Loading…
Loading…
8 results • Latest
Construction of C.C. lining work in Chandarsi Main Canal From Reach 1.559 km to 1.800 km District Jalaun LOT-1
Supply Laying and Commissioning of 1.2 km and 0.5 k.m. long Asbestos Cement AC by mazza process, PN-7.5 class 15 Pressure Pipe line water distribution system of 350 mm and 150 mm diameter pipe having with all required accessories and T and P
In the district Jalaun, under the development block Dakor under the project of increasing the capacity of Amarur Pump Canal, the work of water distribution system including supply of pipeline of 1.5 Kms, 500 ccin the existing old main canal.
Construction of CC Lining in Parichha Minor from 3rd VRB to 1.30 km of Badagaon Pump Canal, District Jhansi LOT-2
Construction of CC Lining in Parichha Minor from 1st VRB to 3rd VRB of Badagaon Pump Canal, District Jhansi LOT-1
CONSTRUCTION OF CAMP OFFICE CUM MEETING HALL AT TUBEWELL COLONY ORAI CAMPUS, DISTT- JALAUN
CONSTRUCTION OF 04 Nos JUNIOR ENGINEER RESIDENCE Type III G Plus 1 AT TUBEWELL COLONY CAMPUS JALAUN of District JalaunU.P.
CONSTRUCTION OF INSPECTION HOUSE AT HEAD OF MAHOI PUMP CANAL Under Construction of New Mahoi Pump Canal Capacity 10 Cusec in Tehsil Madhogarh District Jalaun