Loading…
Loading…
363 results • Latest
Repairing of Neela Dewantala Road from 2.00 Kmp to 2.70 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Supplying of CRRI Approved Material for instant use in All Weather Conditions to Road Repairing by Potholes having Polymeric Premix capable of performing in Water Logged area etc at Diff Stackyard under DHHD in the Dist of South 24 Pgs
Minor Repairing and Maintenance Work of Building of Diamond Harbour Highway Division under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Repairing of Fringe Road from 4.00 km to 4.83km (in stretches) under Falta E.P.Z Highway Sub-Division of Diamond Harbour Highway Division in the Dist. South 24 Pgs. for the year 2025-2026.
Repairing of Sarishahat Nainan Road from 7.20 Kmp to 10.80 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Repairing of Rajarhat Dighirpar Road from 0.00 Kmp to 4.00 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Construction of Security guard room, Stairway to the pond and other ancillary works within office compound of Falta E.P.Z. Highway Sub-Division under Diamond Harbour Highway Division in the District of South 24 Parganas during the year 2025-26.
Repairing of Sarishahat Nainan Road from 4.20 Kmp to 7.00 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Bunorhat to Kalitala Road from 0.00 Kmp to 2.94 Kmp. with a link from Jhalaler More to Paler More from 0.00 Kmp to 1.45 Kmp, Surfacing work in Two stages under Diamond Harbour Highway Sub-Division under Diamond Harbour Highway Division in the Dist
Dighirpar Muchisa Road from 0.00 Km to 11.70 Km for the work of Strengthening by Paver Block of damaged Mastic Zone ( in Stretches) in the district of South 24 Parganas under Diamond Harbour highway Division, PW(Roads) Dte during the year 2025-2026
Sararhat Birlapur Road from 6.00 Km to 16.66 Km for the work of Strengthening by Paver Block of damaged Mastic Zone ( in Stretches) in the district of South 24 Parganas under Diamond Harbour highway Division, PW(Roads) Dte during the year 2025-2026
Dewanganj-Chaltaberia Road, Surfacing Work, from 0.00 Kmp to 4.97 Km, Under South 24 Pgs. Highway Division in the district of South 24 Parganas
Chakberia (Kalabaru Ghutiari Shariff) Road from 0.00 to 4.070 Km Surfacing work under South 24 Parganas Highway Division in the district of South 24 Parganas
Kulgachia Tulsiberia Link Road from 0.00 Km to 3.60 Km, Strengthening Work under Howrah Highway Division in the District of Howrah. Project ID-PD252645808S000. during the Year 2025-26
Link Road to Balichaturi via Ghoshpur Kalia, from 0.00 Km to 2.50 Km, Surfacing Work under Howrah Highway Division in the District of Howrah
Engagement of 29 nos. Security Personnel on purely temporary basis of different categories for guarding, at different Government Stack-yard, Office etc. under the control of the Executive Engineer, Murshidabad Highway Division No.I within the jurisd
Preparation of Detailed Project Report (DPR) for strengthening of Berhampore Hariharpara Amtala Road from 0.00 km to 17.00 km under Murshidabad Highway Division No.I in the District of Murshidabad
Kamarpara-Kurmail-Chingishpur Road from 2.00 kmp to 8.00 Kmp in Stretches, Urgent patch repairing works under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur - during the year 2025-26.
Fulbari-Kumarganj Road from 0.00 kmp to 1.00 Kmp in Stretches, Urgent patch repairing of belmouth portion with Junction improvement and other allied works under DDHD in the District of Dakshin Dinajpur - during the year 2025-26.
Patun-Jordighi Road from 9.00 Km to 12.00 Km, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26.
Supply of Security Guards in different Stack yard, office, Inspection Bungalow , campus etc. for the period of 1 (one) year under Asansol Highway Division , P.W.(Roads) Directt. Paschim Burdhaman, during the FY 2025-26
Muchia Singabad Road VR from 0.26 km. to 8.10 km Potholes repairing and Patch Surfacing work in stretches under Malda Highway Division in the district of Malda during the year 2025 2026.
Bulbulchandi Katlapukur Road from 0.50 km. to 4.00 km, 7.00 km. to 9.00 km and 14.00 km to 14.50 km Potholes repairing and Patch Surfacing work in stretches under Malda Highway Division in the district of Malda during the year 2025 2026.
Mirzapur Bansihari Road from 15.00 km. to 20.00 km in stretches Potholes repairing and Patch Surfacing work under Malda Highway Division in the district of Malda.
Adina Chakli Road VR from 0.50 Km to 2.76 Km in stretches Patch repairing works under Malda Highway Division in the district of Malda.
Agampur Ranigunj Road MDR from 4.00 Km to 8.30 Km, Urgent Potholes repairing and Patch Surfacing work in different Stretches under Malda Highway Division in the district of Malda.
