Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,441 live1,492 closing this weekmost from PHE and Haryana Government
2,441 results • Latest
Hiring of Diesel Vehicle Motor Cab/Maxi Cab with Engine Capacity More than 2000 CC with (Air Condition) for Executive Engineer, Alipurduar Division, P.H.E. Dte. (12 months)
CONSTRUCTION OF 1 No OHSR OF 200KL CAPACITY ALONG WITH PUMP HOUSE AT JAIN TEMPLE, BARA PADAMPURA UNDER JURISDICTION OF PHED SUB DIVISION CHAKSU
Bore Well at Manzpora Bonpora near House of Shahzad Mantoo and others Block Qaimoh, Bachroo in District Kulgam.
CONSTRUCTION OF 1 No OHSR OF 200KL CAPACITY ALONG WITH PUMP HOUSE AT JAIN TEMPLE, BARA PADAMPURA UNDER JURISDICTION OF PHED SUB DIVISION CHAKSU
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe, Providing Functional Household Tap Connection (FHTC) for KANTHALANPUR piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division,
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe,Providing Functional Household Tap Connection (FHTC) , Boundary wall,Aproach Raod at HW and 2nd TW site in for JIGIN piped Water Supply Scheme of Gazole
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe, Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of PARAHAR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of EMAMNAGAR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Road Restoration of BANGURA Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte. in the district of Malda. (2nd Call)
Design, Supplying. Fabrication, Erection, Commissioning including 3 (three) months Trial Run of 70m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head work site and Augmentat
Design, Supplying. Fabrication, Erection, Commissioning including 3 (three) months Trial Run of 100 m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash CHANCHAL ZONE-II Water Supply Scheme of Chanc
Sinking of 2 No. 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of BABUPUR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of DAHIL PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Design, Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 30m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room, backwash water disposal at AIHO ZONE-II Water Supply Scheme of
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of PARAIL PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Construction of Pump House, Boundary wall and allied works of ARAZI JALSA PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of HATNAGAR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Design, Supplying. Fabrication, Erection, Commissioning including 3 (three) months Trial Run of 135m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room , backwash water disposal at head work site under KUSHIDA
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of RAHIMPUR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of SAIDPUR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall, Providing Common Manifold and allied works of JAMALPUR PWSS under Habibpur Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd
Construction Approach Road, Internal Road, Land Development at Head Work, 2nd Tube well Site, Laying of Parallel/Dedicated Pipeline and Providing Balance FHTC of NASIPUR PWSS under Ratua-II Block under Malda Division, PHE Dte, Govt. of West Bengal.
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall, Laying of Parallel/ Dedicated Pipeline for better Functionality and allied works of BHADAR PWSS under Gazole Block under Malda Division, P
Construction of Machine Drilled Hand Pump Operated bore well at Chopan Mohalla Panchayat Halqa Chewa-B in District Bandipora.
Augmentation of Boundary wall of Head Work Site of Gazole Zone-II Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Construction of Boundary Wall at 2nd Tube Well site of Nasipur Water Supply Scheme under Ratua-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m3 hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of RAJARAMCHAKWater S
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Paschim Bhagabanpur Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Operational Charges of reporting of water quality test results in State Water Quality and IMIS both for monitoring water safety status of rural drinking water sources in Malda under Malda Division, PHE Dte. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Sadlichak Water Supply Scheme of Ha
Construction of Boundary wall of 2nd Tube Well Site of Gazole Zone-I Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 20 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 3 of Gun Sankrul Wate
Work of Narmada Based Water Supply Project for 163 Villages of Dhorimanna and Chouhtan Block, Distt. Barmer (Package CP-03, Chouhtan-1 under JICA funded Rajasthan Rural Water Supply and Fluorosis Mitigation Project Phase II on SPR basis with one-year
Sinking of 200mm (all through) Big dia. Tube Well of 170 Mtr. Deep , Construction of Pump House, Interconnection and Laying of Dedicated/Parallel Pipe Line for improvement of FHTC functionality for FATEPUR Water Supply Scheme at Gazole Block of Malda
Land Development, Approach Road, Boundary Wall, Improvement of Pump house for MAHIL Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (3rd Call)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (3rd Call)
Dedicated Pipe laying for better Functionality and Providing Balance FHTC for MAHIL Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte. Govt. of West Bengal, (3rd Call)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe an providing FHTC and Construction of Boundary Wall, Earth filling and Approach road at 3rd and 4th Tubewell Site for Kadirpur PWSS in Habibpur Dev. Block
Sinking of additional Tube Well to avoid crossing State boundary along with allied works like Interconnection, Construction of Pump House of WARI Piped Water Supply Scheme under Harishchandrapur-I Block under Malda Division, PHE Dte, Govt. of West B
Sinking of Additional Source to resolve tail end pressure along with allied works like Interconnection and Laying distribution pipeline, Construction of Pump House, Construction of KHARBA Piped Water Supply Scheme at Chanchal-I Block of Malda Distric
Sinking of additional Tube Well to avoid crossing State boundary along with allied works like Interconnection, Construction of Pump House of SWARUPGANJ Piped Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte, Govt. of West Ben
Sinking of Big Dia. Tube well, Inter connection beteween TW Existing Pipe line, Construction of Pump House of BETAHAL Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd
Laying of Parallel/ Dedicated Pipeline, Providing Common Manifold Augmentation of OHR and allied work for better Functionality at SAMBALPUR Piped Water Supply Scheme at Ratua-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Ben
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of TALPUKUR Piped Water Supply Scheme under Habibpur Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call).
Sinking of 200 mm (all through) Big Dia Tube Well of 250 m Deep at 3rd Tube Well Source, Interconnection and Laying of Parallel/ Dedicated Pipeline, Construction of Pump House Construction of Boundary Wall under SERBABAR BALARAMPUR Piped Water Supp
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 90 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Head Work Site, Laying of Parallel/
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 2 (Two) nos 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at KADIRPUR Water Supply Schem
Restoration of Road at Ashwinpur Mouza of Paschim Bhagabanpur Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call).
Laying of Dedicated /Parallel and Providing Balance FHTC of DAKSHIN BHAKURIA Piped Water Supply Scheme at Harishchandrapur-II Dev. Block in the District of MaldaunderMalda Division, PHE Dte. (2nd Call).