. Division No. II. Khatra Bankura.
Annual Maintenance to inside outside wall including painting of Annex Building under K. L. B. Sub Division No.- II of K. C. Division No. - II. during the year 2025-26
Repairing of Boundary Wall under K.C.S.D-VIII Raipur in the Block P.S.- Raipur Dist.- Bankura under K.C. Division No. -II Khatra
Repairing of Old Office Building under K.C.S.D-VIII Raipur in the Block P.S.- Raipur Dist.- Bankura under K.C. Division No.-II Khatra
Repairing of Type-E Quarter under K.C.S.D-VIII Raipur in the Block and P.S.- Raipur Dist.- Bankura under K.C. Division No. -II Khatra
Construction of Cement Concrete road at the Kangsabati Canals Sub Division No. VIII Office Cum Colony Campus Raipur Under K. C. Division No. II Khatra Bankura during the F.Y.-2024-25
Construction of boundary wall and Gate for Kangsabati Canals Division No-II office compound under K.C. Sub-Division No-V of Kangsabati Canals Division No-II Khatra, Bankura during the F.Y -2025-26
Soil investigation for construction of a new bridge over Dev Khal at Vill -Deno, G.P. Baraboinan, Block - Raina - II Dist- Purba Bardhaman (2nd Call).
MR to North side drain for a length of 132 m at Kangsabati permanent colony under K.C. Sub-Division No-V of Kangsabati Canals Division No-II Khatra Bankura during the F.Y -2025-26.
M/R to clearing and removing weeds and water hyacinth in between Radhamohanpur to Hadal Narayanpur of Bodai River in Block and P.S- Sonamukhi and Patrasayer, Dist-Bankura of Amarkanan Irrigation Sub-Division under Damodar Canal Division during the ye
Maintenance and Repairing Works of Assistant Canal Revenue Office building situated at Kangasabati Tempurary Colony Khatra Bankura during F.Y.2025-26
M/R to Canal of DY- 4C Canal in between Ch 5.00 and Ch 30.00 at mouja- Khano, in between Ch 140.00 and Ch 160.00 at mouja- Baradighi, Block- Galsi-II in the District of Purba Bardhaman within Sanko (I) Section of D.C. Hd. Qtr. Sub- Division under D.
Repairing of Khalasi Shed of Papra C R gate of H.Q. Section under K.C. Sub-Division No-III of K.C. Division No-II Khatra Bankura during the F.Y 2025-26.
M/R to amrah w.c in between near NH-2 to Banka river in Block- Bardhaman-II under D.C hd Qtr Sub- Division within Damodar Canal Division.
Repairing of Khalasi Shed of Dakai CR gate of Kankradara Section under K.C. Sub-Division No-III of K.C. Division No-II Khatra Bankura during the F.Y 2025-26.
Restoration of Sundarban Embankment Damaged due to New Moon kotal from 16-05-2026 to 19-05-2026 Near Fishery of Montu Sardar for a length 300.00 m, facing River- Bidyadhari (L/B) Mouza-Nazat , G.P.-Nazat-II, Block-Sandeshkhali -I of Haroa Irrig
Emergent restoration of Sundarban Embankment Damaged occured on dated 03.6.2026 due to Full Moon Kotal Near HO Sabir Molla for a length 170.00 m, facing River- Bidyadhari (L/B) Mouza-Baunia, G.P.-Nazat -I, Block-Sandeshkhali -I of Haroa Irrigatio
Restoration of Sundarban Embankment for a length of 80 Mtr. facing River Raimongal (L B) near H O Madan Das due to damage occured on 17.05.26 at Mouza- Ramapur in Block- Hingalganj under Hingalganj (I) Sub-Division in the Jurisdiction of Basirhat
Emergent repair of Sundarban embankment damaged due to New Moon Kotal during 25.05.26 along river-Dansa(L/B) near Dholkhali Refugee FP School for a length of 75 Mtr. at Mouza- Dholkhali, Block- Sandeshkhali-II, under Hingalganj (I) Sub-Division of B
Restoration of Sundarban Embankment damaged due to new moon kotal on dated 20.05.26 for a length of 220 Mtr. along the R/B of River Kalindi Near H/O Gour Gain at Mouza- Choto Sahebkhali in Block- Hingalganj under Hingalganj (I) Sub-Division of Bas
Emergent restoration to Sundarban Embankment damaged on 17.05.2026 due to New Moon Kotal along the river Sahebkhali (R/B), Near BSF check post at Mouza Amberia for a length 50.00 metre in Block - Hingalganj of Hingalganj (I) Sub-Division under Basi
Emergent restoration of Sundarban Embankment damaged on dated on 20.05.26 along left bank of river Raimongal for a length of 110M near H/O Anju Haldar at Mouza- Hemnagar, Block-Hingalganj under Basirhat Irrigation Division in the District of North 2
Emergent Palliative work to divert flow of river Juranti to its middle course by removing bed material at village BDR Basty ,Bagrakote GP Block and PS Malbazar Dist-Jalpaiguri.