Eklakhi Rashikpur Road MDR from 0.00 Km to 4.00 Km, Urgent Potholes repairing and Patch Surfacing work in different Stretches under Malda Highway Division in the district of Malda.
Kaliachak to Golapganj Road from 0.00 km to 4.00 km Potholes repairing and Patch Surfacing work in stretches under Malda Highway Division, in the District of Malda during the year 2025 2026.
i) Quarterly AMC of BHMS ( Bridge Health Monitoring System) for 4- Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway Station at 5.8 Km on Diamond Harbour Road (NH-117), Kolkata, West Bengal, under Howrah Highway Division in the District of How
Urgent Patch Repairing of Ramnagar-Bazarshaw-Chowrigacha-Khagraghat Road from 1.00 Kmp to 7.00 Kmp and 8.00 Kmp to 10 Kmp under Murshidabad Highway Division No.II during the year 2025-26
Providing round the clock security arrangement by deploying 15 nos. security guard per day for guarding at different office premises, stack yard under Purulia Highway Division in the district of Purulia during the year 2025-2026.
Nimtita Aurangabad Road from 0.00 Kmp to 2.30 Km, Widening and Strengthening work under Murshidabad Highway Division No. I in the District of Murshidabad.
Construction of 02 nos box culvert (single cell-1.50m x 1.50m) in replacement of existing damaged culvert at 13th and 14th km of Raghunathpur-Kantaberia road under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan
Construction of 1(one) no culvert with paver block approach including 125.0 m storm water drain at 10.70 km of Burnpur Samdi Road (FR-19) under Asansol Highway Division
Road side drain cover at Asansol Office campus for safety under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.
Repairing of Old GT Road Budbud Portion from 0.00km. to 0.500km. and 1.50km. to 2.50km. by repairing Potholes, profile corrective course, premix carpet etc. in patches of Sadarghat Highway Sub-Division No. II o under Asansol Highway Division,
Patch repairing work of Raghunathpur-Kantaberia Road via Molandighi from 10.80kmp. to 12.00kmp., 13.80kmp. to 15.50kmp. 16.00kmp. to 17.00kmp. in stretches of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate,
Emergent repairing of Old GT road Budbud Portion from 0.500km to 1.50km and 2.50km. to 3.58km. by repairing potoholes, profile corrective course, Premix carpet etc. in patches of Sadarghat Highway Sub-Division No. II
Emergent patch repairing work of Different stretches at Chanda-Domohani Road (FR-14) from 8.50 km to 9.50 km and 10.00 km to 10.50 km by providing patching pot holes, repairing potholes and 20mm premixed carpeting work of Asansol Highway Sub-Divn.
Emergent repairing work of Different stretches at Domohani Churulia Ajoy Ghat Road (DCA) from 3.5 km to 5.2 km by providing patching pot holes by jhama metal and stone metal etc
Emergent inside repairing and maintenance work of A5 quarter at Old NH Campus in the year 25-26 at Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26
Joynagar Jalaberia Kultali Road from 7.40 Kmp. to 19.40 Kmp. Restoration in Patches and Patch Surfacing Work under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Restoration of Carriageway Damaged due to Laying of Pipes by PHED at Basuldanga Railway Station to Panchagram Health Centre Road from 0.00 Kmp. to 1.85 Kmp. under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division, P.W.Roads
Taldi- Chandaneswar Road, Reconstruction of damaged Slab Culvert at 4.10km under Canning Highway Sub-Division of South 24 Parganas Highway Division in the district of South 24 Parganas
Emergent protection work of D/S side of Kunur Bridge at ch. 9.400km of Panagagh-Illambazar road by sausage wall under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardhaman during the year 2025-26
Repairing of Kunur Bridge Bituminous surface at 9.40 km of Panagarh-Illambazar road by profile corrective course, repairing potholes, premix carpet etc. in patches under Asansol Highway Division, P.W.(Roads) Directorate
Emergent protection work of abutments and wing-walls of DVC navigation canal at 10th km of Shikarpur-Galsi road of Sadarghat Highway Sub-Division No. II under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardhaman
Mahinagar-Debpur road emergent repair by potholes, premix carpet etc. in stretches from 0.90 to 1.50 km., 2.00 to 2.40 km., 5.42 to 5.60 km., 5.90 to 6.12km. under Sadarghat Highway Sub-Division-II of Asansol Highway Division, P.W. (Roads) Directorat
Development of Footpath and Drain of Gurudasnagar Railway Station to Diamond Harbour Road from 1.00 Kmp. to 2.85 Kmp. in stretches under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Repairing and maintenance work of road flanks from 0.00 kmp. to 2.00kmp.of DVC Feeder Road of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate,in the district of Paschim Bardwan during the year 2025-26(2nd Call)