Loading…
Loading…
161 results • Recent activity
Construction of flow measuring device ancillary works on Bhima Sina link Canal at Rd. 26750
Repairs of Earthwork in deep cut Km.25 to 26 km in Bhima -Sina Link Canal Tal. Madha Dist- Solapur.
Increasing the height of the head wall on the right bank canal of the chain no. 14/720 CTRB at Km 14 of the SMLIS and working to prevent leakage of the main canal on the Upalvate Minor at ch 2/030 to 2/250 canal of right canal of Sina Madha LIS.
Sina Madha Lift Irrigation Scheme RBC PDN Dy No.2 above main line ch No. 200 Sluice valve, ch No. 1680 Replacement of Scour valve Installation of Butterfly valve at Minor No. 6 ch No. 2180 and construction of RCC Chamber as well as replacement of bro
providing and carrying out dewatering of low level bucket (EDA) of Ujjani dam at Bhimanagar for inspection purposes
Construction of C.C. Lining in to prevent leakage ch 8/500 to 9/000 for Minor no. 8 of Modnimb Dy of Sina madha LI scheme