Loading…
Loading…
1,361 results • Latest
Providing and fixing of glass panes of windows and repairing of plaster in MPPGCL colony quarters of PH-III (3x20MW) at Deolond.
Procurement of various types of Air cell with erection gasket O- ring set for conservator tank for different capacity of BHEL make Power transformer installed at1X500 MW at SGTPS, MPPGCL Birsinghpur.
Procurement of Spares material required for overhauling of one number Hayward Tyler Make 6.6 kV , 360KW Boiler Circulating Water BCW pump motor installed at Unit. No.5,500MW,at SGTPS, Birsinghpur
Procurement of Spares of Forbes Marshall make vibration monitoring system of turbine and boiler auxiliaries for Unit. No.5,500MW,at SGTPS, Birsinghpur
Procurement of spares of IYAPPAN make oil supply unit of HP- Bypass system of Unit no.5, 1x500 MW at SGTPS, MPPGCL, Birsinghpur
Work contract for Laying of 400 NB Recovery water pipeline (3000 Mtrs. Approx) from shaft at new ash dyke to target box near PH-II and PH-III, at SGTPS, MPPGCL, Birsinghpur
Annual work contract for providing assistance in punching of salary data store data expenditure in computer Sysbase system and preparation of monthly Annual account of this project as well as other entrusted from time to time at O o Joint Ditector
Work contract for RLA (Residual Life Assessment) study of Boiler Pressure Part and Corrosion Mapping of Boiler Tubes 1x210MW, ATPS, MPPGCL, CHACHAI.
Procurement of Spares of Bentaly-Nevada make vibration monitoring system of main turbine for Unit. No.5,500MW,at SGTPS, Birsinghpur
Procurement of spares for Auma Make Electrical Actuator for Unit. No.5 500MW at PH-III, SGTPS, Birsinghpur
Procurement of CAMILLE BAUER make programmable rail mount temperature transmitter for main turbine thermocouple of unit No. 5 500MW at SGTPS, MPPGCL, Birsinghpur.
Work Contract for spraying of weed killer solution and cleaning work in power house premises at ATPS MPPGCL Chachai.
Provide assistance for various day to day office work in office of S.E.(ET and I)-2,3 and S.E.(MM)-2,3 STPS Sarni.
Dismantling of Existing Shade and fabrication and Erection of fully covered shed for Electrical Site Store of CHP 4 STPS Sarni.
Online testing of 400KV and 220 KV equipment of PH-2,3,4 STPS MPPGCL Sarni.
Procurement of supply of Spares and servicing for MELLCON make blower heat reactivated air dryer installed at ASH handling plant of unit No. 5, 500MW at SGTPS, MPPGCL, Birsinghpur.
Procurement of CGL Make 245KV,800AMP Condenser Bushing for 40MVA, 220/ 6.9/ 11Kv station transformer at , SGTPS, Birsinghpur.
Supply, Installation and Commissioning of latest Opacity Dust analyser for measurement of dust concentration (MgNm3) in flue gases at ESP Outlets and STACK for unit no.5,500MWat SGTPS MPPGCL Birsinghpur.
Procurement of Spare of Mechanical Seal of Make FLOWSERVE for BFP Model No. FK6D30 and Booster Pump Model No. FA1B56 for AOH of Unit No. 10 and breakdown maintenance of Unit No 10 and 11 of PH-IV, STPS, Sarni.
Procurement of Various Size Thermocouple, Thermowell and RTD for Unit No. 1 to 4 of PH-I and PH-II at SGTPS, MPPGCL, Birsinghpur.
Procurement of Position Feedback Transmitter of HPBP System of Unit No. 1 and 2 at SGTPS, MPPGCL, Birsinghpur.
Procurement of 60W industrial well glass LED fitting, 100W Hi-bay LED light and different wattage LED street light complete fitting energy efficient with all necessary fixing arrangement for PHI II III and for colony street light poles at SGTPS,brs
Procurement of Coupling for fan and motor shaft of PA and FD fans Installed in Unit 5 1x500MW at SGTPS MPPGCL Birsinghpur
Biennial work contract for round the clock cleaning of CHP 210 MW consisting of conveyor 21 A/B to 28 A/B including rotary breaker, reject conveyor, belt feeders, tunnel junction towers floors, track hopper . . . . . etc. of 210 MW ATPS Chachai.
