Loading…
Loading…
823 results • Latest
Package work for Removal of silt, and jungle from ch 0.020 to 1.740 of Lat.No.1A of D-9 , from ch 0.020 to 3.780 of Lat 6 of D-9 , from ch 0.020 to 1.510 of Lat 8 of D-9 and from ch 0.020 to 1.800 of Lat 7 of D-9 of NRBC
Supply, erection and commissioning of Buttrfly valve with RCC chamber for Kainkatti line and Kerur line to regulate water under Herkal LIS
AME OF KONGANDI LIFT IRRIGATION FOR THE YEAR 2024-25 Material and Manpower
Deployment of Outsource Staff in Circle, Division Alamatti/ Bheemarayanagudi and Sub-Divisions under Executive Engineer KBJNL, Q.C. Division Bheemarayangudi.
Deployment of Outsource Staff in the office of the QC Division No.1 Almatti and Sub Divisions there under and in the office of the QC Division Bheemarayanagudi and Sub Divisions there under for 12 months wef agreement
Providing Emergency Security Surveillance to Narayanpur Dam including Comprehensive Maintenance for five years
Providing New Computer ,Zerox machine,Printer ,etc to IBC Division no-02 Almel office for the year 2025-26
Removal of Jungle and Silt Clearence from Lateral No.9,11,12 ,13 & its Sub laterals of Arakera Branch Canal of D-9 (A) of NRBC.( In selected reaches )
AME of canal for the year 2026-27 of Arakera Branch Canal Distry-No.9 (A) of NRBC from KM 0.00 to 22.87KM.Including its laterls/sub laterals
Reconstruction of damaged SR in BC Soil reach from ch 6.00 km to 10.80km of WBC under RLIS
Manpower supply from outsourcing to Hattigudur sub division-12 against sanctioned posts for the year 2026-27.
supply of table,chair,And almera,etc to IBC sub division no-24.Rampur,for the year 2025-26
Special repairs of HR BD-1 of D-18 and laterals 1,2,3,4and 5 of D-18(from 0.00 to20.00km) NRBC.
Removal of silt & jungle clearance in Lat-15 of BD-2 from Km 0.00 to 2.060 & Lat-16 of BD-2 from Km 0.00 to 1.080 of NRBC D-18 for the year 2026-27
Removal of silt and jungle clearnce of lat -4B, lat-8 of Distry no 18 for the year 2026-27
Removal of silt & jungle clearance in Left Side Laterals-1,2,3,4 & 5 of BD-3 of NRBC D-18 in selected reaches for the year 2026-27.
Suppy of Furniture For NRBC Division New office building
Removal of Silt and jungle in Main Canal from Km Ch 10.00 to 20.00, ch 30.00 to 40.00km, under DC-1 of TLIS (Selected reaches)
Supply of furniture for Division and Sub-division office No.6, No.7 Hunasagi and No.7 Mudnoor office
Consultancy services for topographical survey, Investigation, excavation for trial pits including detailed Engineering, preparation of designs, drawings, estimates and DTP for main canal and distributaries network including preparation of necessary land acquisition proposals for Bhagavathi LIS (Stage-II) in Bagalkot Taluk Bagalkot District
Design manufacturing supply errection testing & commissioning of 0.047or more cumecs discharge for Hoskera melina kere of capacity 6.5 Mcft for filling in 90 days twelve hours run by lifting water from SBC main canal at Ch23.100 Km consisting of RCC sump pump house MS raising main for 2.50 Km length of required diameter and 5mm thickness and one coat of 40 micron thick zinc rich epoxy primer paint and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and one coat of 40 micron thick zinc rich epoxy primer paint and two coat of 100 micron thick each coat coal tar epoxy paint for outer surface Intake pipe of RCC NP3 pipe of 600 mm dia with RCC head wall and control gate at canal side pumping machinery and delivery chamber RCC 2 numbers of submerssible pumps each carrying discharge capacity of 0.042 or more with pump head of arround 30 meters including pressure gauge level gauge delivery pipes with butterfly valves nonreturn valves scour valves kinetic air valves pannel boardstar delta starter earthings LTcapacitors to improve power factor UG cable from Transformer to motors starters capacitors obtaining necessary approval from GESCOM and other governement agencies for commssioning Manifold Electrical cables of1amps/sqmm current density complete asper specification and as directed by the Engineer incharge including operation and maintenance for a period of five years on Turnkey basis and Including Bund strengthing , Bund pitching works for for Hosekera meline kere on Turnkey basis
