Loading…
Loading…
363 results • Latest
Emergent repairing of Pandabeswar Shamla Road (FR-21) from 2.00 km to 3.50 km (in different stretches) by providing patching pot holes, 20 mm premix and seal coat (Type-B) etc. of Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roa
Inside repairing and maintenance work of A4 building at Old NH Campus in the year 25-26 at Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.
Patch repairing and maintenance work Ukhra-Nachan Road in stretches from 0.0kmp. to 2.0kmp. and 7.5km. to 8.5km. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan FY 25-26
Patch repairing of Link road from Madhaiganj village to Muchipara-Shibpur road, from 0.20 km. to 0.40 km., 6.20km. to 7.20 km.and 7.60 kmp to 8.40 kmp in stretches under Durgapur Highway Sub-Division
Emergent road safety work at Muchipara-Shibpur Road, from 0.00 km to 18.52 km at different locations in connection with Joydev Kenduli Mela 2026 under Durgapur Highway Sub-Division
Patch repairing work of NH-2 to Durgapur Barrage road from 1.00 to 2.50kmp. and 3.50kmp. to 5.00kmp. in stretches of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan
Patch repairing and maintenance work of DVC Feeder Road in stretches from 0.00km. to 1.00km. and 2.00km. to 3.00km. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan FY 25-26
Patch repairing work of Raghunathpur-Kantaberia Road via Molandighi from 3.40 kmp to 5.50 kmp and , 10.00 kmp to 10.80 kmp in stretches under Durgapur Highway Sub-Division
Emergent repairing of Different stretches at Kalipahari Tirat Road (FR-17) from 0.00 km to 1.50 km by providing repairing potholes 20 mm premix and seal coat (Type-B) etc. of Asansol Highway Sub-Division under Asansol Highway Division
Galsi-Gohogram Road from 2.000km to 2.200km, 3.80 km to 3.9 km and 4.50 km to 4.60 km (in stretches) Patch Repairing work of the existing road under of Asansol Highway Division, P.W. (Roads) Directorate, in the district of Purba Bardhaman
Patch repairing work of Muchipara-Shibpur Road from 2.50km. to 4.00km., 6.00km. to 8.20km., 10.80km. to 13.20km. 16.00km. to 18.00km. in stretches of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate,
Patch repairing and maintenance work of Ukhra-Madhaiganj Road in stretches from 1.50km. to 2.50km. and 6.00km. to 9.00km. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of
Abhirampur-Paraj-Kolkol road, 1.00kmp. to 3.00kmp. and 5.00kmp. to 6.50kmp., patch repair work under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Burdwan during the year 2025-26
Traffic Calming Measures on Bagnan Srikol Kamalpur Road under Jurisdiction of Bagnan Highway Section under Howrah Highway Division in the district of Howrah during the year 2025-2026
Shyamnagar-Polerhat-Pakapole Bazar Bijoygunge Kanthalia Bus Stop Road from 3.300 Kmp to 4.900 Km within Alipore Highway Sub-Division under South 24 Pgs. Highway Division in the district of South 24 Parganas
Balarampur Highway Section Office at Balarampur, Repairing and renovation work including construction of perished and damaged compound boundary wall under Purulia Highway Division in the District of Purulia.
Sikharpur-Kulti Canal Road from 0.00 kmp to3.00 kmp, Lauhati Bhangar Bazar Road from 0.00 kmp to 4.00 kmp, Traffic Calming Measures at 15(Fifteen) nos location within Rajarhat Traffic Guard , Kolkata Police, under South 24-Pgs.
Surjopur-Dhamua Road from 0.00 kmp to 1.00 kmp, 5.00 kmp, to 6.80 km, Emergent patch repairing work, under South 24-Parganas Highway Division in the Dist of South 24-Parganas.(2nd Call)
Kulari Milan Bazar Road from 2.00 Kmp to 6.00 kmp, Emergent Restoration in patches under Canning Highway Sub-Division under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Jhorer more to Khuribhanga Pumping Station Road from 4.00 kmp to 8.00 kmp, Emergent restoration in patches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Akra-Santoshpur Taratala Road from 0.00 kmp (near Rabindranagar Police Station) to 3.650 kmp (Near Paharpur Club), Permanent Damage Restoration Work under South 24 Parganas Highway Division due to laying of Individual House Sewer Connection and allie
Restoration of Sararhat Birlapur Road from 0.00 km. to 12.320 km and Sarishahat Nainan Road from 1.520 km to 2.10 km to be damaged due to laying of pipe lines by KMDA under Falta E.P.Z Highway Sub-Division of Diamond Harbour Highway Division in the
Emergent patch repairing work of different stretches at Domohani-Churulia-Ajoy Ghat Road from 2.00km. to 3.50km. by providing patching potholes and 20mm premixed carpeting work
Emergent repair of NH-2 adjacent to Panagarh bypass Road from 514.430 kmp to 516.500 kmp by Potholes repair and Premix carpet etc. in patches under Sadarghat Highway Sub Division No II of Asansol Highway Division, P.W. (Roads) Directorate,
Begunkodar-Jhalda Road from 0.00 Kmp to 4.00 Kmp, Repairing work with premix surfacing and seal coat in stretches under Purulia Highway Division in the District of Purulia.