Biennial work contract for peon related work / causal office work of O/o S.E.(Services) ATPS, MPPGCL, Chachai.
Procurement of Return Roller Brackets, CSK Bolts and Nuts and Gear Coupling for 4x210 MW CHP I at SGTPS, MPPGCL, Birsinghpur.
Overhauling work of TG Auxiliaries in AOH of Unit No. 10 of PH-IV, STPS, Sarni
Procurement of Brake Drum having dia. 500 mm of Primary Thruster Brake for Wagon Tippler at SGTPS MPPGCL Birsinghpur.
Procurement of batteries for DG2 and UPS with buy back of old batteries of 2X600MW, SSTPP, MPPGCL, Dongalia
Electro-Hydraulic Convertor (EHC) assembly, for LPBP for unit no. 3 and 4 SGTPS, MPPGCL, Birsinghpur.
Procurement of spares of ESP control panels of unit no 3N4 SGTPS Birsinghpur
The work of Annual maintenance contract of Teledyne USA make Hydrogen Generation plant of PH 4STPS Sarni.
National Ambulance Code provided with Mono-block stretcher Nursing and First Aid Kit Oxygen Cylinder and with facilities as required for standard Ambulance Engine capacity 1900 CC and above Diesel Version
Complete repairing or replacement and testing of 630 kVA defective transformer at new ash dam of 500MW unit, at SGTPS, MPPGCL, Birsinghpur.
Procurement of different types of YIL make transmitters for various auto loop for YIL make DCS Centum XL system for PH-I and II SGTPS BRS
Hiring of shift vehicle as per NIT and tender schedule for Rajghat HPS MPPGCL Chanderi
Procurment of spares of Thermocouples and RTD for turbovisory for ATRS System for unit no.3 and 4 at SGTPS,MPPGCL,Birsinghpu
Supply,Installation and testing of complete new Thyristor Controlled Rectifier Control panel mandatory spares for H2 plant at SGTPS,MPPGCL,BRS
Procurement of chain pulley blocks, polystersling, D shackles and Eye bolt at 3x105 MW, THPS I, Sirmour
Work for removal and installation of new aluminum partition along with glass, complete false ceiling work and flooring work and miscellaneous civil work in Unit 1 to 4 for common control room at SGTPS, MPPGCL, Birsinghpur.
PROCUREMENT OF 4 WIRE PRESSURE TRANSMITTER FOR EAST ATRS SYSTEM OF UNIT NO. I and II, SGTPS, MPPGCL, BIRSINGHPUR.
Procurement of spare of 220V/1500AH Chhabi make battery charger spares for unit no. 3and4 and S/B battery of SGTPS Birsinghpur
Work of MOT Lube Oil filtration of Unit No. 10 During AOH and 11 of PH-IV, STPS, Sarni
Procurement of spares of Mekaster make goods lift and thereafter installation at 1x500 MW CHP, SGTPS, MPPGCL, Birsinghpur.
Supply and application of Air seal Material (Ceramic Fiber) in Boiler during AOH of Unit no. 10 STPS Sarni.
Procurement of 90 KW,415V,3 Phase 1485 RPM, Seal water Motor of Ash Handling Plant of PH-I,at SGTPS,MPPGCL, BRS.
Procurement of Large Size Power Cylinder for 4-Way Valve operation of Air Dryer of Unit no.I and II, at SGTPS, MPPGCL, Birsinghpur
Procurement of LP TURBINE FREE STANDING BLADES of 7th and 8th stage of BHEL make KWU TURBINE SET of 250 MW Unit No. 10 and 11, PH-IV, STPS, Sarni.
Procurement of Spares for Coal Burners of Unit no. 3 and 4, SGTPS, Birsinghpur MW unit , SGTPS, MPPGCL, Birsinghpur.
Procurement of Air Port Ring Asembly and body liner for Bowl Mill XRP - 883 at 210 MW, ATPS, MPPGCL, Chachai