Loading…
Loading…
4,916 results • Latest
MTPS TM Unit I Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials during Unit I Annual overhau
Supply of 200 NB Spool piece suitable for Flushing water line of Stage I
Supply of Seal trough Regular makeup water assembly for Unit II Bottom Ash Hopper
MTPS I Mill Plant Unit I Fabrication of Vertical shaft lock Nuts and keys for XRP 803 coal mills
MTPS I CHPI Deep screening through packing Lifting the Track line ballast deficiency makeup work with 40mm hard broken stone ballast check rails at Wagon Tippler IV inhaul etc
Sale of Ferrous and Non Ferrous scrap in AS IS WHERE IS CONDITION available at Central and Substores of CEDC/West Circle
MTPS I TM I Unit I Annual Maintenance work in Main Turbine and its Auxiliaries during 2025 26
MTPS I CHP I Replacement of wornout Tongue rails Stock rails CMS crossings Check rails and PSC sleepers with fitting related and deep screening through packing of point crossings No 50 Power point 100 and 103
MTPS I M II Circle OAHS Retrieving the accumulated ash over and under the 08 Nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from B4 to UAD area
MTPSI Mill Plant I Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc and Releasing the journal spring assy