Loading…
Loading…
4,916 results • Latest
MTPSI TM Unit I Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26
MTPS I TM UNIT I Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2025 2026
Supply of Ash Slurry Pump Suction Connecting Spool Piece Suitable for Ash Slurry Pump House of Stage I and II OD 274mm length 290mm
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS RHS of condenser tubes in Unit I condenser during AOH of 2025 26
Supply of M.S. Grill Size 1.5 mtr x 1.5 mtr for ash handling pump house of Unit IV and V
MTPS I TM Unit I Removal and Reinsulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
SP.109 NCTPS-II ES circle MRT Division Unit II Generator Turbine and Boiler areas and their Auxiliaries Time Bound Contract works for the Routine Maintenance of MRT equipment for a period of 360 Days upto 31 03 2026 from the date of taking over
Fabrication and Supply of 500 NB 450 NB SS316Gr Pipes and fittings for Unit IV Ash water tank incoming and interconnection line for stage III Ash water pump house
MTPS I CHP I Removing wornout damaged rails dismantling the PSC concrete sleepers with fittings removing coal powder on the track line providing bed PCC mix WT V inhaul
MTPSI TM UNIT I Renewal of piston seal piston rod packing in HP LP Bypass Valves and its Spray valves Actuators including servicing of Oil filters during AOH of 2025 26