Construction of Proposed seven storied building with two tire basement for Regional Cancer Centre within compound of Medical College Hospital Kolkata SITC of 415V 3 Ph 750 KVA DG Set
Construction of 2B Plus G Plus 6 storied Regional Cancer Center within the compound of Medical College Hospital Kolkata Electrical Installation Work SITC of UPS
EI work in different sites on the basis of emergency requirement of Power plugs separate plugs etc Under the jurisdiction of JE MCH electrical section Kolkata
SITC of Concealed Split AC machines in Biochemistry Room at 2nd Floor of RIO Bldg Kolkata Electrical Installation allied AC work
Strengthening of power back up system by replacement of old Inverter and battery installed at different buildings of Kolkata Medical College Hospital SF of battery at critical card units
Strengthening of power back up system by replacement of old Inverter UPS and battery installed at different buildings of Kolkata Medical College Hospital