Loading…
Loading…
823 results • Latest
Removal of Silt and jungle clearance of Dy-46,56,57 including its laterals of indi lift canal 2026-27 (Selected Reaches)
Removal of silt , jungle clearnce from Dy 39 A From 0.00 to to 10.00 Km & from 0.00 to 7.64km of Dy-39B Including laterals of ILC (Selected Reaches)
Removal of silt and jungle clearence from Ch 0.00 to 11.960km of dy-30 including lat-1 to lat-12 from 0.00 to tailend of Dy-30 of ILC (selected reaches)
Removal of Silt and jungle from km 95.00 to 105.00 km of ILC and from km 0.00 to 8.66 km of Dy-40(B) and its Laterals, from km 0.00 to 12.76 of Dy-42 and its Laterals, (Selected Reaches)
Repairs to CC lining from ch.0.00 to 0.15 km of Dy-31A of ILC
Removal of silt and jungle clearence in Main canal from Ch 57.00 to 63.00 km & dy 31 from km 0.00 to 6.945 including Lat-1 to lat-6 & Dy-31A from 0.00 to 3.275km of ILC (selected reaches)
Improvemnts to Service Road at dy 42 at ch 6.3 to 7.8 km of ILC.(Selected Reachs) and Repairs to Gates of Dy-40(B), 41,42,43,44 and Dy-45 and Escape gate at Km 96.400 and 110.00 km of ILC and Cross regulator and Escape at 28.16 km of NBC
Reconstruction of damaged road bridge at ch 6.806 km of Dy-28 of ILC
Reconstruction of damaged road bridge at ch 0.788 km of Dy-28 of ILC
Removal of Silt and jungle clearance from 0.00 tail end of dy-34, and dy-35 with laterals 1 to 5 of ILC ( in Selected reaches)
Removal of silt , jungle clearance from km 0.00 to 5.695 for Dy-38 and Dy 39 from 0.00 to 2.11km Including laterals of ILC (Selected Reaches)
Removal of Silt and jungle clearance in main canal from ch 63.00 to 75.00 km & dy 32 from km 0.00 to tail end including Lat-1 to lat-15 & Dy-33 from 0.00 to tail end of ILC (in Selected reaches)
Removal of silt and jungle clearance from 10.00 to 20.00 km of NBC (in selected Reaches)
Removal of Silt and Jungle and Improvements to SR from Km 0.00 to 2.89 Km of D-5A, from Km 0.00 to 4.50 of D-5B of NLBC and From Km 0.00 to 3.16 Km D6 of NLBC (Package work)
Repairs to Damaged Lining and MCPC Head wall from0.00 to 4.00 Km of D-6 of HBC
Repairs to damaged CC lining at Ch.35.50 to 50.00 Km of NLBC & repairs to damaged drop at 6.00 Km. &lining of (selected reaches) D-5 of NLBC (Package work)
Repairs to damaged pipe culvert and protection wall at ch.4.00 km of dy-8 of NLBC.
Repairs to damaged CTC at Ch.1.380 Km. and protection wall of D-6 of NLBC
Repairs to damaged pipe culvert at 0.14 Km & 0.447 Km of L-2 of D-12A of NLBC & repairs to damaged CTC at 1.50 Km of D-12 of NLBC (Package work)
Restoration damaged pipe culvert to box culvert at Ch. 10.00 Km of Chennur pickup feeder channel
Repairs to damaged pipe culvert & CC lining of D10A (selected reaches) of NLBC
AME of JBC main canal from Ch 20.00 to 40.00 km including its Distry No 7,7A & 8 for the Year 2026-27
AME OF JBC Distry 13 &14(machinaries) for the year 2026-27
AME of JBC main canal from ch 00.00km to 20.00km including its Distry No 1 to 6 for the year 2026-27
Servicing, Overhauling and Requisite spare of 250 KVA Auxiliary Transformer No. 1 & 2 at Almatti Left Bank Canal Headwork.
Replacement of Drive End Bearing and Non Drive Bearing of Crompton Greaves Make of 1800 KW of Motor No. 10 and Supplying, Installation and Commissioning of Soft Starter Display of Jayshree Make for Motor No. 11 at Almatti Left Bank Canal Headwork.
Restoration of Manifold Concrete of Raising Main for Pump No. 1 to 10 at Chimmalagi Lift Irrigation Scheme Headwork.
Servicing and Overhauling of Non-Return Valve of 1400 mm dia size of KBL make for Pump No. 3 & 6 at Chimmalagi Lift Irrigation Scheme Headwork.
Restoration and Improvements to Damaged C.C. Lining from ch 0.30km to 0.50km and Providing lug above wall from ch 0.70 to 0.80of Dy.No. 23 of ILC.
Removal of Silt and Jungle clearance Selected reaches from Km 155.00 to 158.00 km of IBC
Removal of silt and jungle clearance from 142.00 to 147.00 km of ILC
Removal of silt and jungle clearance from ch.10.00 to 20.00 km of IBC Dy-17(A)
Removal of silt and jungle clearance from lateral L-1 to lateral L-6 to IBC Dy-18(DY-17)
Removal of silt and jungle clearance from ch.0.00 to 10.00 km of IBC Dy-17(A)
Removal of silt and jungle clearance L-1 to L-14 of IBC Dy-16
Removal of silt and jungle clearance of Ramanalli tank
Removal of silt and jungle clearance from 0.00 to 10.00 km of IBC Dy-16
Removal of Silt and Jungle clearanceSelected reaches from Km 158.00 to 160.00 km of IBC
Removal of Silt and jungle clearance Latrel-1 to Lateral-11 of Dy 18 under IBC
Removal of Silt and jungle clearance in Selected Reaches from ch.15.00 to 26.000 km Dy 18 under IBC
Removal of Silt and jungle clearance in Selected Reaches from ch.8.00 to 15.000 km Dy 18 under IBC
Removal of silt and jungle clearance from 0.00 to 5.00 km of IBC Dy-17
Removal of silt and jungle clearance of Main canal from ch.70.00 to 80.00 km of IBC
Removal of silt and jungle clearance from R-1 to R-6 of IBC Dy-16
Removal of silt and jungle clearance lateral L-1 to lateral L-7 of IBC Dy-15 .
Removal of silt and jungle clearance Main canal from ch.80.00 to 87.00 km of IBC
Removal of silt and jungle clearance from 10.00 to 18.00 km of IBC Dy-16
Removal of silt and jungle clearance Dy-15 of IBC from ch.0.00 to 10.00 km.
Special repairs to CC lining and box repair at 5.50km of lateral R-09 of Dy-22 under IBC
Special repairs to SR formation of Dy-22 in selected reaches from 2.00 to 13.00 km under IBC