Loading…
Loading…
1,227 live415 closing this weekmost from South Eastern Railway and Indian Railways
1,227 results • Latest
Carbon Brush Assembly for Wheel Set Earthing Equipment (for LHB type coach).
29440099-Blower fan motor with double extended etc.
CIRCLIPS IN SET COMPRISING OF 06 ITEMS IN 10 NOS.ETC.
Set of Temperature sensor gasket consisting of items as per annexure:-- (1) Set of Temperature sensor cover gasket for 3 phase locos. Gasket Part No.-3EHM 4130056 P0001 as per ABB Drg.No.-3EHM 311882 (Alt.-4) =01 No. (2) Set of Gasket for Temperature Sensor for 3 Phase locos TM consisting of 2 items- (i) Upper Gasket, ABB ID No.-HMMT 412426 P0002=01 No/Set. (ii) Lower Gasket, ABB ID No.-HMMT 412426 P0001=01 No/Set.
SET OF RUBBER SEAL, MODIFIED FOR ROOF TO CLW'S DRG. NO.- 05/4/44/145 (ALT.-2) COMPRISING OF-- (1) REF-1= 4 NOS. (2)REF-2= 2 NOS. (3) REF-3= 2 NOS. (4) REF-4= 2 NOS. FOR WAP4 & WAG7 LOCO. Shelf life of this item is 12 months.
Set of Cover for Fluorescent Lamps of 3phase locomotives as per CLW Spec. No.- CLW/ES/3/0041 (Alt-A). One Set consists of 2 items as follows:- (i) Cover of Fluorescent Lamp- corridor light,Qty.=1 No./Set, (ii) Cover of fluorescent Lamp Cab light, Qty.=1 No./Set.
O/H KIT OF DOUBLE CHECK VALVE TYPE 24A CONSISTING OF THE FOLLOWING 1)`O' RING TO WSF'S PT.NO.J72050/9 REF.4 = 2 NOS. (2) `O' RING TO WSF'S PT.NO. J72050/13 REF.5 = 1 NO. Shelf life of this item is 12 Months.
BP Isolating Cock with switch 1. 1/4" for E-70 brake system
Spares for O/H kit of Schunk Pantograph consisting of 06 items
Discharge/Earthing Rod assembly as per RDSO spec no- ETI/OHE/51(9/87) with A&C slip no. 1 for using 25 KV OHE with top hook assembly etc.
SET OF POLYAMIDE BUSHES FOR MODIFIED LUBRICATED PIN ARRANGEMENT OF WAG-7 LOCO TO RDSO'S DRG. NO. SKVL- 703, (ALT-4) (ONLY ITEM NO.- 3,4,5 & 6).
RUBBER GASKET FOR LOOKOUT GLASS TO CLW'S DRG.NO. 01/4/35/73, (Alt.10) Shelf life of this item is 12 months.
RUBBER KIT FOR 1.1/4" CUT-OFF ANGLE COCK WITH VENT AS PER CLW DRG. NO. 0/2/65/386 (ALT.6 ) Ref-12 & 13 (02 ITEMS 03 Nos.) CONSISTING (i) '0' Ring (Ref- 12) 01 No. (ii) Sealing Washer (Ref.-13)-02 Nos. Shelf Life of This item is 12 month.
Shim for CBC coaches, Size: 2 mm plate thickness.
Air Brake Hose Coupling for Brake Pipe.
HTS(High Tensile)Fish Bolts and Nuts.
Construction of relay hut for Gate Signaling at 09 non-interlocked LC Gates having TVU above 10,000 under Sr.DEN/South/KGP.
Set of Cable Terminal & Cable Sleeve for HS15250A Traction Motor Consisting of : - (i) Cable Terminal Type - 22 (300 sq. mm) to CLW's Drg. No. CLW/ES/SK-4/S- 25 (Alt. - I), Sheet No. - 10 = 1 No. and (ii) Cable Sleeve for Terminal Clamp to CLW's Drg. No. CLW/ES/SK-2/S-25 (Alt. - I), Sheet No. - 8 = 1 No. for WAG7 & WAP4 Locomotive.
Construction of 3rd line work including earthwork, blanketing, minor bridges, major bridges, LC work and other miscellaneous works for 25.0T and DFC feeder route of Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of 2x25 kV overhead equipment (OHE) for traction and power supply in connection with the 3rd Line work of Chandil- Madhukunda section in Adra Division of South Eastern Railway on Engineering, Procurement & Construction (EPC) Mode.
Earthing Cable complete 95 Sq. mm. (long) for LHB coach.
Authority to proceed for relief Engine/Train in to an occupied block section [TA- 602].
Set of Outer, Inner & Snubber springs for CASNUB 22 HS(MOD-II) Bogie.
Supply & testing of 500 KVA, 11KV/750V, 3-phase, 50 Hz. Outdoor type Power Transformer.
Supply, Fixing and Commissioning of Solar Standalone Street Light.
Complete Operation and Maintenance of 1.5 MGD Water Supply Treatment Plant including its Rapid Sand Gravity Filter , Clariflocculator, Auto Chlorination Plant etc. of Railway Settlement Chakradharpur (For 3 Years)
Construction of doubling of track work including earthwork, blanketing, minor bridges, LC work and other miscellaneous works for 25T Indian Railway Standard Loading, execution of indoor & outdoor S&T works, execution of general electrical works, installation and commissioning of 2x25 KV overhead equipment (OHE) for traction and power supply in connection with the Adra-Sanka-Rukni doubling project of Adra Division, South Eastern Railway on Engineering, Procurement & Construction (EPC) Mode.
160 sq.mm Annealed Copper Stranded Jumper wires & 50 sq.mm Annealed Copper Stranded Jumper wires