Loading…
Loading…
9,079 results • Latest
MAINTENANCE OF SEWER LINE BY DESILTING WORK AT MAYURBHANJ ROAD,MEHAR ALI MONDAL ST, BINDU BASHINI ST. AND SURROUNDING AREA IN WARD NO.- 078
MAINTENANCE OF SEWER LINE BY DESILTING AT MOMINEPORE RD, MD.BURIAL GROUND LANE, EKBALPORE LANE AND SURROUNDING AREA IN WARD NO- 078
MAINTENANCE OF DRAINAGE SYSTEM AT DIFFERENT PLACES OF K.B RD AND BYE LN ETC.UNDER UTTARAN SERVICE IN WARD N0- 140, UNDER BR-XV.
MAINTENANCE OF SEWER LINE BY DESILTING AT EKBALPORE LANE, NAWABAB ALI LANE AND SURROUNDING AREA IN WARD NO. -078
INSTALLATION OF INSULATING METERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 106 UNDER BR-XII
INSTALLATION OF INSULATING METERIALS ON THE STREET LIGHT POLES AT DIFFERENT PLACES IN WARD NO 108 UNDER BR-XII
LAYING OF 100 MM. DIA. D.I. PIPE NEAR 113,583/1 M.L.GUPTA ROAD,235/15,41 S.B.F.ROAD,6E,82B,50/1/2 H.C.M.ROAD,47E B.B.ROAD,108/5 M.G.ROAD ETC. IN WARD NO-122,BR-XIII.
Regular maintenance of pumps, motors, electro-mechanical accessories with other allied works at Ultadanga Underpass pumping station under DLPS.
URGENT REMOVAL OF CHOKAGE IN SEWER /REPAIRING OF COLLAPSED SEWER/REPAIRING OF DAMAGED SEWER IN WARD NO-11,BR-II
SUPPLY OF BRUSH CUTTER MACHINE(4-STROKE) IN PARKS nSQUARE DEPARTMENT(FROM BR-I TO BR-XVI)
ENGAGEMENT OF ELECTRICAL NIGHT GANG FOR EMERGENCY BREAKDOWN/ DISASTER PREPAREDNESS OF LIGHTING SYSTEM FOR AVOID ANY TYPE OF ACCIDENT AND PUBLIC SAFETY UNDER BOROUGH-XI
OPERATION AND MAINTENANCE OF ELECTRICAL INSTALLATION AT DIFFERENT INSTITUTION UNDER BR-XI, KMC
REJUVENATION OF EXISTING DAMAGED ROAD INFRONT OF 117B, SARAT GHOSH GARDEN ROAD (KAMALA PARK) IN WARD 091, BR-X
IMPROVEMENT AND RENOVATION WORKS WITH ENERGY EFFICIENT LIGHT ALONG THE EASTERN AND WESTERN CROSSING POINT OF KALIKAPUR AND BAGHAJATIN ROB OF EM BYPASS.
IMPROVEMENT OF ROAD NEAR I/29/1,I/32/D BAGHAJATIN COLONY ETC IN WARD NO- 99, BR-X (APAS/01/150/247/0001)
DESILTING OF UNDERGROUND SEWERAGE ALONG WITH MENDING OF SEWERAGE SYSTEM AT DORJIPARA UTTARAN ETC. IN WARD - 094, BR. - X, (SCHEME ID. - APAS/01/152/2/0003)
ROAD RESTORATION FOR RESTORATION OF ROAD DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT CHRISTIAN PARA FROM 759, RABINDRA PALLY BRAHMAPUR TO V- 48, VIVEKANADA PARK ROAD IN WARD NO. 111 UNDER BR XI
REPAIR AND MAINTENANCE CONTRACT OF 16 NOS WEIGHING MACHINE FOR DIFFERENT STORES UNDER SUPPLY DEPARTMENT FOR NEXT TWO YEARS.
REPAIRS TO UTTARAN COLLAPSE PIT, CATCH PIT,S.W PIPE AT 2,SAMBHU CHATTERJEE ST. 6, KEDAR BANERJEE 3/1 MARCUS SQ. AND OTHER UTTARAN PLACES IN WD NO-039.
CONSTRUCTION OF BOX DRAIN INSIDE CHITPUR RAIL YARD (SOUTHERN SIDE) IN WARD NO 005
FABRICATION AND ERECTION OF MS STRUCTURE FOR RCC CHAMBER ON TARATALA ROAD OPPOSITE TARATALA VALVE STATION WITH OTHER ALLIED WORKS.
Cleaning and removing of floating foreign materials from electro mechanically lifted bar screen with taking all safety measures for five months with other allied works at SSE PS under Kudghat Unit/S and D Department.
CONST. OF SANITARY LATRINE AT 22 BIGHA AND KALYANNAGAR SLUM AREA IN WARD NO.-143.
CONST. OF SANITARY LATRINE AT CHAKTHAKURANI AND DHALIPARA SLUM AREA IN WARD NO.-143.