Emergent repair of Sundarban embankment damaged due to New Moon Kotal on 25.05.26 along river-Dansa(L/B) near Khulna Rajani ferry ghat for a length of 260 Mtr. at Mouza- Khulna, Block- Sandeshkhali-II, under Hingalganj (I) Sub-Division of Basirhat I
Routine care and maintenance of existing garden of Jalasampad Bhawan, Salt Lake City for the financial year 2026 27
Emergent restoration of Sundarban Embankment damaged on dated on 17.05.26 along left bank of river Raimongal for a length of 110M near H/O Gobindo Mondal at Mouza- Ramapur, Block-Hingalganj under Basirhat Irrigation Division in the District of North
Annual maintenance by Clearing and removing water hyacinth, semi solid mass and jungle cutting for a length of 626 Metre of Sulanguri Pass Khal for One year under Bidhannagar Municipl Corporation, PS Newtown, Dist. North 24 Parganas
Annual maintenance by clearing and removing water hyacinth, semi solid compact mass and jungle cutting from DD 1 Khal for a length of 1777 M for One year within Rajarhat Block, Dist North 24 Parganas.
Jungle Cutting at premises of Bhaluka Bungalow, Office Campus and Stack yard For 1 year Block-Ratua-I, PS-Ratua Dist-Malda under Mahananda Embankment Division 2nd Call
Assessment of present cross sectional profile with topographical survey of Howrah Drainage Channel, Branches No I II III VI Swarnamoyee Khal and Balitikuri Khal for preparation of a comprehensive plan for re-excavation work under EE I LDI
Assessment of present cross sectional profile with topographical survey of River Bali under SE Eastern Circle Sandeshkhali II block district of North 24 Pgs to be conducted by River Research Institute under Irrigation Waterways Department Govt
Clearing and removing floating water hyacinth and vegetative growth including floating debris of Branch Channel of Suryapur Inner Channel in between Ch. 0.00 to Ch. 70.00 in Block - Mograhat-II, P.S. - Mograhat, South 24 Pgs for 2026-27 (2nd call).
Replacement of Gate No 33 , 34 with new shutters without depending of Durgapur Barrage , Special repair and maintenance of 02(two) nos. emergency floating gates along with necessary replacement of valves including painting over river Damodar
Protection work for a length of 75.0 m along both bank of DD1 East branch channel in between 2050.00 m to 2550.00 m within Ward No. - 108 of KMC area, P.S. - Anandapur, Dist - Kolkata during year 2026-27. (2nd Call)
M/R to inspection path in between ch. 110 and ch. 185.5 of Dy-3 of KMC(L) ) at Mouza- Habra, Block- Sarenga, District- Bankura and at Mouza- Jamdahara, Block- Garhbeta-II, District- Paschim Medinipur under Dubrajpur Section under K.C.S.D-IV,Sarenga
M/R to Inspection path in between Ch. 0.00 to Ch. 5.00 and Ch. 20.00 to Ch. 35.00 of DY-3 of Bandhu Main Canal of Bandhu (I) Scheme under Purulia Construction Division (I) in Block and P.S.-Arsha, Dist.-Purulia .
Repair and renovation of Field Hostel of Barabhum Irrigation Scheme under Purulia Construction Division (Irrigation) Block P.S Barabazar, District Purulia.
Protection work to the right bank for 160 M length at Vill Adadanga and to the right bank for 250 M length at Vill Ashrampur of River Haria in Block and PS Bamongola District Malda Sarasori Mukhyamantri
Protection along left bank of Rajapur main Khal near Chengail Sekhpara for a length of 50.00 Metre in Uluberia Municipality P.S-Uluberia, Ward No-16, District-Howrah under Rajapur Section of Seijberia (I) Sub-Division.
Renovation work of Boundary wall at Seijberia Irrigation Sub-Division Office near Annex building for a length of 30.00 m in Uluberia Municipality, P.S-Uluberia, Ward No-21 District-Howrah under Rajapur Section of Seijberia (I) Sub-Division.