Loading…
Loading…
823 results • Latest
Providing Man Power for Water Management of Canal from Ch. 0.00 to 25.00 KM and its Distributaries and Laterals of ALBC for the year 2026-27.
Removal of silt and jungle clearance of 0 to 8 KM L 17 and 0 to 6.20KM L 6 and Ch 0 to 6.40 KM R 4 in selected reaches Dy 11 of IBC
Removal of silt and jungle clearance of 0 to 1.44 L-1, 0 to 1.19 L-2 in selected reaches Dy-12 of IBC
Removal of silt , jungle clearance from km 0.00 to1.905 of Dy-36 and from 0.00 to 3.583 km Dy 37 and from km 0.00 to 4.74 of Dy-37A of ILC Including laterals of ILC (Selected Reaches)
Removalof silt , jungle clearance from km 0.00 to 2.735 of Dy-40 and from km 0.00 to 3.290 ofDy-40A of ILC including laterals (Selected Reaches)
Improvement to service road of dy 38 and dy 40 of ILC (selected reaches)& Repairs to Gates of Dy-36,37,37A,38,39,39A,40 & 40A of ILC
Gate Repairs to the Head regulators of Lat No-1R/S,2R/S,1A L/S and 1B L/S Of NRBC D-17
AME of Canal for the year 2026-27 of L/s & R/s Laterals/Sub laterals of NRBC Distry No.17.
AME of canal for the year 2026-27 of Distry-17 of NRBC from KM 0.00 to 13.00 including Direct Laterals
Removalof silt , jungle clearance for main canal from km 75.00 to 95.00 and 114.0 to 120.00 Km of ILC.(selected reaches)
Removal of silt and jungle clearance of 0 to 18.55 KM in selected reaches Dy-12 of IBC
Removal of silt and jungle clearance of ch 10 to 20 km of KBC in selected reaches
Providing Protection wall on SR & IP side from Ch.132.300 km to 132.700 km of ILC.
Repairs to chute at tail end reach of lat-2 of Dy-51 of ILC.
Construction of inlet of Lateral no.7 of IBC Dy.6 and Construction of Chute at chainage 0.00km to 0.35km of Lateral no.7 of IBC Dy-6
Repairs to CTC in Lateral no.6 of Dy.6 of IBC
Reconstruction of damaged CC lining, Pipe culvert and Drop in Sy No 55 of Balundagi Village comes under SL-5 of L-21 in Dy-11 of IBC.
Removal of silt and Jungle clearance at selected reaches of Dy-5 & Dy-5A of IBC and Jungle clerance near Aqueduct at Ch.30.00 & Ch.36.12km
Removal of silt and jungle clearance of 15 to 39 KM in selected reaches Dy-11 of IBC
Removal of silt and jungle clearance of 0.00 to 3.50 km of Dy-12A and ch 0.00 to 2.40 kmof Dy-12B in selected reaches of IBC
Removal of silt and jungle clearance of 0 to 19 KM Dy-14 of IBC in selected reaches
Repairs to CTC at 1.065 km of Dy-10 of IBC
Improvement to SR from 133.720 to 133.820km & 134.900 to 134.950km of ILC
Repairs to CTC at ch.0.100 km of Lat-4 of Dy-13 of IBC
Repairs to lining in lat-4 at selected Reaches in Dy-13 of IBC
Repairs to CTC at ch.0.450 km of lat-11A of Dy-13 of IBC.
Repairs to lining at selected reaches of Dy.5B of IBC
Repairs to damaged CC Lining from KM 16.00 to KM 17.00 of KBC
Repairs to lining and drops at ch13.20 to 13.40 of of Dy-14 of IBC
Removal of Silt and Jungle clearance at Selected Reaches from 0.00 to 3.640 km of sl 6 0.00 to 2.560 km of sl 7 0.00 to 1.380 km of sl 7A 0.00 to 2.540 km of SL-8 of of Lat 9A of Dy-13 of IBC. .
Removal of silt and Jungle clearance at selected reaches from 5.00 to 8.50 km of Dy-6 of IBC
Removal of silt and Jungle clearance at selected reaches of LR4, LR3 of Dy-5B & L1 of Dy-5A of IBC
Clearing of Jungle & removal of silt from Dy-8,9 &10 of IBC at Selected reaches for the year 2026-27
Clearing of Jungle & removal of silt from KBC 0.0 to 10.00km, ILC 131.00 to 135.00 & IBC 40.00 to 50.00 km at Selected reaches for the year 2026-27
Removal of Silt and Jungle clearance at Selected Reaches and from 0.00 to 15.100 Km of Lat-9A of Dy-13 of IBC .
Removal of Silt and Jungle clearance at Selected Reaches and from 0.00 to 31.600 Km ,of Dy-13 of IBC
Removal of Silt and Jungle clearance from 20.00 to 25.00 Km of KBC and 0.00 to 2.00 km of Dy-50 of ILC .
Overhauling, servicing of EOT Crane 14 Ton and 7 Ton Capacity and replace requisite spare parts at Herkal South and Herkal North LIS Headwork
Shifting, Testing and Commissioning of 1 x 6.50 MVA 110/6.6 KV step down Power Transformer of make ESENNAR TRANSFORMER from Nagarabetta Lift Irrigation Scheme Headwork at Bangargunda village of Muddebihal taluka to herkal South LIS Headwork at Kaladagi Village of Bagalkot Taluka.
Improvemnts to Service Road at dy 40B at ch 5.20 to 6.00 km of ILC.(Selected Reachs)
Reconstruction of Pipe culvert at ch 0.20 and raising of embankment from 0.10 to 0.20 in Dy-31 of ILC.
Repairs to cc lining from ch 3.5 to 3.80 km of Dy 32 of ILC
Repairs to gates of Dy-32,33,33A,34,35 and Escape gate at 72 km of ILC.
Repairs to damaged to CTC at ch 4.5 km of distributory no.35 and CC linining in Selected Reaches from 4.2 km to 4.6 km of ILC
Removal of Silt and jungle clearance main canal from 0.00 to 10.00 km and Dy-1 from ch 0.00 to 3.00 km of Nagthan Branch canal for the year 2026-27 (Selected Reaches)
Reconstruction of Pipe culvert at ch 0.50 and 0.7 km of dy 33 of ILC.
Removal of Silt and jungle from km 105.00 to 113.00 km of ILC and from 0.00 to 5.7 km of Dy-43 and its Laterals, from km 0.00 to 5.33 of Dy-45 and its Laterals of ILC (Selected Reaches)
Repairs to cc lining and Raising of Embankment in Lat-2 from 0.05 km to 0.250 km of Dy-29 of ILC and dy 29 from km 9.6 to 9.79 and dy 28 from km 3.4 to 3.62 km ( Selected Reaches)
Removal of silt & jungle clearance tamba canal from 0.00 to 8.00km of NBC (selected reaches)
Removal of silt & jungle clearance from chainages km 30.00 to 40.00 of main canal and Dy-18 of NBC (selected reaches)