Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
2,441 live1,492 closing this weekmost from PHE and Haryana Government
2,441 results • Latest
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 80 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at ALAL ZONE-I Water Supply Scheme o
Laying of Dedicated pipe line for improvement of functionality and Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135m3/hr. capacity Pressure type IRON ELIMINATION Plant with backwash water disp
Design, Fabrication, Supplying, Installing, Commissioning and 3 (three) months Trial Run of 45 m3 hr. capacity of Iron Elimination Plant (Pressure Type) with provision of polishing unit and Construction of 3.60 mtr. X 3.00 mtr. Blower room of Head Wo
Construction of Boundary wall of 2nd Tube Well Site,Road restoration, Rectification of FHTC and Installation of Functional Household Tap Connection of JATRADANGA Piped Water Supply Scheme at Old Malda Dev. Block in the District Malda under Malda Divi
Laying of Parallel/ Dedicated Pipeline for better Functionality at Durgapur Gobindapur Area of JOTGOPAL Piped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call).
Augmentation of Water Supply Scheme Chatterhama by way of construction of Additional Bore Well.
Construction of Production Bore Well at Madina Sanzwatroo District Pulwama.
Construction of 200mm dia Production Well by ODEX Method at Kasnard Pannard Sangnard Well No. 2 District Anantnag.
Construction of Production Bore Well at Kharbatpora Ratnipora District Pulwama.
Construction of 01 No. 125mm dia, 90 mtr deep Machine Drilled Tube Well at Astanpora Brein District Srinagar.
Construction of 125 mm dia Machine Drilled hand Pump well near house of Nazir Ahmad Sheikh and others at Sheikhpora Tulail in district Bandipora.
Installation of Bore well along with submersible pumping unit and allied fittings for SWM Plant at MC Charisharief in District Budgam.
Construction of 200 mm dia Production well at by DTH/ODEX method of drilling at Wullarhama (Wullarhama, Dachnipora in District Anantnag).
Construction of Borewell at Nagbal (Vail Nagbal, K Pora in District Anantnag).
Construction of Bore well at District Jail Anantnag.
Construction of 125 mm dia machine drilled Bore well including allied accessories in the premises of Divisional Office (Executive Engineer Civil Investigation and Design Division PDC Sopore) for drinking water purpose in District Baramulla
Construction and Harnessing of 01 No. 125 mm dia, machine drilled Bore-well in the premises of Mechanical and Hospital Division Baramulla.
Construction of hand pump/Bore Well near Bajard Mohalla Jewan Shab Ladhoo Pampore Pulwama along providing fitting of Sub. Pump and allied works (110m Depth).
Installation of Bore Well near Tantray House at Check Saidpora Shopian
Construction of Bore Well with allied works at Lane 04 Friends Colony Humhama District Budgam.
Construction of Gravel Packed Production Tube Well at Water Supply Scheme Arakhashi Pora District Anantnag.
Construction of Gravel Packed Production Tube Wells at Nundresh Colony Gabarpora, Pulwama.
Detailed NIT for Balance Work of Retrofitting Works of RWSS of 97 villages and Dhanies of Nawa Tehsil under JJM in rural area of Nawa Tehsil with Ten Years Operation and Maintenance (up to VTC) excluding One Year DLP
Annual Rate Contract for Providing, Laying, Jointing, testing and commissioning of pipe line and allied works at various schemes under jurisdiction of Division Baran, DISTT. BARAN
Construction and commissioning of 200mm dia tube well and Pipe line in Village Ramgarh G.P. Ramgarh Tehsil Kishanganj District BaranPipe line in Village Ramgarh G.P. Ramgarh Tehsil Kishanganj District Baran
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District Pkg1
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District from JakhamDam under JJM Pkg2
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM
Work for Construction of Intake well inside Chambal River including Approach Bridge construction of RWR including all works required for inlet inside RWR outlet system from RWR to outlet chamber WTP CWR RWPH and allied works Package 1 under JJM
Work for Construction of Water Treatment Plants CWRs and CWPHs Near WTPs Clear Water transmission main From WTP various IPSs Laying of Rising mains to different ESRs Construction of ESRs Distribution system in villages providing FHTCs Including
Work for Construction of Water Treatment Plants, CWRs &ampamp CWPHs Near WTPs Clear Water transmission main From WTP various IPSs, Laying of Rising mains to different ESRs,etc Kaliteer Water Supply Project on Hybrid Annuity Model (HAM).
Work for Const. of Intake well inside Chambal River including Approach Bridge, const. of RWR including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, WTP, CWR, RWPH and allied works Package-1, Hybrid Annuity Model
Work of Cons. of CWR and Block CWPH at various locations for clusters, laying of transfer main from block PS to block CPS, rising main from block CPS to Block ESRs, construction of ESRs, laying of cluster distribution mains under Hybrid Annuity Model
Work of “Construction of Intermediate CWPH at Kotra (Baseri), laying of Clear Water transmission main From Kotra to Naroli, Nadbai via junction 2 at Naroli, IPS Nadbai, Nagar, Ramgarh, Kishangarhbas Tijara (Jairolı) under Hybrid Annuity Model
Work for strengthening of Intake well inside Chambal River, construction of approach Bridge, construction of RWR including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, WTP, Construction of CWR and Allied works
work of Chambal Sawai Madhopur Nadoti Water Supply Project CSNP Package3 for providing surface water to the 1424 villages of Karauli and Sawai Madhopur District through FHTCs under Jal Jeevan Mission with 10 years O and M
Work for Construction of Intermediate CWPH at all IPSs CPSs, laying of Clear Water transmission main From Mandrail WTP to Block CPS/IPS all pumping stations up to Sawai Madhopur. Construction of CWRs and Intermediate Pump Houses and Off takes. Con
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District from JakhamDam under JJM Pkg2
1473vill ofChittorgarh Pratapgarh Rajsamand UdaipurDistrict Pkg1 WTP IPS1toIPS6 CPS01to19including complete works of theseCPS CD VDCivilworksfor93vill ofChhotiSadri block ofPratapgarh 707vill of 7blocks of Chittorgarhdistrict underJJMwith OandM 10Y