Loading…
Loading…
363 results • Latest
Recovery and restoration work of Byapari Para (Pradip Byapars House) to Krishnapur - Tufanganj road via Gourmohan Bazar, from 0.00 kmp to 4.43 km under Cooch Behar Highway Division in the district of Cooch Behar for mending up damages
Faltuhat Road from 0.00 kmp to 3.20 km, Strengthening works under Cooch Behar Highway Division in the district of Cooch Behar.
Recovery and restoration work of Ambari Road from 0.00 km to 7.10 km under Cooch Behar Highway Division in the District of Cooch Behar for mending up damages occurred due to heavy rainfall / flood like situation.
Mirik Bye pass Road form 0.00 kmp to 3.30 km, Surfacing work by Mastic Asphalt, Drain work, Protective work and Road Safety work under Darjeeling Highway Division in the district of Darjeeling
Recovery and Restoration of Gadli Bridge to Khaterbari Road from Ch 0.00 kmp to 4.32 kmp under Coochbehar Highway Division in the district of Cooch Behar for mending up damages occurred due to heavy rainfall/flood like situation.
Jaldhaka - Ranirhat Road from 0.00 kmp to 8.30 km Surfacing work (except 1900 m existing mastic work portions), under Jalpaiguri Highway Division in the district of Jalpaiguri.
Lataguri Kranti Road from 0.00 kmp to 5.90 km (except 990 m existing Mastic Asphat stretches), surfacing work including Mastic work for a length of 1215 metre under Jalpaiguri Highway Division in the district of Jalpaiguri.
Chengmari Upper Chengmari Road from Ch. 0.00 kmp to 7.20 km, Surfacing Work under Jalpaiguri Highway Division in the district of Jalpaiguri
Natabari Garoderhat Road from 0.000 kmp to 2.500 km, Strengthening works under Cooch Behar Highway Division in the district of Cooch Behar. Project ID PD252646934S000.
Natabari Balarampur Mandir Road from 0.000 kmp to 1.800 km, Strengthening works under Coochbehar Highway Division in the district of Coochbehar. Project ID PD252645424S000.
Natabari Gadadhar Road from 0.000 kmp to 1.010 km, Strengthening work under Cooch Behar Highway Division in the district of Cooch Behar. Project ID PD252645435S000.
Garidhura Mirik Simanabusty Road from Ch. 27.2 Km to 31.20 Km Mirik Bye Pass Road ch 0.00 kmp to 3.3 km, Restoration work due to laying of pipeline works for water supply scheme under AMRUT 2.0 under Darjeeling Highway Division ete..etc...
Rehabilitation of existing Steel joist bridge due to Corrosion and Weathering Action of Eight nos Joist bridges i.e. Bhutkura Bridge at 06th km of Patgram Bhutan Cross Road, Giria Bridge at 8th of Patgram Bhutan Cross Road, Bherbhari Bridge etc..etc.
Recovery and Restoration work of Tutapakri to Garalbari road from 0.30 km to 5.20 km under Jalpaiguri Highway Division in the district of Jalpaigur for mending up damages occurred due to heavy rainfall / flood like situation.
Recovery and Restoration work of Jalpesh Temple from Maynaguri Chengrabandha Road from 0.00 kmp to 3.80 km under Jalpaiguri Highway Division in the district of Jalpaigur for mending up damages occurred due to heavy rainfall / flood like situation.
Recovery and Restoration of Sitai Vharali Road from Ch. 0.00 kmp to 4.50 kmp and Sitai Kayeterbari Road 0.00 kmp to 2.17 km under Coochbehar Highway Division in the district of Coochbehar for mending up damages occurred due to heavy rainfall / flood
Recovery and Restoration of Ratherdanga Moinatoli Road from 0.00 kmp to 9.00 km under Coochbehar Highway Division in the district of Coochbehar for mending up damages occurred due to heavy rainfall / flood like situation.
Recovery and Restoration of Link Road to Kaljani HC, from 2.00 km to 8.62 km (except chainage from 2.400 km to 2.583 km, 3.200 km to 3.250 km, from 4.500 km to 4.590 km, 4.900 km to 4.990 km, 8.00 km to 8.303 km) under Coochbehar Highway etc..etc..
Recovary and Restoration work of Baradighi Nagrakata Road from 0.025 km to 2.00 km (except from 0.70 km to 0.90 km and 1.15 km to 1.27 km), from 3.00 km to 9.80 km (except from 4.50 km to 5.10 km and 7.00 km to 8.00 km) and etc.etc.
M.G. Road from 0.00 km to 1.045 km Strengthening work by interlocking concrete block pavement (ICBP) under Alipurduar Highway Division in the district of Alipurduar.
Recovery and Restoration (Land slide) works of Bunkulung to Soureni Road at Ch. 5.260 km for mending up damages occures due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling.
Nathainal Murmu bridge approach of Balurghat end at 4th Km of Vikahar Amtolighat Road, Embankment Protection Work under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur (2nd CALL). Project ID PD232404314S000
Outsourcing of security personnel for Guarding of the Office premises Stackyard Scheme sites Rest Shed Residential complex etc Round the clock for protection of Government materials and other properties under Uttar Dinajpur Highway Division
Construction of temporary pilgrim buffer zone and ramp to respective pilgrim hangers and PHE toilet block with double layered brick paved road (200mm), barricading and drop gate at Harwood Point bus stand under DHHD for ensuing Gangasagar Mela 2026
Restoration of carriageway and shoulder damaged due to laying of pipes by PHE Dte. at Link Road connecting Hatuganj Basuldanga Road and Gurudasnagar Rly. Stn.- Diamond Harbour Road under Diamond Harbour Highway Division.
