Loading…
Loading…
363 results • Latest
Dhulagarh Domjur via Begri Road from 0.00 Km to 1.00 Km and 3.00 Km to 3.80 Km, Restoration work of PHE Cutting for laying pipe line under Howrah Highway Division in the District of Howrah. (Under Head- Deposit Head)
Dewanghata Bowbazar Road with link to deulpur H.C from 0.00 km to 2.20 km, Restoration work of PHE Cutting for laying pipe line under Howrah Highway Division in the District of Howrah. (Under Head- Deposit Head)
Permanent Restoration for Probable Damage Stretches, from Ch. 0.00 Kmp to 3.190 Km, due to Laying Pipe Line along Bauria Feeder Road for LDS work in Zone-5 under Sankrail Surface Project, Block - Uluberia under Howrah Highway Division
Road Marking and allied work at Ranihati Haridaspur Amta road between 0.25 km to 15.40 km under Howrah Highway Division in the District of Howrah during the year 2025-26. (Under Head Non Plan)
Domjur Andul Road 0.00 Kmp to 4.80 Kmp. Repair and Maintanance Work in Patches under Howrah Highway Division in the district of Howrah in the year 2025-2026. (Under Head- Non Plan)
Domjur Baluhati Jagadishpur Road from 4.50 km to 7.00 kmp, restoration of damaged road by paver block and others allied work in different stretches under Howrah Highway Division in the Dist. of Howrah during the year 2025-26. (Under Head- Non Plan)
Patch Repairing work in stretches between chainage 0.00 Km to 3.95 Km Excluding Mastic Zone and Permanent protection zone of Singti Pancharul Road under Amta Highway Sub - Division of Howrah Highway Division in the district of Howrah
Andul Feeder Road from 0.00 km to 0.300 km, Permanent restoration work of PHE cutting for laying Pipe Line under Howrah Highway Division, P.W.(Roads) Directorate in the district of Howrah during the year of 2025-26. (Under Head- Deposit Head)
Development and Beautification Work at Road side Childrens Park on 4.30 Km of Bagnan - Mankur Road under Howrah Highway Division in the district of Howrah for the Year of 2025-26.
Repair and restoration of Hume pipe culvert and face wall at 2.70 kmp on Dhulagari Domjur Road via Begri of Howrah Highway Sub Division under Howrah Highway Division in the District of Howrah during the year 2025-26
Restoration of road for laying Optical Fiber Cable by Micro trenching in Govt. Land of P.W.(Roads) Dte. at 0.616 km to 0.731 km, Madirtala underpass to Kajipara Road for a length of 115.00 m (R/S) under Howrah Highway Division in the Dist. of Howrah
Repairing of Boundary wall of Munshirhat Highway Section of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year 2025-26 (Under Head- Non Plan)
Domjur Baluhati Jagadishpur Road from 0.00 Kmp to 0.580 Km, at different stretches for permanent restoration of PHE cutting for laying pipr line under Howrah Highway Division in the District of Howrah. (Under Head- Deposit Head)
Repairing of potholes and Stitching of stretches of Amta Bridge Approach Road from 3.28 Km to 5.36 Km of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah in the year of 2025-26. (Under Head- Non Plan)
Udaynarayanpur Pancharul Road 1.00 Kmp to 7.00 Kmp, Patch Repairing Work in stretches of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year of 2025-26. (Under Head- Non Plan)
Restoration of Hard shoulder of Uluberia Panpur Road from Ch. 0.750 Km to Ch. 0.800 km (50.00 m) RHS and Ch. 0.800 km to 1.412 km (612.00 m) with respect to the work of Supplying and Laying 300 mm to 500 mm dia DI (K9) Clear water Rising Main
Painting Works of Majherhat R.O.B. under Howrah Highway Division, in the district of Howrah during the year 2025-26. (Under Head Non Plan)
Kamina Bridge at 3.00 Km of Kulgachia-Tulsiberia Road, Rehabilitation work under Howrah Highway Division in the district of Howrah
Emergent patch repairing work of Different stretches at Domohani - Gourandi-Runakuraghat from 8.00 km to 8.50 km by providing patching pot holes, repairing potholes and 20mm premixed carpeting work of Asansol Highway Sub-Division underAHD(2nd CAal)
Repairing and maintenance work of traffic rotary and island at DVC Feeder under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.(2nd Call)
Conducting various test for health assessment of Kunur Bridge at 10th km of Panagarh Illambazar road (SH-14) under Asansol Highway Division in the District of Paschim Bardhaman during the year 2025-26.
Maintenance of Bigra-Dignagar(Ph-II0 road by potholes, premix cerpe etc. in stretches from 0.2 to 0.6km., 1.5 to 1.6km., 2.2 to 2.4km., 2.50 to 2.70km., 3.40 to 3.50km. and 4.40 to 4.50km. under Asansol Highway Division, P.W. (Roads) Directorate,
Ghoksadanga Hospital Chowpathy to Atpukuri road from 0.00KM to 3.498KM (in different stretches), repairing of potholes, patching of potholes and road surfacing work under Coochbehar Highway Division in the District of Coochbehar.
