Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
8,278 results • Latest
CONSTRUCTION OF CARRIAGEWAY BY LAYING CC PAVER BLOCK INFRONT OF IMMERSION GHAT AT ITKHOLA POND (BIG) IN WARD. 114 UNDER BR. XI.
RESTORATION OF ROAD SURFACE ALONG BENOY BOSE ROAD FROM XING OF RAMESH MITRA ROAD TO XING OF SARAT BOSE ROAD IN WARD NO -072.
CLEANING SWEEPING AND WASHING IN PLANT AREA INCLUDING JETTY AT MULLICK GHAT PUMPING STATION
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 39 RAMESH MITRA RD,45 GIRISH MUKHERJEE RD ,2A,63/C TOWNSHEND RD,91/2 BAKUL BAGAN RD ETC IN WD NO-72 DISTURBED BY CESC, NATURAL WEAR AND TEAR.
Urgent dismantling and restoration by replacement of defective spares as well as installation of DWF Pump Unit - F having capacity - 127 Cusec, Head - 5.5 M at PBPS(Drg.)/S and D.
REPAIRING WITH REPLACEMENT WORK OF ELECTRICAL WIRING AND ACCESSORIES AT BR III OFFICE BUILDING UNDER KMC.
PROVIDING AND FIXING M.H.COVER / G.P. COVER/ C.P. COVER / INSPECTION PIT COVER AT DIFFERENT PLACES IN WARD NO. 72, BR-VIII.
REPAIRING AND REPLACEMENT OF LIGHTING SYSTEM AT DIFFERENT PLACES IN WARD NO 62
PROCUREMENT, SUPPLY AND INSTALLATION OF 415V, 800A MCCBs IN MAIN ACB DISTRIBUTION PANEL AT DEEPER SUMP-1 UNDER BDPS.
PROCUREMENT , SUPPLY AND INSTALLATION OF 415V, 630A MCCBs for ABS MAKE SUBMERSIBLE MOTOR FEEDR 1,3 AND 8 AT DEEPER SUMP AT BDPS.
Complete servicing and overhauling of 11 kv 1250A main incomer VCB with allied works at Monikhali DPS under GRBU.
Repairing and commissioning with replacement of worn out components of 55 cusec capacity pump unit no. 9 at UDPS.
Repairing and commissioning with replacement of worn out components of 35 cusec capacity SWF pump unit no. 4 at KMPS
URGENT INSTALLATION OF TRANSFORMER AND HT VCB PROTECTION EARTHING OF 4 NUMBERS TRANSFORMER AND 6-PANEL HT VCB AT DEEPER SUMP SUB-STATION UNDER BDPS.
RESTORATION WORK OF WATER SUPPLY MAIN BY LEAK REPAIRING, CAP WASH AND ANCILLARY WORKS AT DIFFERENT AREAS OF GARFA MAIN ROAD, NEW SANTOSHPUR AND SURROUNDINGS IN WARD NO. 104, BR- XI.
IMPROVEMENT OF UTTARAN LIGHTING SYSTEM AT DUMDUM ROAD UTTARAN AND DIFFERENT OTHER UTTARANS IN WARD NO-02
RESTORATION WORK OF WATER SUPPLY MAIN BY LEAK REPAIRING, CAP WASH AND ANCILLARY WORKS AT SANTOSHPUR AVENUE, RAJAPUR EAST AND SURROUNDINGS IN WARD NO. 103, BR- XI
MAINTENANCE AND RESTORATION WORKS OF WATER SUPPLY SERVICE CONNECTIONS BY LEAK REPAIRING, CAP WASH AND OTHER ANCILLARY WORKS IN DIFFERENT AREAS OF RAJDANGA SCHOOL ROAD, BOSEPUKUR IN WARD NO. 107, BRXII.
Dismantling,repairing with replacement of line shaft and other worn out components of 1950 LPS capacity pump unit no.2 at Ambedkar Drainage Pumping Station.
RESTORATION OF PAVER BLOCK AND IPS ON FOOTPATH NEAR 54/1/D,78 B BAGAN RD,21 TOWNSHEND RD,15/3 PRIYANATH MULLICK RD ETC IN WD NO 72 DISTURBED BY CESC, NATURAL WEAR AND TEAR.
INSTALLATION OF PVC PIPES SURROUNDING THE STREET LIGHTING POLES AT DIFFERENT PLACES IN WARD NO - 47
IMPROVEMENT OF UTTARAN PASSAGE NEAR C/30/5, E/194,E/193 RAMGARH ETC IN WARD, 100 BR.X
IMPROVEMENT OF ILLUMINATION BY INSTALLATION LED LIGHT FITTINGS AND ALLIED ELECTRICAL WORKS AT DIFFRENT PLACES IN WARD NO-31 UNDER BR-III.