Jibonmondalhat Sonatikerihat Road from 0.00 Kmp. to 7.00 Kmp. Repair and Maintaince Work in stretches under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Restoration of Road Edge Damaged due to Lying of Pipes by PHED of Bunorhat Kalitala Road from 0.00 Kmp. to 2.94 Kmp. with a Link Road from Jalaler More to Paler More from 0.00 Kmp. to 1.45 Kmp. in Different Stretches under DHHD
Repairing and Maintaince of Nilkuthi Piyangegunge Road from 0.00 Kmp. to 5.70 Kmp. in stretches under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Construction of Speed Breaker, Installing of Retro Reflective Traffic Signs and Road Marking for Different Black Spots of Jibonmondalhat Sonatikerihat Road and Joynagar Jalaberia Kultali Road under Diamond Harbour Highway Division.
Construction of Temporary barricading at different stretches of Chemaguri-Chayergheri, K1 Bus Stand to Jalal Morh and Jalal Morh to New Boarding point Y Channel at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Pgs.
Recovery and Restoration work of Banarhat Railway crossing to Mogalkata Bazar upto joist bridge from 0.00 Km to 8.45 Km, under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy etc..etc..
Recovery and restoration of Fulbari to Ambari Falakata Road from 0.00 kmp to 7.00 kmp under Jalpaiguri Highway Division in the district of Jalpaiguri for mending up damages occurred due to heavy railfall / flood like situation.
Construction of 01(one) no single cell 3.00 m x 3.00 m RCC Box Culvert at Ch. 5.850 km and 03(Three) nos. Single Cell 2.00 m x 2.00 m RCC Box Culvert at Ch 6.280 km, Ch 6.650 km Ch. 6.950 km at Giladanga Keshoribari Road under Cooch Behar Hwy Divn
Construction of 4(four) cell of size 4 m x 4 m Box culvert at Ch. 2.5 km of Patgram Bhutan cross road under Cooch Behar Highway Division in the district of Cooch Behar.
Construction of Paver Block Road at Magrahat Bazar at 8.00 Kmp. to 9.00 Kmp. in stretches 2nd Phase) of Dakshin Barasat Magrahat Usthi Road under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division.
Joynagar Kulpi Muldia Road from 0.00 Kmp. to 3.20 Kmp. Pot-holes Repairing and Surfacing Work in Different Portion under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Construction of Single Cell 2m x 2m RCC Box Culvert at chainage 8.060 km,8.275 km.8.470 km and 9.780 km of Sahudangi to Belacoba Road under Jalpaiguri Highway Division in the district of Jalpaiguri.
Jibonmondalhat Sonatikerihat Road from 9.00 Kmp. to 23.40 Kmp. Restoration in Patches and Patch Surfacing Work under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Jamtala Petkulchand Road from 0.00 Kmp. to 15.70 Kmp. Repair and Maintaince Work in Patches under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Lakshmikantapur Dhola Road from 0.00 Kmp. to 9.45 Kmp. Surfacing Work in Patches Excluding Mastic Zones under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Nimania Kaikhali Road from 6.00 Kmp. to 12.53 Kmp. Repairing Work in Stretches under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Construction of hume pipe culvert in place of existing old and damaged hume pipe culvert with 1400mm Dia and 17nos (Seventeen) rows situated at ch. 1.200 km of Jayanti Bazar to Unishbhisha G.P. office Road, under Coochbehar HWY DIVN
Repairing and Maintenance of Dakshin Barasat Magrahat Usthi Road from 0.00 Kmp. to 12.00 Kmp. in stretches under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Patch Repairing of Blacktop Surface in stretches of Lakshmikantapur Mandir Bazar Chakdah Road from 0.00 Kmp. to 17.17 Kmp. under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Panisala Balarampur Road from 0.00 km to 12.31 km (except chainage from 0.00 km to 0.13 km, 1.10 km to 1.29 km, from 1.70 km to 2.25 km, 5.20 km to 5.43 km, 9.80 km to 9.93 km, 10.50 km to 10.70 km, 11.20 km to 12.31 km) Surfacing work etc..etc..
Patch Repairing in Stretches of Bunorhat Kalitala Road from 0.00 Kmp. To 2.94 Kmp. with a Link Road from Jhalaler More to Paler More from 0.00 Kmp. to 1.45 Kmp. under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division.
Nagrakata Ramsai Road from 0.00 kmp to 6.00 kmp, Surfacing Work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 252637847S000.
Jayanti Dhawla Road from 6.3 Km to 15.00 Km, Surfacing work under Alipurduar Highway Division in the district of Alipurduar. Project ID PD 252632360S000.
Joynagar Jalaberia Kultali Road from 0.00 Kmp. to 6.00 Kmp. (Except Paver Block Area of 2900m Length) Restoration Work in Stretches under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Barobisha II to Sankosh River Road at Purba Salbari from 0.000 kmp to 4.180 km, 4.405 km to 5.169 km, 5.750 km to 5.810km, 5.948 km to 6.090 km, Surfacing Work under Alipurduar Highway Division in the district of Alipurduar. Project ID PD 252636650