Hura-Puncha Road from 16.00 Kmp to 21.00 Kmp, Maintenance and Repairing work by providing premix carpet and seal coal in patches under Purulia Highway Division in the District of Purulia.
Road surface Repairing and Maintenance work of Baragram-Sargora- Laharia Road from 6.00 Kmp to 10.00 Kmp in strechtes under Purulia Highway Division in the District of Purulia.
Ladhurka-Gamarkuli Road from 1.00 Kmp to 6.0 Kmp, Repairing works with premix surfaceing and seal coal in stretches under Purulia Highway Division in the District of Purulia.
Sobha Bridge at 20.530 Km, on Balarampur- Bagmundi Road (SH-4) Restoration of damaged footpath, Protective works, Slope protection works and allied Works under Purulia Highway Division in the District of Purulia.
Upper Totko Bridge at 20th Kmp, on Barabazar- Bandwan Road, Repair and rehabilitation works and restoration of damaged floor protection and Protection works including allied Works under Purulia Highway Division in the District of Purulia.
Bagdhara Bridge over Local Khanri at 3.77 km of Mahendra More Kumarganj Bus stand via Paitadighi road under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur. Project ID PD252632267S000
Supply of 1 No Good condition Motor Cab popularly known as Luxury taxi with commercial permit with driver on per day hire as and when necessary and purely on temporary basis for official duty of the office of the Superintending Engineer, NHC, PWRD
Bridge over River Kumari at 7.550 Km on Manbazar-Bandwan-Kuilapal Road (SH-5), Restoration of Damaged Protective Works Including Protection of embankment, Slope pitching etc. and allied Works under Purulia Highway Division in the District of Purulia
Chalsa Matelli Road from 0.00 kmp to 8.00 kmp, Surfacing Work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 252637917S000
Recovery and Restoration work of Gosala More to Fatapukur More road from 0.00 Kmp to 18.00 Kmp (Except Mastic portion from 1.50 km to 2.00 kmp) under Jalpaiguri Highway Division in the district of Jalpaiguri
Recovery and Restoration work of Jalpaiguri to Choulhati road from 1.50 kmp to 18.30 km under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy rainfall / flood like situation.
Patgram Bhutan Cross Road from 0.00 kmp to 10.00 km, Surfacing work under Coochbehar Highway Division in the district of Coochbehar. Project ID PD 252639861S000.
Gadadhar Setu (Joist Bridge) at 4th Km Chotomahadev Village road, Strengthening work under Cooch Behar Highway Division in the district of Cooch Behar., Project ID PD252643550S000.
Recovery and restoration work of Cooch Behar Baneshwar Alipurduar Road (SH-16) from 0.00 kmp to 9.00 kmp (Excluding 2350 m. Existing Mastic) under Cooch Behar Highway Division in the district of Cooch Behar for mending up damages occurred due etc..
Recovery and Restoration (Land slide) works of Garidhura -Mirik-Simanabusty road at Ch. 8.90 km for mending up damages occures due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling.
Totko Bridge at Boro, 17.394 Km on Manbazar-Bandwan-Kuilapal Road (SH-5), Restoration of Damaged Protective Works, Slope Protection, Replacement of expansion joint and other allied Works under Purulia Highway Division in the District of Purulia.
Nigasai Bridge at Hijla, 23.750 Km on Balarampur-Barabazar-Sindri Road (SH-4), Restoration of Damaged Protective Works, Slope Protection and allied Works under Purulia Highway Division in the District of Purulia.
Naltahar More to Khaspur BPHC Road from 0.00 Km to 4.00 Km (In Stretches) Patch Repairing Works, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26.
Kumari Khal Bridge at Bishkudra, 30.850 Km on Balarampur-Barabazar-Sindri Road (SH-4), Restoration of Damaged Protective Works, Slope Protection and allied Works under Purulia Highway Division in the District of Purulia.
Emergent restoration work of river bank besides joist bridge over river Gadadhar (at Krishnapur end) at 4th Km of Choto Mahadev Village road under Cooch Behar Highway Division in the District of Cooch Behar
Dressing and Chilchalling work at road flank from 0.0 Kmp to 4.340 Km of Bispuria Bankura Border Road under Purulia Highway Division in the District of Purulia Highway Division in the district of Purulia (2nd Call).
Construction of a 1.20 metre Dia HP Culvert at 3.520 Km on the Hura-Puncha Road under Purulia Highway Division in the District of Purulia.
Natabari- Gadadhar Road 0.5 km to 1.01 km and Natabari Garoderhat road 1.50 km to 2.50 km potholes repair work under Cooch Behar Highway Division in the district of Cooch Behar in the year 2024-25.
Recovery and restoration work of Dinhata-Balarampur-Chilakhana Road from 20.00 kmp to 21.77 km including restoration of junction of guide bundth and approach road at Balarampur end of Vaoaiya setu under Cooch Behar Highwav Division, in the District o
Recovery and Restoration of Dinhata Mekhliganj (Sitalkuchi portion) Road from Ch. 0.00 kmp to 4.400 kmp under Coochbehar Highway Division in the District of Coochbehar for mending up damages occurred due to heavy rainfall / flood like situation