Loading…
Loading…
4,885 results • Latest
Cleaning of Toilets inclusive of water closets, urinals, wash basins, bathroom floors etc., including disposal of collected food wastes in Power House and allied areas of Stage 1 and 2 for the period from 01.04.2026 to 31.03.2027
cleaning the Roof Tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places for
Cleaning the Roof Tops of various buildings such as Power house, Switchyard 1 and CWPH 1 of Unit 1 to 3 and clearing away the deposits to far off place for the period from 01.04.2026 to 31.03.2027
Supply of 200 sets of 22KV standalone structure material complete set
Supply of 220Nos. of 11KV AB switch with PT insulator
Supply of 20000sets of Stay set Complete
Constant load hanger Assembly for HP803 Bowl mills
Supply of Absolute Bearing Vibration Sensors and its Extension Cable For Main Turbine and TDBFP Turbovisory System of Unit I and II
supply of spool piece pipe with flanged in one end and a loose flange for other end for delivery branch side and spool piece pipe with flange in both ends for expansion bellow side of discharge header of vertical type Cooling water pumps.
supply of various types of CPVC UPVC pipe fittings of EC plant