Loading…
Loading…
3,496 live1,819 closing this weekmost from PHE and Chief Engineer (Special Project) PHED, Jaipur
3,496 results • Latest
Construction of Boundary wall, Service Road, Land filling at 2nd Tube well, 3rd Tube Well site for HARISANKARPUR PWSS under MAGRAHAT PURBA G.P within Mograhat-II Block for Augmentation of Surface Water Based Water Supply Scheme in the Arsenic affecte
Upgradtion and renovation of 3 25 MLD Unit II STP at Baldev Nagar under JAL HI AMRIT initative of AMRUT
Augmentation of drinking water facilities to Gujar Basti Check Sangri Khonmoh by way of bore well including pipe network pump station and other related works.
Construction of 01 No. 125mm dia, 90 mtr deep Machine Drilled Tube Well at Astanpora Brein District Srinagar.
Providing, Laying and Jointing of Pipeline for Improvement of Distribution System in Ward No 14 near Nangal Flyover Kalwar Road Jhotwara under City Division IV (North) Jaipur
AUGMENTATION WATER SUPPLY SYSTEM IN VILLAGE KHARAK KALAN and KHURD Construction of STP MPS and IPS Laying of Sewer Line and Construction of Manholes
Construction of 125 mm dia Machine Drilled hand Pump well near house of Nazir Ahmad Sheikh and others at Sheikhpora Tulail in district Bandipora.
Work of Providing Laying and Jointing of DI and HDPE Pipe line Shifting at Ajay Marg Sector 07 Pratp Nagar under the Jurisdiction of City Sub Dn XII S Pratap Nagar under City Div-IV (S) jaipur (Deposit work).
Survey, Investigation, Design and Construction of piped water supply schemes (Balance Work) of 04 villages namely 1 Budhani, 2 Tamcharu, 3 Mangrol, 4 Gora of Block Makhan Nagar Distt. Narmadapuram
Construction of water tank on existing spring for Primary school Zarit Sharief Jabber. (under Distt. Capex)
Improvement Strengthening Extension of pipe Network at Ward No. 7,8,9 and 10. (under Distt. Capex)
Strengthening Renovation of outlived 10000 Glns GSR at Rajnagar Lower under WSS Rajnagar Lower. (under Distt. Capex)
Strengthening Renovation of outlived 20000 Glns Collection Tank at Sokar under WSS Panihad. (under Distt. Capex)
Improvement and Strengthening of old Gravity for providing water supply to Gujjar Naka under WSS Delheri. (under Distt. Capex)
Providing Laying of R main 65 mm Dia from Newly Drilled B Well under District Capex to GSR at Old Bus Stand Rajouri.(under Distt. Capex)
Construction of collection tank at Ward No.02 Adryian Mohalla Saim Samat. (under Distt. Capex)
Improvement Strengthening Extension of pipe Network at Ward No. 4,5,6 and 16.(under Distt. Capex)
Improvement Strengthening Extension of pipe Network at Ward No. 1,2,3 and 17.(under Distt. Capex)
Installation of Bore well along with submersible pumping unit and allied fittings for SWM Plant at MC Charisharief in District Budgam.
Construction of community Borewell at Sikh Kanihama (Block Tangmarg in District Baramulla).
Repair to Departmental Inspection Vehicles, Yodha and Boloero, by way of providing and fitting of After Market Heater/ Blower for inspection Vehicles of Ground Water Division Srinagar
Construction of 200 mm dia Production well at by DTH/ODEX method of drilling at Wullarhama (Wullarhama, Dachnipora in District Anantnag).
Hiring of Maxi cab (Non- Air Condition, Bharat Stage III on or after 01/05/2008 with Diesel / LPG/CNG Engine/EV) in perfect good running condition of performing a very long journey and should be covered without any trouble on daily hire basis
Construction of 01 No. 125mm Dia Machine Drilled Hand Pump Well at New Colony Kahadoora Panchayat Halqa Venkura in District Baramulla.
Construction of Borewell at Nagbal (Vail Nagbal, K Pora in District Anantnag).
Hiring of services of Insurance Brokers for Insurance Policy of 60MW Giri, 120MW SVP Bhaba, 126MW Larji and 66MW Bassi HEP as well as Settlement of Insurance claims and other insurance related matters
Repairing and Replacement of Damaged Pipeline , River Crossing and Road crossing at Various portion for uncovered Area of Paschim Khairbari PWSS under Alipurduar Division, PHE Dte.
Construction of Bore well at District Jail Anantnag
Construction of 01 No. 125mm Dia Machine Drilled Hand Pump Well near Masjid-e- Jamia Chopan Mohalla Kanispora Baramulla.
Construction of 03 No. of Borewells at Muftibagh Gandtal and Barji in District Srinagar.
Construction of hand pump/Bore Well near Bajard Mohalla Jewan Shab Ladhoo Pampore Pulwama along providing fitting of Sub. Pump and allied works (110m Depth).
Installation of Bore Well near Tantray House at Check Saidpora Shopian
Construction of Bore Well with allied works at Lane 04 Friends Colony Humhama District Budgam.
Construction of Gravel Packed Production Tube Well at Water Supply Scheme Arakhashi Pora District Anantnag.
AMC for the 550-200 and 575-225 Diesel Powered Screw Air (Elgi) Compressors.
Construction of Gravel Packed Production Tube Wells at Nundresh Colony Gabarpora, Pulwama.
Repair to the Departmental Vehicles and Compressors including POL by way of M. Oil Change to Elgi-Compressor 575-200 of PHE Ground Division Srinagar
As per TD
Annual Rate Contract for Providing, Laying, Jointing, testing and commissioning of pipe line and allied works at various schemes under jurisdiction of Division Baran, DISTT. BARAN
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District Pkg1
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District from JakhamDam under JJM Pkg2
Work of Construction of Intermediate CWPH at Kotra Baseri laying of Clear Water transmission main From Kotra to Naroli Nadbai via junction 2 at Naroli IPS Nadbai Nagar Ramgarh Kishangarhbas Tijara Jairoli and Bhiwadi based on HAM model under JJM
Work of construction of CWR and Block CWPH at various locations for clusters laying of transfer main from block PS to block CPS rising main from block CPS to Block ESRs, construction of ESRs laying of cluster distribution mains CABP Pck 3 under JJM
Work for Construction of Intake well inside Chambal River including Approach Bridge construction of RWR including all works required for inlet inside RWR outlet system from RWR to outlet chamber WTP CWR RWPH and allied works Package 1 under JJM
Work for Construction of Water Treatment Plants CWRs and CWPHs Near WTPs Clear Water transmission main From WTP various IPSs Laying of Rising mains to different ESRs Construction of ESRs Distribution system in villages providing FHTCs Including