SUPPLY AND LAYING KERB CHANEEL ALONG SOME PORTION OF M.G. ROAD FROM J. L. SARANI CROSSING TO CHURIAL BRIDGE IN WARD NO.-143.
CONSTRUCTION OF COVER SLAB OVER SURFACE DRAIN AT DHALIPARA NAZRUL SARANI BYE LANE NEAR PRE. NO.-3/3 IN WARD NO.-143.
CONSTRUCTION OF U.G. SEWER AT DHALIPARA BYE LANE SLUM AREA NEAR PRE. NO.-93 IN WARD NO.- 143.
REPAIRING OF DAMAGED ROAD SURFACE AT BAGDIPARA ROAD TO JELIA PARA ROAD NEAR PRE. NO. Y2-156/J/1, Y2-156/1, Z5-199, Y2-152/6, Y2-152/3, Z3--273/9, Z3/273/A/1, Z3-232, Z3-233/A IN WARD NO-140, BR-XV.
DEVELOPMENT OF PASSAGE BY C.C NEAR 98/10, 100/2, 100/1 ETC. RAMKANTAPUR AND ITS SURROUNDING SLUM AREA IN WARD NO-142,BOROUGH-XVI
INSTALLATION AND IMPROVEMENT OF STREET LIGHTING SYSTEM BY LED LIGHT FITTINGS FROM E. M. BYEPASS TO DHAPA CHECK POST IN WARD NO-58, BR-VII.
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT BASANA KALI BARI IN WARD NO. 111 UNDER BR XI
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT AT SONALI PARK FROM E/1 SONALI PARK TO TRIMURTY ENTERIPSE IN WARD NO. 113 UNDER BR XI
RESTORATION OF TRENCH DISTURBED BY WBSEDCL DUE TO LAYING OF CABLE DUCT FROM H/O LOKENATHNATH BASTRALAYA TO YUVA SANGHA CLUB WARD IN WARD NO. 113 UNDER BR XI
INSTALLATION OF LIGHTING ARRANGEMENT AT SANTOSHPUR LAKEAREAS IN WARD NO-103, BR-XI
INSTALLATION OF LIGHTING ARRENGEMENT AT BEGUM ROKIA PARK AT WARD NO 64 UNDER BR- VII.
INSTALLATION OF HIGH MAST LIGHTING SYSTEM AND MINI MAST LIGHTING SYSTEM ALONG WITH OTHER ELECTRICAL WORKS AT DHAPA DUMPING GROUND SURROUNDING IN WARD NO-58.BR. NO-VII
ELECTRICAL MAINTENANCE OF LGHTING SYSTEM AT SANTOSHPUR MARKET AND JAYASHREE MARKET UNDER BOROUGH XI,KMC
Repairing, servicing and replacement of worn out components of 3 nos. electrical de-watering pump (18.5 KW Motor and SP6L pump) under SCD(North).
Repairing and servicing with replacement of worn out components of 3 Nos.two ton capacity indef baby link chain electric hoist at Ambedkar Drainage Pumping Station.
Urgent dismantling, repair and overhauling with replacement of top shaft and other worn out components of 1950 LPS capacity pump unit no.1 at Ambedkar Drainage Pumping Station.
Cleaning of clogged materials from the submersible pumps as and when required at Chakgaria Rajapur ,Jorabridge and Rajdanga drainage pumping station.
SUPPLYING, INSTALLING, OPERATING OF 02 NO. OF PORTABLE PUMP SETS OF 3 INCH DIA. AT 1) SHIL THAKUR BARI ROAD AREA AND 2) D.H. ROAD NEAR BEHALA POLICE STATION IN WARD NO -119.
RENOVATION OF THREE NOS. VALVE CHAMBERS ALONGWITH REPLACEMENT OF RUBBER GASKET, FLANGE JOINT AND BLANK FLANGE OF 600 MM DIA BUDGE BUDGE DEDICATED LINE INSIDE GARDEN REACH STP COMPLEX.
IMPROVEMENT OF ROAD AT DIFFERENT PLACES UNDER KMC WARD NO.66
Supply of manpower for transportation of Construction and Demolition (C and D) material from narrow passage (inaccessible for vehicles) to nearby transportation vehicles access point under Borough III for SWM-I department
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLE BODIES AT DIFFERENT PLACES IN WARD NO-78 UNDER BR. IX.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLE BODIES AT DIFFERENT PLACES IN WARD NO-77 UNDER BR. IX.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLE BODIES AT DIFFERENT PLACES IN WARD NO-75 UNDER BR. IX.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLE BODIES AT DIFFERENT PLACES IN WARD NO-76 UNDER BR. IX.
INSTALLATION OF INSULATING MATERIALS ON THE STREET LIGHT POLE BODIES AT DIFFERENT PLACES IN WARD NO-88 UNDER BR-VIII.