MTPS I BM Unit III Boiler pressure parts AOH 2025 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit III Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area etc
MTPSI ES Circle EM-I Unit-III Dismantling and reassembling of HT LT terminal links of generator Transformer-III, UAT - 3A UAT 3B for conducting statutory testing of TG GT during Annual overhaul 2025
NCTPS I ES Circle EM II Dn SD II Carrying out time bound maintenance works of HT LT Switchgear in RWPH 5 MVA Power Transformer 250 KVA Service Transformer VCB Battery set at RWPH and HT LT Switchgear and motors at AHP FOPH AC Plant LT Switch
NCTPS I ES Circle EM II Dn SD-III Carrying out Time bound maintenance works of lighting in peripheral area of NCTPS I for a period of 360 days by engaging works contract
Sp.102 NCTPS II ES Circle EM I Dn GM S.Dn Regular and routine maintenance works in TG Bay 105 or 15T EOT cranes Oil purification control panels at Main oil tank TDBFP and central lube oil system in Unit I and II NCTPS II for the period up to 31st M