Loading…
Loading…
6,050 results • Recent activity
MTPS I CA CWS II Unit III De watering complete cleaning sludge removal cleaning with bleaching powder painting the structure of Clarifier III dismantling of damaged sun shield roofing sheets etc
MTPS I MM C I Supply of Power supply unit with programmable interfacing display unit
MTPS I Mill Plant Unit IV Removal of accumulated ash from the horizontal portions of the mill inlet hot air ducts at 45mtr level 18mtr level and providing insulation for PA inlet hot air duct to mill for mills 4A to 4F during overhaul 2025
MTPS I Mill Plant Unit IV Reconditioning the eroded worn out Patch welded areas of Mill outlet elbow MOE removing the eroded worn out portion of the released MOE by gas cutting and preparation of new coal pipes M S plates to the required
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes to Boiler corner 1 to Corner 4 for 180 deg rotating at 16 meter level near Boiler area during Annual overhaul 2025 26
MTPS I Mill Plant Unit IV Changing of coal pipe with collar at various location in the coal pipe lines during Annual Overhaul 2025 26