Loading…
Loading…
3,496 live1,819 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,496 results • Latest
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of DAHIL PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Design, Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 30m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room, backwash water disposal at AIHO ZONE-II Water Supply Scheme of
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of PARAIL PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Construction of Pump House, Boundary wall and allied works of ARAZI JALSA PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of HATNAGAR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Design, Supplying. Fabrication, Erection, Commissioning including 3 (three) months Trial Run of 135m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room , backwash water disposal at head work site under KUSHIDA
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House and allied works of RAHIMPUR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall and allied works of SAIDPUR PWSS under Gazole Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall, Providing Common Manifold and allied works of JAMALPUR PWSS under Habibpur Block under Malda Division, PHE Dte, Govt. of West Bengal. (2nd
Construction Approach Road, Internal Road, Land Development at Head Work, 2nd Tube well Site, Laying of Parallel/Dedicated Pipeline and Providing Balance FHTC of NASIPUR PWSS under Ratua-II Block under Malda Division, PHE Dte, Govt. of West Bengal.
Sinking of 200mm (all through) Big dia. Tube Well, Interconnection, Construction of Pump House, Boundary wall, Laying of Parallel/ Dedicated Pipeline for better Functionality and allied works of BHADAR PWSS under Gazole Block under Malda Division, P
Construction of Tube Wells at Sheikh Mohalla near House of Farooq Ahmad Bhat at Dudwan Ward No. 01 at SK Bala in District Bandipora.
Construction of 125 mm Bore Well with submersible pump unit and allied works at Chadoora in District Budgam.
Construction of Machine Drilled Hand Pump Operated bore well at Chopan Mohalla Panchayat Halqa Chewa-B in District Bandipora.
Installation of Bore well along with submersible pump and allied fittings at Peace Enclave at Sheikhpora Panchayat Budgam in District Budgam.
Installation of Bore well along for drinking water supply at Hamdan residency Dumail Suzaith Goripora NHO Tal Panchayat Suzaith Block Narbal in District Budgam.
Payment of remuneration for engagement of 28 Nos personnel (Sub-District Chemist, Sub- District Bacteriologist, Sub-District Lab-Assistant, Sub-District Sampling Assistant, Sub- District Lab attendant and District Chemist, ....
Operation and Guarding of Pumping machinery and others at Paikpara WSS PH NO - I of Nalhati-I Block.
Operation and Guarding of Pumping machinery and others at Paikpara WSS PH NO - II of Nalhati-I Block.
Operation and guarding of Pumping machinery and others at Dhitora Piped Water Supply Scheme PH No I of Murarai - IBlock
Part I: Fixed Operation of piped water supply schemes (PWS, WLS (Quality affected/NQ) by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of water supply schemes (PWS, WLS Quality affected/NQ ) & PWS i/c the cost of chemicals, overhauling of filter media and related apputenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. in Blocks:- 13 No. of schemes: 425 Nos. WLS(Non Quality): 334 Nos., WLS (Quality):- 83 Nos., PWS:- 8 Nos.
