Loading…
Loading…
380 results • Latest
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), PVC Insulated Copper Cable Single Core and Multi Core Circular Sheathed with Rigid Conductor (V2) ISI Marked To IS 694 (Q2) (3 (3 ))
Supplying, Installation, Testing and Commissioning of 11KV substation with standby transformer for Health Centre, Main Guest House, Girls Hostel 1 and 2 including providing HT LT cabling and augmentation of electrical wiring of Health Centre in P.U,
E.I. work/Providing Shed (foundations) for placing the HT/LT equipment for the work Augmentation of Electrical system at Main Pump House (Replacement of Main Panel, Starter panel with Drive panel for smooth operation) in PU Campus Sector 14 Chandigar
Rotational Moulded Polyethylene Water Storage Tanks (V3)
Re carpeting of Roads and Parking other than houses and Hostels in Panjab University Campus, Sector-14, Chandigarh
Reconstruction of the front yard and driveway of E-1 type residencies in P.U. Campus, Sector-14, Chandigarh.
Replacement of Garage Doors in Panjab University, Chandigarh
Providing and Fixing Polycarbonate sheet roofing on roof top and Addition/Alteration and Merging of Rooms for Department of Biotechnology of BMS Block-1, in P.U. South Campus, sector-25, Chandigarh.
Renovation of Inner Wall facing towards the main corridor of washrooms of block no. 3 in Boys Hostel No.1 in Panjab University Campus, Sector-14, Chandigarh.
Remaining work for SITC of fire fighting system for Multipurpose Auditorium in PU South Campus Sector 25 Chandigarh
Construction of seven storey boys hostel no.9 (ground floor to 6th floor) in PU South Campus Sector 25 Chandigarh
Motor Insurance Service - 4 Wheeler; Above 2500 CC
Rewiring of Design and Innovation Centre (D.I.C) Laboratory at U.I.E.T in P.U South Campus, Sector-25, Chandigarh
Rewiring of Server Room at U.I.E.T in P.U South Campus, Sector-25, Chandigarh
Rewiring of N.S.S Department (National Service Scheme) at Chemical Department in P.U Campus, Sector-14, Chandigarh
Shifting of Electric wires along the bathroom wall in Boys Hostel No.7, P.U. Campus, Sector 14, Chandigarh
Carry out Miscellaneous Minor electrical works in departments hostels in Panjab University Campus, Sector 14 and 25, Chandigarh
Re-carpeting of Roads and Parkings of Alumni House to Boys Hostel No. 8 road, UIAMS road/parking, BMS Block I and II in Panjab University South Campus, Sector 25, Chandigarh.
Repair of roofs of other buildings (Other than houses and hostels) of Zoology Department in P.U. Campus, Sector-14, Chandigarh.
Reconstruction of Pathways of D type houses in P.U. Campus, Sector-14, Chandigarh.
Construction of front yard and driveways of C-type houses in P.U. Campus, Sector-14, Chandigarh.
Cleaning of backlanes in residential area, Sector-14, Panjab University, Chandigarh
FISHER SCIENTIFIC Liquid Labolene, Size 5 liter in Plastic, FISHER SCIENTIFIC Liquid Labolene, Size 5 liter in Plastic buckets
Construction of Footpath behind behind Arts Block-I and II to access Arts Block-V and HUT-14 Canteen in Panjab University Campus, Sec-14, Chandigarh.
Construction of two wheeler parking for U.I.H.T.M in P.U. Campus, Sector-14, Chandigarh.
SHARP OEM Toner Cartridge Manufactured by SHARP BUSINESS, SHARP OEM Toner Cartridge Manufactured by SHARP BUSINESS SYSTEMS (INDIA) PRIVATE LIMITED
mc brown Silver Grey Colored Steel Shelving Cabinets
Flooring tiles at PU-ISSER of Guru Teg Bahadur Building in P.U. Campus Sector-14 Chandigarh.
Roof Treatment of S.B.I. Building(Main Branch) in Panjab University Campus, Sector-14, Chandigarh.
Providing Road Gullies in Front of C-Type-113-132 in Panjab University Sector-14, Chandigarh.
L C PRINTS--LANDMARK COMPUTER PRINTS 2.342 kilogram Ream of, L C PRINTS--LANDMARK COMPUTER PRINTS 2.342 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Motor Insurance Service - 4 Wheeler; 1001 to 1500 CC
Renovation of Inner Wall facing towards the main corridor of washrooms of block no. 3 in Boys Hostel No.1 in Panjab University Campus, Sector-14, Chandigarh.
Cleaning of Over Head Water Tank in all residential areas in Panjab University South Campus, Sector -25, Chandigarh.
Repair of Roof Water Proofing Treatment of Gymnasium hall in Department of Physical Education and Sports in P.U Campus Sector - 14 Chandigarh.
Providing and Fixing Steel mesh work in Department of Psychology, P.U. Campus, Sector-14, Chandigarh.
Oddy Transparent Polypropylene Tape of length 100 meter
NIPPON Transparent Polypropylene Tape of length 50 meter
KYOCERa A4 and Legal Monochrome (Black) Laser Computer, KYOCERa A4 and Legal Monochrome (Black) Laser Computer Printer
KYOCERa Electrophotography/Xerography (Laser/LED) Monochrome, KYOCERa Electrophotography/Xerography (Laser/LED) Monochrome (Black) A4 and Legal Size Multifunction Printer (MFP)
Shifting of Sewer line Near Chemistry Department at P.U. campus Sec-14 Chandigarh.
Repair of Roof of Department of Chemical Engineering and Technology in P.U. Campus, Sector 14, Chandigarh.
Renovation of Physical Research Lab No.2 on 2nd Floor of Department of Chemistry in P.U. Campus Sector-14, Chandigarh.
Annual Maintenance Contract for Cleaning of Old Sewerline in P.U. Campus, Sector-14 and 25, Chandigarh.
SERVOKON 5 KVA Automatic Line Voltage Corrector (Stabilizer)
BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity, BLUE STAR 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton
BLUE STAR 2 Star Wall Mount Type Split Air Conditioner of Capacity, BLUE STAR 2 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.8 Ton - 2.2 Ton
Unbranded 20 Litre BITUMEN PRIMER FOR USE IN WATERPROOFING, Unbranded 20 Litre BITUMEN PRIMER FOR USE IN WATERPROOFING AND DAMP-PROOFING