Dinhata Balarampur Chilakhana Road, From 0.00 km to 20.00 km regarding Cutting, Felling including Carraige of 90 nos of trees following Complementary plantation along with uprooting and Removing Stumps an roots, filling the gaps with sand under Cooch
Kakina Road From 0.00 km to 8.75 km Widening and Strengthening and From 8.75 km to 22.25 km Strengthening Work balanced work regarding Cuting, Felling including Carraige of 153 nos of trees following Complementary plantation along with uprooting
Akra-Santoshpur Taratala Road, Permanent Restoration of road damages due to the work Santoshpur to Karbala crossing rail line from 0.00 km to 2.30 km strengthening work Arrangement of balance Street lighting work on Akra Santoshpur Road.
Collection of Toll on Shree Gouranga Setu over river Bhagirathi at Nabadwip in the District of Nadia under Nadia Highway Division No. I (2nd call).
Engagement of 17 (seventeen) Nos. Private Security Personnel through Private Security Agency under Cooch Behar Highway Division, P.W. (Roads) Dte. In the district of Cooch Behar.
Cooch Behar Baneswar Alipurduar road (SH-16)from 6.00 Km to 9.00 km Patch repairing work in stretches under Cooch Behar Highway Division in the District of Cooch Behar.
Left out portion of NH-2 to Durgapur Barrage Road (SH-9) from 6.00km. to 6.10km strengthening work of the existing carriageway under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Patching repair of NH-2 to Industrial Housing Scheme Road (Sen Ralaigh Road) from 1.50kmp. to 2.50kmp. by providing repairing potholes etc. under Asansol Highway Sub-Division of Asansol Highway Division, P.W. (Roads) Directorate,
Emergent road side protection work at 6th KM of Cooch Behar Baneswar Alipurduar road (SH-16) under Coochbehar Highway Division in the district of Coochbehar.
Preparation of Road safety estimate as per Road safety audit observation from 0.0 kmp to 19.2 km of Cooch Behar Baneswar Alipurduar road (SH-16) under Cooch Behar Highway Division. including preparation of PPT of DPR.
Panchanan Setu, 63 km of Mathabhanga Cooch Behar road, Emergent protection work (towards right side) and jungle cutting and other allied work in between 60.00 kmp to 63.00 kmp under Coochbehar Highway Division in the District of Coochbehar .
Curtain wall, floor appron and boulder protection work at the upstream side of culvert at 4th kmp of Giladanga Keshoribari road under Cooch Behar Highway Division in the district of Cooch Behar.
Installation of Hight Restriction Bar for Tora Ghat Par Joist Bridge situated at 1st Km of Byapari Para (Pradip Byaparis House) to Krishnapur-Tufanganj Road via Gour Mohan Bazar from 0.00 Kmp to 4.43 Kmp, under Coochbehar Highway Division
Recovery and restoration work of Kharubhanj Bazar (12th KM of Dinhata-Sahebganj Road) to Bamonhat Road via Nayarhat Voter Chhara , from 0.00 km to 3.816 km under Coochbehar Highway Division in the District of Coochbehar for mending up damages occurre
Recovery and restoration work of Maruganj VP Road from 0.00 kmp to 4.80 km under Coochbehar Highway Division in the district of Coochbeharfor mending up damages occurred due to heavy rainfall / flood like situation (2nd call).
Recovery and Restoration of Lalbazar Paglimari Road from 0.00 kmp to 4.50 kmp under Coochbehar Highway Division in the district of Cooch Behar for mending up damages occurred due to heavy rainfall/flood like situation (2nd Call).
Recovery and restoration work of Salmara Bazar (11 th km of Burirhat Salmara road) to Balarampur road via Saktir Bazar , from 0.00 km to 5.25 km under Cooch Behar Highway Division, in the district of Cooch Behar for mending up damages occurred due to
Recovery and restoration of flood damaged approaches (2nos culvert location) and flanks from 1.0 km to 2.0 km of Sitai Vharali road .
Recovery and Restoration of embankment damages at both end approach roads of Devi Kamteswari Setu over river Mansai( Singrimari) in the connecting road from Kakina road to Adabarighat Sitai road due to excessive rainfall under Cooch Behar Highway Div
Matigara - Kurseong Road from chainage 11.00 kmp to 15.00 kmp (in stretches) Surfacing work by Mastic Asphalt, Protective and allied work under Darjeeling Highway Division in the district of Darjeeling.
Construction of new drain at 6.30 Km chainage of NH 34 Eklakhi Railway Station Road under Gazole Highway Sub Division of Malda Highway Division in the district of Malda.
Kaliachak to Golapganj Road from 6.00 km to 9.00 km Potholes repairing and Patch Surfacing work in stretches under Malda Highway Division, in the District of Malda during the year 2025 2026.
Adina Chakli Road from 28.50 km to 32.50 km in stretches Potholes repairing and Patch Surfacing work under Malda Highway Division in the district of Malda.
Adina Chakli Road from 20.31 km to 25.66 km in stretches Potholes repairing and Patch Surfacing work under Malda Highway Division in the district of Malda.
Repairing of Katakhali Mallickpur Road from 0.00 Kmp to 2.70 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.
Repairing of Sarisha Noorpur Road to Hooghly River Bank Road from 0.00 Kmp to 1.10 Km (in Stretches) under Falta E.P.Z. Highway Sub-Division of Diamond Harbour Highway Division during the year 2025-2026.
Repairing of Road connecting Ferryghat at Raichak from 0.00 Kmp to 1.145 Km (in Stretches) under Falta E.P.Z. Highway Sub- Division of Diamond Harbour Highway Division in the District of South 24 Parganas under during the year 2025-2026.