Loading…
Loading…
4,885 results • Latest
Repair and Maintenance Works to the Inner Compound Wall in between Unit 3 and 4 along West side of Switchyard 2
AS PER TENDER SPECIFICATION
Rectification Works to the Sea Water Tank and Floor of SWFP and AWPH in Unit 5 area
ICHP- Cleaning, maintaining and tightness checking all proximity switches, Thyristor control DC drive system, PCRD CCRD system resistance wires, brushes, power control cables, monitoring normalizing PCRD CCRD in Reclaimer-I and II machine
TTPS Mech II AHP Breakdown Maintenance works in ash slurry disposal lines of unit IV V for the period from 01 04 2026 to 31 03 2027
Arresting Water Leakage in the Roof of Bunker Building at 52m elevation in Unit 4 area
ICHP- Cleaning, maintaining and tightness checking all proximity switches, PCRD CCRD system resistance wires, brushes, power control cables, etc., in Stacker-I and II
TTPS Mech II AHP Breakdown maintenance works in Ash slurry disposal lines of Unit III for the period from 01 04 2026 to 31 03 2027
ICHP- Cleaning of the spilled and accumulated coal in Stacker-I II and Reclaimer-I II machines associated areas and removal of coal chocking in coal transfer chutes in all the four machines.
TTPS MechII AHP Unit I II III Breakdown maintenance works of HDPE pipes and fittings of size 40mm and 75mm OD and rubber lining of 80 NB to 450 NB MS pipes fittings flushing apparatus in Unit I II III ECO APH hoppers for the period from 01