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 125 MM DIA. HANDPUMP AND SINGLE PHASE POWER PUMP BOREWELL WITH 2 YEAR DEFECT LIABILITY IN DIVISION FALNA
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 125 MM DIA. HANDPUMP AND SINGLE PHASE POWER PUMP BOREWELL WITH 2 YEAR DEFECT LIABILITY IN DIVISION SOJAT
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 125 MM DIA. HANDPUMP AND SINGLE PHASE POWER PUMP BOREWELL WITH 2 YEAR DEFECT LIABILITY IN DIVISION PALI
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 200 MM DIA TUBE WELLS WITH 5 YEAR O AND M INCLUDING 2 YEARS DEFECT LIABILITY PERIOD UNDER DIVISION FALNA
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 200 MM DIA TUBE WELLS WITH 5 YEAR O AND M INCLUDING 2 YEARS DEFECT LIABILITY PERIOD UNDER DIVISION PALI
ANNUAL RATE CONTRACT FOR CONSTRUCTION AND COMMISSIONING OF 200 MM DIA TUBE WELLS WITH 5 YEAR O AND M INCLUDING 2 YEARS DEFECT LIABILITY PERIOD UNDER DIVISION SOJAT
Augmentation of Boundary wall of Head Work Site of Gazole Zone-II Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Construction of Boundary Wall at 2nd Tube Well site of Nasipur Water Supply Scheme under Ratua-II Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m3 hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of RAJARAMCHAKWater S
Providing Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM) at Paschim Bhagabanpur Water Supply Scheme under Chanchal-I Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Operational Charges of reporting of water quality test results in State Water Quality and IMIS both for monitoring water safety status of rural drinking water sources in Malda under Malda Division, PHE Dte. (3rd Call)
Construction of Boundary Wall at Head Work site of Dilalbati Water Supply Scheme under Gazole Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Sadlichak Water Supply Scheme of Ha
Construction of Boundary wall of 2nd Tube Well Site of Gazole Zone-I Pipe Water Supply Scheme at Gazole Dev. Block under Malda Division, PHE Dte. in the district of Malda. (3rd Call)
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 20 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 3 of Gun Sankrul Wate
Work of Narmada Based Water Supply Project for 163 Villages of Dhorimanna and Chouhtan Block, Distt. Barmer (Package CP-03, Chouhtan-1 under JICA funded Rajasthan Rural Water Supply and Fluorosis Mitigation Project Phase II on SPR basis with one-year
Replacement of luminaries with rectification of wiring arrangement and Providing of coagulant at WTP of Jangipur surface Water based water supply scheme under MEDB,PHE Dte. in Murshidabad.
Day to Day Operation and Maintenance of 4.70 MLD Water Treatment Plant of Surface waetr based water supply scheme of Jiaganj-Azimganj Municipality Azimganj portion and in adjoining mouzas of Mukundobag Gram panchayat under Murshidabad Division, P.H.E
Annual Operation and Maintenance of distribution system and rising main, pipeline, FHTC AC/CI/DI/UPVC/HDPE of JAULIA PWSS, Ujunia sisua PWSS, Matua PWSS at Bharatpur II Block of Kandi Sub-Division under Murshidabad Division, PHE Dte. for 1(one) year
Installation of Community Purification Plant i.e .CPP unit Water Supply arrangement for District Library with Solar Power connection under Berhampore Sub Division under Murshidabad Division , P.H.E. Dte. in the District of Murshidabad.
Repair of Anaerobic Pond and replacement of Outlet pipe with Culvert at Indrapastha Gap of under Berhampore Sub Division, Murshidabad Division P.H.E.Dte.
Operation and Maintenance for Arsenic cum Iron Removal Plant of Tenkaraipur PWSS Capacity 120 m3/hr under Islampur Sub-Division of Murshidabad Division P.H.E. Dte. for 12 Twelve Months.
Refilling of sand layers and existing gravel after washing along with allied works of AIRP at Tenkaraipur Capacity 120.00 m3/hr Water Supply Scheme Raninagar-I Block of Islampur Sub-Division under Murshidabad Division, PHE Dte.
Day to day Operation , maintenance of 20 MGD capacity Water Treatment Plant (Phase-II) and other ancillary works for 04 months (period from 01/12/2026 to 31/03/2027) of NTK project under New Town Kolkata W/S. Division-I, P.H.E. Dte.
Repairing and rectification of existing transformer at CWR site of Parsala W/S Scheme under Bankura Mechanical Division, PHE Dte. Block Simlapal, Dist Bankura
Repairing and rectification of 315KVA,11/0.433KV transformer at CWR site of Pathardoba W/S Scheme under Bankura Mechanical Division, PHE Dte. Block Simlapal, Dist Bankura.