Loading…
Loading…
161 results • Recent activity
Supplying Security Guard for the year 2025-26 At K.T.Weir Kinni, K.T.Weir Akkalkot, K.T.Weir Nimgaon, K.T.Weir Mirajgi, K.T.WeirSatandudhani, K.T.Weir Sangolgi, K.T.Weir Ruddhewadi, K.T.Weir Bablad. Tal, Akkalkot, Dist Solapur
Construction of Earthwork, Structure and Manual C. C. Lining for Ch. 10/740 to 11/060 of Main Canal Stage-II ofD ahigaon Lift Irrigation Scheme Tal.karmala Dist.Solapur
FIXATION OF FLOOD LINE FOR BHIMA RIVER IN SOLAPUR DISTRICT FROM UJANI DAM D/S TO MAHARASHTRA AND KARNATAKA STATE BOUNDARY (CH.310 KM TO 568 KM) , BORI RIVER (CH.43 TO 118 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF Flood Level With
FIXATION OF FLOOD LINE FOR MAN RIVER (CH. 100 KM TO 181 KM), KORDA RIVER (CH. 0 KM TO 40 KM), BHOR RIVER (CH. 0 KM TO 52 KM) AND THEIR TRIBUTARIES (HYDROLOGICAL STUDY, COMPUTATION OF MAXIMUM FLOOD LEVEL WITH COMPUTERIZED SYSTEM, MARKING OF PROHIBIT
Conversion of open canal into closed pipe canal of minor 3 on distributory no 32 of URBC With Ancillary Work
Maintanance and repairs to Bhima Lift Irrigation Sub Div. No. 2 Indapur and branch office to prevent leackage, other ancillary repair work and install toilet blocks for the same.