Loading…
Loading…
99,623 results • Latest
Electrification work of New Advance Mortuary complex in MDM Hospital Jodhpur
SITC of Air Conditioning machines along with necessary Electrical works at the Office room of Law Cell of Judicial Department, Block 4, 2nd Floor of Writers Buildings.
Strengthing of Katni Gumla Chandil N.H.-43 to Mairtola road Length 2.00 Km
Patch repairing work of KBMH Road from 16.00 kmp to 18.00 kmp in different stretches under Barasat Division, PWD in the district of North 24 Parganas during the year 2022-23.
Emergent sanitary plumbing and allied works throughout the Officers Quarters at 8 No. Anil Roy Road Kolkata 29 during the year 2025 26
SITC of AC Machine and other Allied Electrical Works of two faculty rooms and 1st year class room of GNM students at 2nd floor of Nursing Hostel under the Principal Nursing Office at NRSMCH Kolkata
Strengthing of Patpariyatola Approch, Payari Approch road and Length 2.20 Km
Emergent repair and renovation work in the office of at ROB Building at 76 Dr. Deodar Rahaman Road Kolkata 33 during the year 2025 2026.
Round the clock engagement of one number semi skill attendant for Fire protection system of J R Dhar S D Hospital, Bongaon in the district of 24 Pgs (N) to operate the system from Fire Pump House during day to day maintenance including all charges
Construction of office cum Residence of H.E.O. at PCDO Madhan Distt. Mandi HP. SH Providing E.I. therein
Repairing of Fire Detection System of Lalan Mancha at the campus of Flok and Tribal caltural Centre Mukundapur Kolkata
Renewal of Khurrampur Bhamori Road to Nyoli Link Road Under General Repair 2026-27
Providing and fixing aluminium framed and granite top counters antibacterial PVC flooring anti bacterial false ceiling Other misc works at GB Pant Hospital
Repair of pot holes and patches in RD 45/500 to 53/00)
Tollygunge Emergent Force Line---- Repair and painting work of Quarter No M-03
Construction of Ambedkar Center for Excellence under Bongaon Sub-Division PWD during the year 2021-22. - Balance ancillary works.
Supply of maintenance materials for day to day electrical maintenance work for different blocks of Writers Buildings, Kolkata.
Construction of CC Road in Tantoti village (Atal Pragati Path)
STMC work on Anuppur Jaithari Venkatnagar road MDR Length 40.60 Km, Lahsuna Pondi VR road Length 3.40 Km, Beed to Umariya road Length 2.00 Km Lapta Chorbhatti road Length 7.50 Km, Mediyaras aApproach road Length 7.50Km total Length 61.00Km
Electrical Installation works for Installation of Medical Gas Pipeline System (MGPS) at Birpara SGH in the Dist. Of Alipurduar.
GENERAL-PWD Rest House, Thiruvananthapuram- Maintenance and Operation of Sound System at PWD Rest House, Thiruvananthapuram for a period of one year-General Electronics Work
Renewal of Sisaiya to Rani Ki Gotiya Link Road Under General Repair 2026-27
Supply Installation Testing Commissioning of 3 Nos modular Cold room Walk In Cooler for blood Bank at NRS Medical College and Hospital Kolkata Electrical Work
Tollygunge Emergent Force Line---- Repair and maintenance work of Govt. quarter no D-6
Refilling and Supplying Installation Testing and Commissioning of Fire Extinguisher at Dr. J.R. Dhar Sub-Divisional Hospital under Bongaon Sub-Division, PWD during the year 2023-24
A/R and M/O State Highway under RCD, APWD, Wimberly Gunj during 2025-26. S.W Outsourcing of Labour for day to day Maintenance works for various Sections.
Setting up of chambers and cubical for District Election Office, Kolkata North for upcoming Parliamentary General Election, 2024 at southern and middle portion of Mezzanine Floor of Jessop Building, 63, N.S. Road, Kolkata-700001
Shifting of the office of the WB Seed Crpn. Ltd proposed to be shifted from 6 G.C Avenue 5th fl, Kol-13 to the 3rd fl. of Bio-Control Lab.Buld at the premises of State Agriculture Research Institute-Dismantling and reinstallation of AC system.