Restoration of canal from 0.61km to 0.70 km of Lat-1 of Kakkera Major of D-5 of HBC (Reserved for CAT-IIA)
Restoration, Installation of Expansion Bellow for Raising main at Rajankollur LIS of NLBC
Special Repairs to CC lining and raising of embankment at aqueduct no 4 to 7 of IBC Dy-17A
Special repairs to CC Lining and Raising of Embankment from km 0.00 to 10.00 of Dy 18 under IBC
Special repairs to CTC Head wall and pipe replacement Lateral L-1 at 0.500 km and L-5 at Ch 1.300 km of Dy 18 under IBC
Special repairs to damaged CD to at ch 2.500 km of Sub lateral-1 of Lateral-9 of Dy-25 under IBC
Special repairs to CD at ch 5.200 km of Dy-21 under IBC
Raising of embankment at ch 1.800 to 2.500 km in selected reaches of DY-19A of IBC
Repairs to Damaged Lining from 50.00 to 55.00, 55.00 to 60.00 and 60.00 to 64.00km (selected Reaches) main canal of NLBC & Construction of head wall of OR & OL of later-5 of Dy-8 of NLBC (Package work)
Repairs & Renovation to Sub Division No.11, 12 & 13 of Amarapur-Cross Camp
AME of Canal at 125.00 Km to 130.00 Km of NRBC Extension for the year 2026-27.
Restoration to Damaged Lining and improvement of SR to Lat 5, 6, and Lat 7 of Dy 14 of NRBC of Dy 14 of NRBC (Not Considered in ERM )
Special Repairs to damaged Canal lining and SR at Ch 2.00 to 4.20 Km of Lat-11 of WBC under RLIS.
Special Repairs to damaged Canal lining at Ch 7.40 to 9.00 Km and Ch 10.20 to 12.00 Km of WBC and SR in selected reaches of WBC under RLIS
Special Repairs to damaged CDs at ch.0.070 and 0.200 of Lat-6 of WBC under RLIS
Package work for (1) Removal of Jungle, Silt & Debris in selected reaches of D-2, D-4 & D-4A of EBC of RLIS and (2) Removal of Jungle, Silt & Debris in selected reaches of D-1A & its Lat-1 of EBC of RLIS.
Repairs/Restoration of damaged lining & SR at Ch.0.120 km and CD at Ch.1.70 km of Lateral-2 of D-3 of LOC of RLIS.
Unskilled labour for light work2 Labours for every 5 Km Unskilled labour for light work 1 Labour for every Tank/Head Regulator/Offtake
AME work was not taken up because of this the building needs major repairs such as repairs to wash rooms bath rooms repairs to Doors and Windows and providing seperate wash room attatched to EE chamber as this was not provided earlier Store Room DM Room their are no shelves for keeping records files etc which are very essential for serving the purpose of racks hence provision is made in the estimate for providing granite stone racks for facilitating to keep the old records files etc
Excavation in AKS C C 20 M 15 for side liningfor canal C C 20 M 15 for Bed lining for canal TMT steel renforcement
Repairs to bed and side Side lining at Chainage 40.280 to 40.290 and 42.470 to 42.500 of MLI West Canal for the year of 2026 - 27
Providing Man Power for water Management of Managuli Branch Canal (from ch 0.00 to 32.16km ) & its Distributary Network for tank filling purpose for the Year 2026-27
Clearing grubbing road land including vegetation Excavation and removal of silt and silt mixed with sand in dry condition
Unskilled labour for light work2 Labours for every 10 Km Unskilled labour for light work 2 Labour for every Tank/Head Regulator/Offtake
Providing Man Power for water Management of Tidagundi Branch Canal (from ch 17.43 to 40.00km ) for tank filling purpose for the Year 2026-27
Removal of Silt & Jungle clearance in from km 0.00 to km 63.88 of Huvina Hipparagi Branch Canal under MLIS - III for tank filling for the year 2026-27.
Removal of Silt & Jungle clearance from km 0.00 to km 56.00 of Tidagundi Branch Canal under MLIS -III for Tank Filling for the year 2026-27.
Supplying, Erection and Commissioning of Chemical Based Earth Pit of 110/6.6 KV Sub-station at Chimmalagi Lift Irrigation Scheme Headwork.
Providing Man Power for Water Management of Canal from Ch. 0.00 to 50.00 KM for Tank Fillings of East Canal under Chimmalagi LIS for the year 2026-27.