IMPROVEMENT OF PARK LIGHTING SYSTEM OF VIVEKANANDA PARK, TRIKONE PARK AND OTHER PARKS AT WARD NO -33 AND 35 UNDER BR III.
IMPROVEMENT OF STREET LIGHTING SYSTEM AT BAGMARI ROAD AND OTHER PLACES IN WARD NO 14 UNDER BR III
SUPPLY AND DELIVERY OF STREET LIGHT LED FITTINGS AT BELEGHATA MAIN ROAD AND OTHER PLACES IN WARD NO-33 UNDER BR-III
SUPPLY AND DELIVERY OF STREET LIGHT LED FITTINGS AT ARIF ROAD AND OTHER PLACES IN WARD NO-13 UNDER BR-III
REPAIRING WITH REPLACEMENT OF DAMAGED PILLAR BOX,POLE AND OTHERS ELECTRICAL ACCESSORIES AT WARD NO 29, 30, 33 UNDER BR III.
IMPROVEMENT OF PARK LIGHTING SYSTEM OF APC PARK , RAMKRISHNA VIVEKANANDA PARK AND OTHER PARKS AT WARD NO -31 UNDER BR III
RENOVATION OF STREET LIGHTING SYSTEM AT WARD NO 33 UNDER BR III
IMPROVEMENT OF ILLUMINATION BY INSTALLATION LED LIGHT FITTINGS AND ALLIED ELECTRICAL WORKS AT DIFFRENT UTTARAN IN WARD NO-14 UNDER BR-III.
TEMPORARY LIGHTING ARRANGEMENT FOR IMMERSION OF IDOL DURING DURGA PUJA, KALI PUJA, LAKSHMI PUJA AND JAGADHARTI PUJA AT TEN NOS OF GHATS ON ADI GANGA RIVER UNDER BR-VIII AND IX.
TEMPORARY LIGHTING ARRANGEMENT FOR IMMERSION DURING DURGA PUJA,LAKSHMI PUJA,KALI PUJA AND JAGADHARTI PUJA FESTIVAL AT DAHIGHAT IN WARD NO-80.
MAINTENANCE OF AREAS OF THE PLANT PREMISES AT JAI HIND JAL PRAKALPA.
REPAIRING OF CONCRETE AND PAVER BLOCK FOOTPATH AT SASHI BHUSAN DEY ST, JADU SREEMANI LANE ETC IN WARD-50
REPAIRING OF ROAD SURFACE AT CREEK ROW AND OTHER DIFFERENT PLACE IN WARD NO 50
REPAIRING AND RESTORATION OF PAVER BLOCK AND I.P.S FOOTPATH AND PASSAGES AT BIPIN BEHARI GANGULY STREET AND OTHER DIFFERENT PLACES IN WARD-50
REPAIRING OF PASSAGES AT REFUGE LN ETC IN WARD NO-50
RESTORTION OF I.P FOOTPATH INCLUDING ANCILLARY WORK AT SANTOSH MITRA SQUARE SURROUNDING AREA ETC IN WARD-50.
RESTORATION OF I.P.S FOOTPATH AT RAM NARAYAN MATILAL LN, ETC IN WARD NO-50.
REPAIRING OF PAVER BLOCK AND I.P.S FOOTPATH AND PASSAGES AT A.J.C BOSE ROAD (PORTION) ETC IN WARD-50
RESTORATION AND REPARING OF PAVER BLOCK FOOTPATH AT S.N. BANERJEE ROAD ETC IN WARD 50.
RESTORATION OF PASSAGE AND FOOTPATH AT 23/1, J.M.M ROW, 22, NOOR MD LN ETC IN WARD 49,BR-V
SUPPLYING, FIXING M H COVER/ G P COVER/ C P COVER/ INSPECTION PIT COVER ACCORDING TO REQUIREMENT WITHIN 24 HOURS IN WARD NO-044, BR-V
RESTORATION AND REPAIRING OF FOOTPATH AT COLLEGE STREET AND MAHATMA GANDHI ROAD IN WARD NO. 44.
REPAIRING AND MAINTENANCE OF BOROUGH OFFICE OLD BUILDING (PORTION AS PER REQUIREMENT) IN WD. 40, BR-V.
REPAIRING OF UTTARAN PASSAGE AT 3, 18 NIL MADHAB SEN LN., 9/5 PHEARS LANE, 35 CHATAWALA GULLY ETC IN WARD NO. 44.
REPAIRING AND RESTORATION OF FOOTPATH BOTH SIDE OF C.R.AVENUE IN WARD NO. 44.
REPAIRING OF DIFFERENT UTTARAN ARES LATRINES AT 3, 35 CHATAWALA GULLY, 112, 114, 116 M.G.ROAD ETC. IN WARD NO-44.
RESTORATION OF ROAD DISTURBED BY P.U.AGENCY AT DEBENDRA MULLICK ST., RAM KAMAL SEN LN. AND BHAWANI DUTTA LN. ETC IN WARD NO. 44