Construction of RCC Hume Pipe Culvert at RD. 0/435, 0/840 and 1/200).
STMC work on Pasla Approach road Length 1.00 Km, Dhangawan Padariya road Length 1.80 Km, Thoda Approach road Length 1.00 Km,Godaru Nala to Dhumma Devgawan Road Length 2.40 Km,Jamuna Parasi main road to Chouhari Titaripondi Dhurwashin road Length 2.40
Electrical Installation work for SITC of AC machine for Law Department at 4th floor of G Block of Writers Building.
Providing arrangements for the Independence Day Celebration-2026-Providing temporary DG set and lighting arrangements for Independence day celebration at Idukki from 13/08/2026 to 15/08/2026-Temporary Electrical Work
Restoration work of Barasat -Basirhat Road damaged by PHE Dte. Arsenic Division due to laying underground water supply pipe line under Barasat Division, PWD
Development of Pond at Ram Mandir, Ranchi Basthi, Mithakhari ward no.02 Mithakhari Panchayat AE/FG, RCD, APWD, Wimberly Gunj (AMRIT SAROWAR PROJECT) S.W Development of Pond near Sri Murugan Temple at Namunaghar under RCD,APWD, Wimberly Gunj.
Construction of toilet block for boys and girls in Government Higher Secondary School at Kottanaththampatti in Madurai district
Shifting of the office of the WB Seed Corp. Ltd...of Bio-Control Laboratory Bildg...NSC Bose Rd. Kol-41-Dismantling and re-installation incl. some addition alteration and allied work in respect of functioning Fire Detection system at new location.
Zonal Contract for Maintanace of PWD all roads Under Sub Division Anuppur Division Anuppur (All SOR Item of Road and bridges SOR effected from 11.04.2025 and its Amendment)
09/03. CONSTRUCTION OF ROAD AND DRAINAGE LINE NEARBY AREA OF KRUSHNA TEMPLE,SHRIRAM TEMPLE,SHRI SAI TEMPLE,SHRI VAGHJAIMATA TEMPLE,SHRI JAIN TEMPLE,SHIVRAI COLONEY,LIPANE WASTI AT AMBEGAON. TAL - HAVELI, DIST- PUNE
Replacement of 2 No s Duct able Split AC machines and allied Electrical work in Dissection Section Hall at Forensic Building under NRSMC and H Kolkata during the year 2025 26
GENERAL-Bridges North Circle Kozhikode- Replacement of the damaged Batteries of the existing UPS-General Electrical Work
Providing Chain link fencing at Govt. Primary School, Aniket.
Supply and installation of Video Conferencing units for Paperless Courts and Online Courts, Courts and Court Complexes and Hospital in Idukki District
Replacement of more than 10 Year-Old Air Conditioning Machines at PWD IT Hi Com Room located at Ground floor of Main Block of Writers Buildings.
Repair and maintenance of existing Fire Protection System at Barasat Government Medical College and Hospital.
Restoration of rain damages on Bhuntar Manikaran road Km. 1/610 to 35/110. (SH- Construction of Retaining Wall with pushta at Km 13/400 to 13/420, 13/500 to 13/520,14/900 to 14/935 and wire crated Retaining wall at RDs 13/700 to 13/720 etc.).
Running contract work at various building (Except Court complex,THS Mutholy,Civil station Pala and Rest houses) under building section Pala.During the period 2026 - 2027
Maintenance of Govt RB and NRB Section Kotma and Funga Under PWD Sub Division Anuppur (All SOR Item of Building effected from 01.01.2024 and its Amendment)
09/01. CONSTRUCTION AND PROVIDE DRAINAGE LINE,ROADS AND OTHERS WORKS IN THE AREA OF SHANI NAGAR,SIDHIVINAYAK COLONEY,GANESH COLONEY,VAGHJAI NAGAR,DABHADI AREA AT AMBEGAON BK. AND AMBEGAON KH. TAL - HAVELI, DIST- PUNE
Special Checking, Rectification, Testing and Re-Commissioning of Fire Detection Alarm System at Alipurduar DH.
Repairing of potholes of Kholapota-Baduria-Maslandapur-Habra (KBMH) Road from Ch. from 16.00 kmp to 19.00 kmp of Bongaon Sub-Division under Barasat Division, PWD during the year 2024-25.